BLD-Conference | 2/22/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 301 On 2/22/2002 4:08:36 PM ..P&Z ok w/ postponement of ext work...canopies, etc. Separate permit ?? 2/25/2002 4:11:12 PM
|
BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | PASS |
Carl Dependahl
|
|
|
brett ###-#### ; grease duct system bonded. exterior canopies now on separate permit. 2/25/2002 3:56:46 PM
|
BLD-Final | 2/25/2002 | 2/25/2002 | 2/25/2002 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 407 On 2/25/2002 10:27:53 AM
|
BLD-Final | 2/22/2002 | 2/25/2002 | 2/25/2002 | A | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 301 On 2/22/2002 4:08:03 PM
|
Permanent Occupancy | | 2/25/2002 | 2/25/2002 | | DONE |
|
|
|
|
BLD-Final | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | CANC |
Jim Storey
|
|
|
###-#### brett
|
BLD-Final | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | CANC |
Jim Storey
|
|
|
rex ###-####
|
FIRE-Final Inspection | 2/21/2002 | 2/22/2002 | 2/22/2002 | A | PASS |
Rick Jackson
|
|
|
###-#### brett final occupancy approved per Dave Miller; kitchen exhaust system upgrade has been bonded 2/21/2002 3:41:32 PM
|
FIRE-Final Inspection | 2/5/2002 | 2/6/2002 | 2/7/2002 | A | CANC |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/5/2002 3:49:20 PM per Dave Miller - not to approve perm occupancy pending resolution of kitchen exhaust system 2/7/2002 3:56:23 PM
|
BLD-Conference | 2/5/2002 | 2/5/2002 | 2/5/2002 | P | PASS |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 2/5/2002 11:21:08 AM ...w/ Rick re fire final... Brett, need all finals incl plbg, hvac. 2/5/2002 5:55:53 PM
|
FIRE-Final Inspection | 2/4/2002 | 2/5/2002 | 2/5/2002 | P | NR |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/4/2002 3:13:03 PM will reschedule for 2/6; awaiting Dave Miller to return 2/5/2002 3:50:22 PM
|
BLD-Final | 2/1/2002 | 2/4/2002 | 2/4/2002 | P | NR |
Carl Dependahl
|
|
|
###-####... n/r verify all other finls & fire status re chimney,grease duct. 2/4/2002 2:36:33 PM
|
FIRE-Final Inspection | 2/1/2002 | 2/4/2002 | 2/4/2002 | A | NR |
Rick Jackson
|
|
|
###-#### need to confer with Dave Miller about final occupancy; Dave will return to work on 2/5/02 2/4/2002 3:13:53 PM
|
FIRE-Alarm Testing | 1/30/2002 | 1/30/2002 | 1/30/2002 | P | PASS |
Rick Jackson
|
|
|
Added by Inspector: 409 On 1/30/2002 4:22:28 PM all alarms complete per plans; awaiting NFPA 72 Record of Completion from Grant of Protex
|
BLD-Conference | 1/28/2002 | 1/28/2002 | 1/28/2002 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 1/28/2002 9:45:16 AM w/ GS re fires review of chimney/grease duct from restaurant...add'l lining to be added?
|
FIRE-Conference | 12/14/2001 | 12/13/2001 | 12/13/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 12/14/2001 1:56:24 PM met with Brett after a report of the FACP was in a trouble condition. room 210 has a wiring problem. issued a correction notice to have the item repaired. follow up inspection on 12/14
|
BLD-Final | 11/28/2001 | 11/29/2001 | 11/29/2001 | A | FAIL |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 11/28/2001 5:58:36 PM 9413667...c/n stair & roof guard rails, complete door hdwe, resolve grease duct issue, obtain all other finals (perm) etc. ok for t/o pend fire insp. 11/29/2001 2:17:31 PM
|
FIRE-Final Inspection | 11/28/2001 | 11/29/2001 | 11/29/2001 | A | FAIL |
Rick Jackson
|
|
|
brett ###-#### sprinkler heads in south exit; stair door on second floor needs hardware; sync alarms on 4-5-6 floors; phone line problem for dialer; c/n issued 11/30/2001 7:01:47 AM
|
BLD-Final | 11/27/2001 | 11/28/2001 | 11/28/2001 | P | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 11/28/2001 | 11/28/2001 | 11/28/2001 | P | CANC |
Carl Dependahl
|
|
|
###-#### brett
|
FIRE-Final Inspection | 11/27/2001 | 11/28/2001 | 11/28/2001 | P | NR |
Rick Jackson
|
|
|
###-#### will reschedule for 11/29/01 11/28/2001 4:18:07 PM
|
BLD-Conference | 11/26/2001 | 11/26/2001 | 11/26/2001 | P | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/26/2001 5:59:45 PM w/owner re final req's
|
FIRE-Final Inspection | 11/14/2001 | 11/14/2001 | 11/15/2001 | P | FAIL |
Rick Jackson
|
|
|
###-#### early pm//// fire panel in trouble will reinspect on 11/16/01 1 pm; storage under stairs; room detectors not programmed in room 201; need address with labels for entire building 11/15/2001 11:18:22 AM
|
BLD-Conference | 11/14/2001 | 11/14/2001 | 11/14/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/14/2001 9:09:50 AM re accessible lift, need further detail for approval; awaiting determination of elevator insp.
|
BLD-Final | 11/14/2001 | 11/14/2001 | 11/14/2001 | P | NR |
Carl Dependahl
|
|
|
###-#### ...accesible rms 201, 204 need alarms/ devices ok'd by 409...owner has til 11-19-01 for fix or tenants to vacate per Rick J. 11/16/2001 5:45:22 PM
|
BLD-Conference | 11/6/2001 | 11/7/2001 | 11/7/2001 | A | PASS |
Carl Dependahl
|
|
|
###-#### onsite w/ Brett, Ken H. & Id. State insp Gary Barnes re conflict between lift (elevator) & ADA, per elev regs, door must be w/i 3" of lift, but will not meet ADA door clearance req's !cc/ANSI t-404.2.1... will advise 11/7/2001 2:26:38 PM 11/7/2001 2:30:50 PM
|
BLD-Other | 10/22/2001 | 10/22/2001 | 10/22/2001 | | PART |
|
|
|
Letter of Compliance #20920 issued 10-22-01 to the 2nd floor apartments at the Idanha.
|
BLD-Conference | 10/19/2001 | 10/19/2001 | 10/19/2001 | P | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/19/2001 2:25:57 PM keep c/n...need make corrections to exit doors at bar. t/o ok for 2nd fl only
|
BLD-Final | 10/17/2001 | 10/18/2001 | 10/18/2001 | P | CANC |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/17/2001 5:51:27 PM 2nd fl/bsmt reinsp
|
BLD-Final | 10/18/2001 | 10/18/2001 | 10/18/2001 | P | PART |
Carl Dependahl
|
|
|
###-####,2nd fl ok for t/o; keep c/ns 10/18/2001 5:17:27 PM
|
BLD-Conference | 10/17/2001 | 10/17/2001 | 10/17/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/17/2001 10:42:14 AM w/ Ken H & GS at site re c/n of 10-16.
|
BLD-Final | 10/17/2001 | 10/17/2001 | 10/17/2001 | P | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Final | 10/15/2001 | 10/16/2001 | 10/16/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-#### brent; c/n re exits, basement corridor, 2nd fl hdwe, flooring 10/16/2001 12:32:24 PM
|
BLD-Final | 10/12/2001 | 10/15/2001 | 10/15/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/12/2001 3:57:29 PM ###-####
|
BLD-Final | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | NR |
Carl Dependahl
|
|
|
fn brett ###-#### pending
|
BLD-Final | 10/12/2001 | 10/12/2001 | 10/12/2001 | P | NR |
Carl Dependahl
|
|
|
Scheduled by Inspector: 340 On 10/12/2001 3:55:48 PM w/ brett re final ###-####... need consult w/ GS. 10/12/2001 5:28:31 PM
|
FIRE-Final Inspection | 10/11/2001 | 10/12/2001 | 10/12/2001 | A | PART |
Rick Jackson
|
|
|
fn brett ###-#### pending second floor okay except rooms 201,207 10/12/2001 4:29:49 PM
|
FIRE-Conference | 10/11/2001 | 10/11/2001 | 10/11/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 10/11/2001 3:20:38 PM met with Brett after receiving the letter from Doherty Electric dated 10/9. There were 2-3 strobes that were hanging and were repaired on the spot by Brett. I asked Brett about the alarm on the 5th floor and he said an occupant burnt something on the stove and the room detector activated and that signal indicated a supervisory at the FACP. The panel was clear upon my arrival indicating no troubles or alarms.
|
BLD-Conference | 10/9/2001 | 10/9/2001 | 10/9/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 10/9/2001 8:45:19 AM w/GS...chimney/grease duct to be evaluated by Creighton Eng'g, keep c/n...do not occupy 2nd floor
|
FIRE-Final Inspection | 10/4/2001 | 10/5/2001 | 10/5/2001 | A | NR |
Rick Jackson
|
|
|
###-#### wrong inspection called was for hydro of sprinklers 10/5/2001 2:31:42 PM
|
BLD-Final | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | NR |
Carl Dependahl
|
|
|
###-####, need fire ok, consultants report re flue/chimnney & walk thru 10/3/2001 11:14:19 AM
|
FIRE-Final Inspection | 10/2/2001 | 10/3/2001 | 10/3/2001 | A | FAIL |
Rick Jackson
|
|
|
###-#### need type 1 hood completion letter from Ken Howell to Dave Miler; sprinklers not complete 10/3/2001 11:06:08 AM
|
FIRE-Alarm Testing | 9/6/2001 | 9/6/2001 | 9/6/2001 | P | PART |
Rick Jackson
|
|
|
###-#### bret fifth floor horn strobe circuit repaired by Protex 9/7/2001 8:38:46 AM
|
BLD-Other | 8/29/2001 | 8/29/2001 | 8/29/2001 | | PART |
|
|
|
Letter of Compliance #21936 issued 8-29-01 for the 3rd floor apts. George Slane says this one will expire in full on 11-29-01 and will be treated like a temp. occ.
|
BLD-Conference | 8/28/2001 | 8/28/2001 | 8/28/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 8/28/2001 9:09:13 AM w/ Rick re grease duct/ shaft...plans to be submitted w/i 30 days or t/o may be revoked
|
BLD-Final | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### brett 3rd fl ok for t/o; c/ issued re kitch exhaust, req'd plans w/i 30 days 8/28/2001 4:44:07 PM
|
FIRE-Final Inspection | 8/27/2001 | 8/28/2001 | 8/28/2001 | A | FAIL |
Rick Jackson
|
|
|
brett c/n issued 8/28/2001 1:15:09 PM
|
FIRE-Final Inspection | 8/28/2001 | 8/28/2001 | 8/28/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 8/28/2001 2:36:26 PM okay to occupy the third floor only
|
BLD-Final | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | NR |
Carl Dependahl
|
|
|
brett ###-####--fn occ--3rd floor ? need fire. 8/27/2001 3:40:53 PM
|
FIRE-Final Inspection | 8/27/2001 | 8/27/2001 | 8/27/2001 | P | NR |
Rick Jackson
|
|
|
fire fn 3rd floor- brett ###-####
|
BLD-Aging Inspection | 8/22/2001 | 8/22/2001 | 8/22/2001 | | PART |
Carl Dependahl
|
|
|
work ongoing 8/22/2001 10:09:55 AM
|
BLD-Conference | 6/22/2001 | 6/22/2001 | 6/22/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/22/2001 8:48:46 AM w/ bldr re c/n & Rick J. re fire issues...grease duct/chimney
|
BLD-Framing/Rough-in | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | PART |
Carl Dependahl
|
|
|
###-####; 2nd fl. annex ok to rock 6/15/2001 4:01:43 PM
|
FIRE-Final Inspection | 6/14/2001 | 6/15/2001 | 6/15/2001 | A | FAIL |
Rick Jackson
|
|
|
###-#### not a final inspection but sprinkler r/i in 2nd floor annex - concealed spaces to be rocked or filled with insulation 6/15/2001 9:50:32 AM
|
BLD-Framing/Rough-in | 6/8/2001 | 6/11/2001 | 6/11/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; see c/n...firstops, dropped 1hr lid, dampers? 6/11/2001 4:16:18 PM
|
BLD-Framing/Rough-in | 6/7/2001 | 6/8/2001 | 6/8/2001 | A | NR |
Carl Dependahl
|
|
|
brett ###-####- r/i ,complete fireblocking at annex ,recall 6/8/2001 2:29:02 PM
|
BLD-Conference | 6/6/2001 | 6/6/2001 | 6/6/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 6/6/2001 8:39:15 AM w/ en Howell re c/n...need canopies at ext. hdwe at ext doors, etc. for final
|
BLD-Framing/Rough-in | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | PART |
Carl Dependahl
|
|
|
OK TO COVER ON 2ND FL BRETT- ###-####; 2nd fl west side ok to cover, c/n issued re as builts, struct mods, etc. 6/5/2001 4:17:14 PM
|
BLD-Framing/Rough-in | 6/1/2001 | 6/4/2001 | 6/4/2001 | A | FAIL |
Carl Dependahl
|
|
|
cover on the third floor ###-#### Brett; need complete firestopping above ceiling lines, remove face paper & fill cavities w/ insul or sprinkler. show header sizes 6/4/2001 5:10:35 PM
|
BLD-Final | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | FAIL |
Carl Dependahl
|
|
|
###-####; nr for final...2nd fl walk thru...need fire, etc. recall 6/4/2001 10:00:21 AM
|
FIRE-Final Inspection | 5/31/2001 | 6/1/2001 | 6/1/2001 | A | FAIL |
Rick Jackson
|
|
|
###-#### cover inspection for second floor; need coverage in bathroom; concelaed space not sprinklered 6/4/2001 5:43:28 AM
|
BLD-Framing/Rough-in | 5/31/2001 | 5/31/2001 | 5/31/2001 | P | FAIL |
Carl Dependahl
|
|
|
cover Brett ###-####...complete firestops & 1hr floors, recall 5/31/2001 6:08:33 PM 5/31/2001 6:09:29 PM
|
BLD-Framing/Rough-in | 5/1/2001 | 5/2/2001 | 5/2/2001 | A | PART |
Carl Dependahl
|
|
|
###-####, rec'd submittal for mod. at ADA rest rm at bsmt...& alternate 1hr lid assy. (UL) 5/2/2001 12:00:59 PM
|
BLD-Framing/Rough-in | 4/16/2001 | 4/17/2001 | 4/17/2001 | A | PART |
Carl Dependahl
|
|
|
###-####; 3rd fl. annex ok 4/17/2001 12:19:21 PM
|
BLD-Framing/Rough-in | 4/11/2001 | 4/12/2001 | 4/12/2001 | P | PART |
Carl Dependahl
|
|
|
3RD FLOOR BRETT ###-####, seal/ firestop walls above lids...ok to begin cover 4/12/2001 5:13:52 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/3/2001 | 4/3/2001 | A | PART |
Carl Dependahl
|
|
|
###-#### 3rd fl lids & corr. walls ok to cover; need reinsp firestops at shaft above bsmt laundry; restaurant office lid ok 4/3/2001 4:50:46 PM
|
BLD-Framing/Rough-in | 4/2/2001 | 4/2/2001 | 4/2/2001 | P | NR |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/29/2001 | 3/29/2001 | 3/29/2001 | P | PART |
Tom Arcoraci
|
|
|
Added by Inspector: 408 On 3/29/2001 2:27:06 PM ok to cover lid of north corr 3rd floor
|
BLD-Other | | | 3/29/2001 | | PART |
|
|
|
Letter of Compliance #21382 issued 3-29-01 to the Idanha for the 4th floor apartments per George Slane.
|
BLD-Final | 3/27/2001 | 3/28/2001 | 3/28/2001 | A | PART |
Russ Owen
|
|
|
on the fourth floor Brett ###-#### Signed temp oc on fourth floor appears ok, subject to reinspection from assigned inspector for permenant oc . As I went over with contractor . 3/28/2001 12:47:30 PM
|
FIRE-Final Inspection | 3/27/2001 | 3/27/2001 | 3/27/2001 | A | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 3/27/2001 11:05:12 AM 4th floor okay
|
BLD-Framing/Rough-in | 3/19/2001 | 3/20/2001 | 3/20/2001 | A | PART |
Carl Dependahl
|
|
|
###-####; 3rd fl, west area & annex. Need detail for spans of 15/8" 20ga. clg joists at corridor; eng'r to approve 16" cored holes for ducts at seismic frame (new const.)Ok to cover exc. as noted.. 3/20/2001 10:46:57 AM
|
BLD-Framing/Rough-in | 3/16/2001 | 3/16/2001 | 3/16/2001 | A | PART |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/16/2001 10:46:49 AM west 1/2 3rd fl lids ok, patch elec penetrations, keep c/n
|
BLD-Framing/Rough-in | 3/14/2001 | 3/14/2001 | 3/14/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####..keep c/n...need recall for Peter Schott bar permit 3/15/2001 9:54:05 AM
|
BLD-Framing/Rough-in | 3/13/2001 | 3/13/2001 | 3/13/2001 | P | PART |
Carl Dependahl
|
|
|
Brett ###-#### main bar area suspended lid ok 3/14/2001 9:29:41 AM
|
BLD-Framing/Rough-in | 3/7/2001 | 3/7/2001 | 3/7/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/7/2001 4:30:38 PM keep c/n: patch/seal lids for 1hr rating...new holes at 3rd fl. lid for elec; recall
|
BLD-Conference | 3/1/2001 | 3/1/2001 | 3/1/2001 | A | PASS |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 3/1/2001 11:13:08 AM w/ supt & 301 re c/n...wip recall when complete
|
BLD-Other | 2/27/2001 | 2/27/2001 | 2/27/2001 | | PART |
|
|
|
Letter of Compliance issued 2-27-01 for the 5th floor only and referenced as a temporary L.C. as per George Slane and Carl Dependahl.
|
BLD-Framing/Rough-in | 2/26/2001 | 2/26/2001 | 2/26/2001 | P | PART |
Jim Storey
|
|
|
3rd floor wall cover--brett ###-#### west sde of bld. ok for walls only. 2/26/2001 4:11:46 PM
|
BLD-Final | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | PART |
Carl Dependahl
|
|
|
5th floor Brett ###-#### 5th fl ok for t/o, keep c/n 2/23/2001 12:47:58 PM
|
BLD-Framing/Rough-in | 2/22/2001 | 2/23/2001 | 2/23/2001 | A | FAIL |
Carl Dependahl
|
|
|
3rd floor Brett ###-####; 3rd fl: c/n re 1hr lids firestops, draftstops. need other oks. 1st fl: need firestop penetrations, obtain elec at suspended clg...add wires at 48" oc to joists thru-out 2/23/2001 12:55:56 PM
|
BLD-Final | 2/22/2001 | 2/22/2001 | 2/22/2001 | P | NR |
Carl Dependahl
|
|
|
for the 5th floor temp--fn brett ###-####
|
FIRE-Final Inspection | 2/21/2001 | 2/22/2001 | 2/21/2001 | A | PART |
Rick Jackson
|
|
|
###-#### fifth floor okay 2/21/2001 2:58:34 PM
|
BLD-Final | 2/21/2001 | 2/21/2001 | 2/21/2001 | P | NR |
Carl Dependahl
|
|
|
5th floor final only brent ###-####
|
BLD-Final | 2/16/2001 | 2/20/2001 | 2/20/2001 | A | FAIL |
Rick Jackson
|
|
|
reinspection 6th floor brett ###-#### met with Ken Howell, Jim Storey, Carl Dependahl and Brett to determine requirements for occupying the fifth floor. Exits to be maintained and sprinklers to be complete on fourth floor 2/20/2001 3:14:48 PM
|
BLD-Framing/Rough-in | 2/15/2001 | 2/16/2001 | 2/16/2001 | A | FAIL |
Carl Dependahl
|
|
|
5th floor temp occ\###-####; c/n recall. 2/20/2001 4:40:16 PM
|
BLD-Conference | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 2/15/2001 4:43:44 PM Notice & order delivered per GS...no approval to occupy 6th floor has been given: 6 apts. appear to be occupied; refer to corrections of 12-00 for items to be done regarding maintaining exits and obtaining other agcy approvals.
|
FIRE-Alarm Testing | 2/14/2001 | 2/15/2001 | 2/15/2001 | A | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 2/14/2001 1:49:04 PM 8:30 need lables for room detectors; stair tower debris and exit door blocked by dumpster; sprinkler head in electrical closet on 5th floor 2/15/2001 9:25:11 AM
|
FIRE-Final Inspection | 2/15/2001 | 2/15/2001 | 2/15/2001 | P | PART |
Rick Jackson
|
|
|
Added by Inspector: 409 On 2/15/2001 2:47:58 PM 5th floor complete
|
FIRE-Final Inspection | 2/13/2001 | 2/14/2001 | 2/14/2001 | P | NR |
Rick Jackson
|
|
|
Brett ###-####
|
BLD-Framing/Rough-in | 2/12/2001 | 2/12/2001 | 2/12/2001 | P | FAIL |
Carl Dependahl
|
|
|
###-####, c/n, chk fasteners, etc at 1hr const. 2/12/2001 3:31:03 PM
|
BLD-Final | 12/27/2000 | 12/28/2000 | 12/28/2000 | A | FAIL |
Jim Storey
|
|
|
FN --BRETT ###-#### fire stop n/e stair encloser and need fire sign off. 12/28/2000 4:41:53 PM
|
BLD-Final | 12/26/2000 | 12/27/2000 | 12/27/2000 | P | CANC |
Jim Storey
|
|
|
###-#### temp occ fire insp failled not ready for insp. until fire approved. 12/27/2000 4:22:07 PM
|
FIRE-Final Inspection | 12/27/2000 | 12/27/2000 | 12/27/2000 | P | FAIL |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 12/27/2000 4:19:06 PM //// alarms not ready; dampers not working; 12/27/2000 4:19:58 PM
|
BLD-Framing/Rough-in | 12/13/2000 | 12/14/2000 | 12/13/2000 | A | NR |
Carl Dependahl
|
|
|
OK TO COVER BRETT- ###-#### keep c/n, 2nd, 3rd fl framing...seal/ patch 1hr const. 12/13/2000 4:37:28 PM
|
BLD-Framing/Rough-in | 12/12/2000 | 12/12/2000 | 12/12/2000 | P | FAIL |
Carl Dependahl
|
|
|
###-####lobby lid, seal 1hr const. 12/12/2000 5:25:45 PM
|
BLD-Conference | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | PASS |
Jim Storey
|
|
|
JIM-- ###-#### FOR CONF sch for profit meeting thur 9:00 am slane to email all involved. 12/11/2000 2:20:51 PM
|
BLD-Framing/Rough-in | 12/8/2000 | 12/11/2000 | 12/11/2000 | A | CANC |
Jim Storey
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/5/2000 | 12/6/2000 | 12/6/2000 | A | FAIL |
Carl Dependahl
|
|
|
###-####
|
BLD-Framing/Rough-in | 12/1/2000 | 12/4/2000 | 12/4/2000 | P | FAIL |
Carl Dependahl
|
|
|
Brett ###-####, need elec, seal penet rations 3d fl corr12/4/2000 5:19:29 PM 12/4/2000 5:20:03 PM
|
BLD-Framing/Rough-in | 11/16/2000 | 11/16/2000 | 11/16/2000 | A | FAIL |
Carl Dependahl
|
|
|
Added by Inspector: 340 On 11/16/2000 1:36:51 PM c/n, still need framing mod's eng'd, shaft for ducts....need verify floor faming at 1st & 4th fl.
|
BLD-Framing/Rough-in | 11/15/2000 | 11/15/2000 | 11/15/2000 | P | PART |
Carl Dependahl
|
|
|
fr insp --brett ###-####; ok to begin cover 4th fl lids, need furr-down at hvac at closets 405, and as noted 11/15/2000 4:02:48 PM
|
BLD-Framing/Rough-in | 11/13/2000 | 11/14/2000 | 11/14/2000 | P | NR |
Carl Dependahl
|
|
|
Brett ###-####
|
BLD-Framing/Rough-in | 11/3/2000 | 11/6/2000 | 11/6/2000 | A | FAIL |
Carl Dependahl
|
|
|
fr brett ###-#### , c/n issued : 1hr lids, need eng;s report for beams/ col's, fireblocks, etc. 11/6/2000 12:17:23 PM
|
BLD-Framing/Rough-in | 10/31/2000 | 11/1/2000 | 11/1/2000 | A | NR |
Jim Storey
|
|
|
###-#### reviewed engineered fire stopping of 6 inch hydronic piping assemblie must be reinstalled to meet. 11/1/2000 8:49:22 AM
|
FIRE-Final Inspection | 10/31/2000 | 10/31/2000 | 10/31/2000 | P | FAIL |
Rick Jackson
|
|
|
###-#### general contractor requested a structural inspector and this is not a fire inspection 10/31/2000 3:41:07 PM
|
BLD-Framing/Rough-in | 10/10/2000 | 10/10/2000 | 10/10/2000 | P | PART |
Jim Storey
|
|
|
brett ###-#### fr insp ceilling ok 5 th floor walls ok 4 th floor. 10/10/2000 4:47:16 PM
|
BLD-Framing/Rough-in | 10/4/2000 | 10/5/2000 | 10/5/2000 | A | FAIL |
Jim Storey
|
|
|
Brett ###-#### corridor not ready/ pipe chase south of elavator / ele flex cable 10/5/2000 10:56:32 AM
|
BLD-Framing/Rough-in | 9/25/2000 | 9/25/2000 | 9/25/2000 | P | PART |
Jim Storey
|
|
|
2 hr stair well ok for exterior cover ok to start interior gyp requirers inisp. in the progreation of attchment. 9/25/2000 5:23:01 PM
|
BLD-Framing/Rough-in | 9/15/2000 | 9/18/2000 | 9/18/2000 | A | PART |
|
|
|
Brett ###-#### ok to start patching on the third floor 9/18/2000 2:35:05 PM
|
BLD-Framing/Rough-in | 8/28/2000 | 8/28/2000 | 8/28/2000 | P | PART |
|
|
|
kim ###-#### r/i ok to start cover on fifth floor 8/29/2000 10:14:03 AM
|
BLD-Framing/Rough-in | 8/24/2000 | 8/24/2000 | 8/24/2000 | P | PART |
|
|
|
kim ###-#### fr ok to do the walls n the corridor and start rooms in the 5th floor 8/25/2000 6:00:55 PM
|
BLD-Framing/Rough-in | 7/13/2000 | 7/14/2000 | 7/14/2000 | A | PART |
|
|
|
kim --###-#### fr ok to start cover and insulation on the 6th floor 7/14/2000 4:41:35 PM
|
BLD-Framing/Rough-in | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | NR |
|
|
|
###-#### lots of work to do 7/6/00 1:36:13 PM
|
BLD-Framing/Rough-in | 6/7/2000 | 6/8/2000 | 6/8/2000 | A | PART |
|
|
|
seismic jim Campell ###-#### eng to address all seiz prior to cover 6/8/00 11:19:58 AM
|
BLD-Conference | 5/16/2000 | 5/16/2000 | 5/16/2000 | A | PART |
|
|
|
per perry for conf for am---jim-- ###-#### with super on the 5/16/00 12:36:10 PM fie stopping and fire blocking still need info from the fan mfg on the fan model # etc
5/16/00 1:47:21 PM
|
BLD-Framing/Rough-in | 5/2/2000 | 5/2/2000 | 5/2/2000 | P | PART |
|
|
|
seismic insp Jim Campell ###-#### ok for the shear nailing in the front drag strut for thr 3rd 2nd floors 5/2/00 4:05:04 PM
|
BLD-Conference | 4/21/2000 | 4/21/2000 | 4/21/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 04/21/2000 on rated penetrations requested by Jim Cambell in progress 04/24/2000 7:29:05 AM
|
BLD-Conference | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
|
|
|
###-#### with supers of all trades on the placement and use of fire caulking for the penetrations inn floors and walls 04/24/2000 7:27:26 AM
|
BLD-Conference | 3/29/2000 | 4/5/2000 | 4/10/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### in progress 04/10/2000 in progress 04/10/2000
|
BLD-Conference | 3/29/2000 | 4/5/2000 | 4/5/2000 | A | CANC |
Jim Storey
|
|
|
Scheduled by Inspector: 338 On 03/29/2000 jim ###-####
|
BLD-Conference | 3/29/2000 | 4/4/2000 | 4/4/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### in progress 04/04/2000
|
BLD-Conference | 3/29/2000 | 4/3/2000 | 4/3/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### in progress 04/03/2000
|
BLD-Concrete | 3/30/2000 | 3/31/2000 | 3/31/2000 | A | PART |
|
|
|
###-#### r-bar is placed imbed boltes placed 03/31/2000
|
BLD-Conference | 3/29/2000 | 3/31/2000 | 3/31/2000 | A | PART |
|
|
|
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### with jim cambell on the use of plastic piping for hydronics, said it may be a good idea to slow stuff down until proceedure is completed 03/31/2000
|
BLD-Framing/Rough-in | 3/29/2000 | 3/30/2000 | 3/30/2000 | A | PART |
|
|
|
jim 8614472Scheduled by Inspector: 338 On 03/29/2000 framing in progress, fire blocking etc 3/30/00 10:13:19 AM
|
BLD-Footing | 3/28/2000 | 3/29/2000 | 3/29/2000 | A | PART |
|
|
|
Jim Campell ###-#### for the new stairway footing need detail for the changes on the support inbeds, calls for 9" and 2-6" are welded together. 3/30/00 10:06:14 AM
|
FIRE-Conference | 3/24/2000 | 3/27/2000 | 3/27/2000 | A | PART |
Rick Jackson
|
|
|
Jim Campell ###-#### Sprinklers in concealed spaces (must be under 6"). 3/28/00 8:52:20 AM
|
BLD-Framing/Rough-in | 3/22/2000 | 3/23/2000 | 3/23/2000 | A | PART |
|
|
|
shear wall Jim ###-####
|
BLD-Conference | 3/14/2000 | 3/16/2000 | 3/16/2000 | A | PART |
|
|
|
jim --###-#### conf told Jim that no concrete was to be poured on this jobsite without my approvals, stoped the pour in progress: special insp letter not on jobsite and no sp insp was approved by me. discussed damper locations and installation with the mech cont. TML (Merle and Joe) 03/17/2000 9:10:48 AM
|