Permanent Occupancy | | 1/2/2002 | 1/2/2002 | | DONE |
|
|
|
|
BLD-Final | 12/11/2001 | 12/12/2001 | 12/12/2001 | A | PASS |
Jim Sly
|
|
|
###-#### STRUCTURAL ONLY OK for Perm Occ. 12/12/2001 11:30:39 AM
|
BLD-Final | 11/14/2001 | 11/15/2001 | 11/15/2001 | A | PART |
Jim Sly
|
|
|
###-#### TOM OK for Temp Occ. C/N Obtain Perm Occ. status within 90 days. 11/15/2001 10:09:58 AM
|
FIRE-Final Inspection | 11/13/2001 | 11/13/2001 | 11/13/2001 | P | PASS |
Troy Cobbley
|
|
|
Fire/life safety OK 11/13/2001 2:33:05 PM
|
BLD-Final | 11/6/2001 | 11/7/2001 | 11/7/2001 | P | CANC |
Jim Sly
|
|
|
Chuck, ###-#### : )
|
BLD-Framing/Rough-in | 10/25/2001 | 10/26/2001 | 10/26/2001 | A | PASS |
Jim Sly
|
|
|
###-#### TOM FOR A CEILING Ceiling (Jack) ....OK 10/26/2001 9:34:56 AM
|
BLD-Framing/Rough-in | 9/24/2001 | 9/24/2001 | 9/24/2001 | P | PART |
Jim Sly
|
|
|
###-#### tom grease hood 1hr shafts appear OK. 9/24/2001 2:19:49 PM
|
BLD-Framing/Rough-in | 9/17/2001 | 9/17/2001 | 9/17/2001 | P | PART |
Jim Sly
|
|
|
fr- tom 602/7431 -hood insp 1st Insp 1hr shaft. 9/17/2001 4:42:25 PM
|
BLD-Conference | 9/13/2001 | 9/13/2001 | 9/13/2001 | P | PART |
Jim Sly
|
|
|
###-#### Tom 1st check 1 hr shafts. 9/14/2001 8:05:12 AM
|
BLD-Framing/Rough-in | 9/10/2001 | 9/11/2001 | 9/11/2001 | P | FAIL |
Jim Sly
|
|
|
###-#### C/N Truss bearing. 9/11/2001 3:55:44 PM
|
BLD-Aging Inspection | 8/29/2001 | 8/29/2001 | 8/29/2001 | | PART |
Jim Sly
|
|
|
WIP 8/29/2001 1:17:51 PM
|
BLD-Aging Inspection | 6/29/2001 | 6/29/2001 | 6/29/2001 | | PART |
Jim Sly
|
|
|
Working on project. 6/29/2001 7:48:22 AM
|