Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03148
StatusFinaled
Name KEN HOWELL (OWN REP)
Site Address 928 W MAIN ST
Project NameIDANHA
Customer Number 
ePlanReviewNo
Description
(THE IDANHA HOTEL) This building is fire sprinklered per 1994 UCBC provisions to allow it to be too tall and too big. To convert floors 2 through 6 of a former hotel to apartment units (53 renovated units). Work is to include a new beam and columns to support the 2nd floor, additional floor joists at the 2nd, 3rd, and 4th floors, a new 2-hr stair enclosure, a fire alarm system, seismic upgrade, a renovated fire sprinkler system, two apartments accessible to the disabled, two street level entrance canopies, a new built up roof covering, and exterior wall refurbishing all per approved drawings, engineering, and plan review conditions on file. Rotten or damaged joists shall be repaired or replaced. New work shall comply with Type III-1hr provisions. The fire sprinker system shall comply with NFPA 13-1996 as regulated by the Fire Department. This permit does not establish a Certificate of Occupancy for any tenant in the basement or on the first floor. PC-841-99 DRH99-00218 **CJW** (12-17-99) A demolition permit (BLD99-03653) was approved.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference2/22/20022/25/20022/25/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 301 On 2/22/2002 4:08:36 PM ..P&Z ok w/ postponement of ext work...canopies, etc. Separate permit ?? 2/25/2002 4:11:12 PM
BLD-Final2/25/20022/25/20022/25/2002PPASS
DetailsCarl Dependahl
brett ###-#### ; grease duct system bonded. exterior canopies now on separate permit. 2/25/2002 3:56:46 PM
BLD-Final2/25/20022/25/20022/25/2002PCANC
DetailsCarl Dependahl
Scheduled by Inspector: 407 On 2/25/2002 10:27:53 AM
BLD-Final2/22/20022/25/20022/25/2002ACANC
DetailsCarl Dependahl
Scheduled by Inspector: 301 On 2/22/2002 4:08:03 PM
Permanent Occupancy 2/25/20022/25/2002 DONE
Details
BLD-Final2/21/20022/22/20022/22/2002ACANC
DetailsJim Storey
###-#### brett
BLD-Final2/21/20022/22/20022/22/2002ACANC
DetailsJim Storey
rex ###-####
FIRE-Final Inspection2/21/20022/22/20022/22/2002APASS
DetailsRick Jackson
###-#### brett final occupancy approved per Dave Miller; kitchen exhaust system upgrade has been bonded 2/21/2002 3:41:32 PM
FIRE-Final Inspection2/5/20022/6/20022/7/2002ACANC
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/5/2002 3:49:20 PM per Dave Miller - not to approve perm occupancy pending resolution of kitchen exhaust system 2/7/2002 3:56:23 PM
BLD-Conference2/5/20022/5/20022/5/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 2/5/2002 11:21:08 AM ...w/ Rick re fire final... Brett, need all finals incl plbg, hvac. 2/5/2002 5:55:53 PM
FIRE-Final Inspection2/4/20022/5/20022/5/2002PNR
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/4/2002 3:13:03 PM will reschedule for 2/6; awaiting Dave Miller to return 2/5/2002 3:50:22 PM
BLD-Final2/1/20022/4/20022/4/2002PNR
DetailsCarl Dependahl
###-####... n/r verify all other finls & fire status re chimney,grease duct. 2/4/2002 2:36:33 PM
FIRE-Final Inspection2/1/20022/4/20022/4/2002ANR
DetailsRick Jackson
###-#### need to confer with Dave Miller about final occupancy; Dave will return to work on 2/5/02 2/4/2002 3:13:53 PM
FIRE-Alarm Testing1/30/20021/30/20021/30/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 1/30/2002 4:22:28 PM all alarms complete per plans; awaiting NFPA 72 Record of Completion from Grant of Protex
BLD-Conference1/28/20021/28/20021/28/2002APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 1/28/2002 9:45:16 AM w/ GS re fires review of chimney/grease duct from restaurant...add'l lining to be added?
FIRE-Conference12/14/200112/13/200112/13/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 12/14/2001 1:56:24 PM met with Brett after a report of the FACP was in a trouble condition. room 210 has a wiring problem. issued a correction notice to have the item repaired. follow up inspection on 12/14
BLD-Final11/28/200111/29/200111/29/2001AFAIL
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 11/28/2001 5:58:36 PM 9413667...c/n stair & roof guard rails, complete door hdwe, resolve grease duct issue, obtain all other finals (perm) etc. ok for t/o pend fire insp. 11/29/2001 2:17:31 PM
FIRE-Final Inspection11/28/200111/29/200111/29/2001AFAIL
DetailsRick Jackson
brett ###-#### sprinkler heads in south exit; stair door on second floor needs hardware; sync alarms on 4-5-6 floors; phone line problem for dialer; c/n issued 11/30/2001 7:01:47 AM
BLD-Final11/27/200111/28/200111/28/2001PNR
DetailsCarl Dependahl
###-####
BLD-Final11/28/200111/28/200111/28/2001PCANC
DetailsCarl Dependahl
###-#### brett
FIRE-Final Inspection11/27/200111/28/200111/28/2001PNR
DetailsRick Jackson
###-#### will reschedule for 11/29/01 11/28/2001 4:18:07 PM
BLD-Conference11/26/200111/26/200111/26/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/26/2001 5:59:45 PM w/owner re final req's
FIRE-Final Inspection11/14/200111/14/200111/15/2001PFAIL
DetailsRick Jackson
###-#### early pm//// fire panel in trouble will reinspect on 11/16/01 1 pm; storage under stairs; room detectors not programmed in room 201; need address with labels for entire building 11/15/2001 11:18:22 AM
BLD-Conference11/14/200111/14/200111/14/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/14/2001 9:09:50 AM re accessible lift, need further detail for approval; awaiting determination of elevator insp.
BLD-Final11/14/200111/14/200111/14/2001PNR
DetailsCarl Dependahl
###-#### ...accesible rms 201, 204 need alarms/ devices ok'd by 409...owner has til 11-19-01 for fix or tenants to vacate per Rick J. 11/16/2001 5:45:22 PM
BLD-Conference11/6/200111/7/200111/7/2001APASS
DetailsCarl Dependahl
###-#### onsite w/ Brett, Ken H. & Id. State insp Gary Barnes re conflict between lift (elevator) & ADA, per elev regs, door must be w/i 3" of lift, but will not meet ADA door clearance req's !cc/ANSI t-404.2.1... will advise 11/7/2001 2:26:38 PM 11/7/2001 2:30:50 PM
BLD-Other10/22/200110/22/200110/22/2001 PART
Letter of Compliance #20920 issued 10-22-01 to the 2nd floor apartments at the Idanha.
BLD-Conference10/19/200110/19/200110/19/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 10/19/2001 2:25:57 PM keep c/n...need make corrections to exit doors at bar. t/o ok for 2nd fl only
BLD-Final10/17/200110/18/200110/18/2001PCANC
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 10/17/2001 5:51:27 PM 2nd fl/bsmt reinsp
BLD-Final10/18/200110/18/200110/18/2001PPART
DetailsCarl Dependahl
###-####,2nd fl ok for t/o; keep c/ns 10/18/2001 5:17:27 PM
BLD-Conference10/17/200110/17/200110/17/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/17/2001 10:42:14 AM w/ Ken H & GS at site re c/n of 10-16.
BLD-Final10/17/200110/17/200110/17/2001PNR
DetailsCarl Dependahl
###-####
BLD-Final10/15/200110/16/200110/16/2001AFAIL
DetailsCarl Dependahl
###-#### brent; c/n re exits, basement corridor, 2nd fl hdwe, flooring 10/16/2001 12:32:24 PM
BLD-Final10/12/200110/15/200110/15/2001PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 10/12/2001 3:57:29 PM ###-####
BLD-Final10/11/200110/12/200110/12/2001ANR
DetailsCarl Dependahl
fn brett ###-#### pending
BLD-Final10/12/200110/12/200110/12/2001PNR
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 10/12/2001 3:55:48 PM w/ brett re final ###-####... need consult w/ GS. 10/12/2001 5:28:31 PM
FIRE-Final Inspection10/11/200110/12/200110/12/2001APART
DetailsRick Jackson
fn brett ###-#### pending second floor okay except rooms 201,207 10/12/2001 4:29:49 PM
FIRE-Conference10/11/200110/11/200110/11/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 10/11/2001 3:20:38 PM met with Brett after receiving the letter from Doherty Electric dated 10/9. There were 2-3 strobes that were hanging and were repaired on the spot by Brett. I asked Brett about the alarm on the 5th floor and he said an occupant burnt something on the stove and the room detector activated and that signal indicated a supervisory at the FACP. The panel was clear upon my arrival indicating no troubles or alarms.
BLD-Conference10/9/200110/9/200110/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 10/9/2001 8:45:19 AM w/GS...chimney/grease duct to be evaluated by Creighton Eng'g, keep c/n...do not occupy 2nd floor
FIRE-Final Inspection10/4/200110/5/200110/5/2001ANR
DetailsRick Jackson
###-#### wrong inspection called was for hydro of sprinklers 10/5/2001 2:31:42 PM
BLD-Final10/2/200110/3/200110/3/2001ANR
DetailsCarl Dependahl
###-####, need fire ok, consultants report re flue/chimnney & walk thru 10/3/2001 11:14:19 AM
FIRE-Final Inspection10/2/200110/3/200110/3/2001AFAIL
DetailsRick Jackson
###-#### need type 1 hood completion letter from Ken Howell to Dave Miler; sprinklers not complete 10/3/2001 11:06:08 AM
FIRE-Alarm Testing9/6/20019/6/20019/6/2001PPART
DetailsRick Jackson
###-#### bret fifth floor horn strobe circuit repaired by Protex 9/7/2001 8:38:46 AM
BLD-Other8/29/20018/29/20018/29/2001 PART
Letter of Compliance #21936 issued 8-29-01 for the 3rd floor apts. George Slane says this one will expire in full on 11-29-01 and will be treated like a temp. occ.
BLD-Conference8/28/20018/28/20018/28/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/28/2001 9:09:13 AM w/ Rick re grease duct/ shaft...plans to be submitted w/i 30 days or t/o may be revoked
BLD-Final8/27/20018/28/20018/28/2001APART
DetailsCarl Dependahl
###-#### brett 3rd fl ok for t/o; c/ issued re kitch exhaust, req'd plans w/i 30 days 8/28/2001 4:44:07 PM
FIRE-Final Inspection8/27/20018/28/20018/28/2001AFAIL
DetailsRick Jackson
brett c/n issued 8/28/2001 1:15:09 PM
FIRE-Final Inspection8/28/20018/28/20018/28/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 8/28/2001 2:36:26 PM okay to occupy the third floor only
BLD-Final8/27/20018/27/20018/27/2001PNR
DetailsCarl Dependahl
brett ###-####--fn occ--3rd floor ? need fire. 8/27/2001 3:40:53 PM
FIRE-Final Inspection8/27/20018/27/20018/27/2001PNR
DetailsRick Jackson
fire fn 3rd floor- brett ###-####
BLD-Aging Inspection8/22/20018/22/20018/22/2001 PART
DetailsCarl Dependahl
work ongoing 8/22/2001 10:09:55 AM
BLD-Conference6/22/20016/22/20016/22/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/22/2001 8:48:46 AM w/ bldr re c/n & Rick J. re fire issues...grease duct/chimney
BLD-Framing/Rough-in6/14/20016/15/20016/15/2001APART
DetailsCarl Dependahl
###-####; 2nd fl. annex ok to rock 6/15/2001 4:01:43 PM
FIRE-Final Inspection6/14/20016/15/20016/15/2001AFAIL
DetailsRick Jackson
###-#### not a final inspection but sprinkler r/i in 2nd floor annex - concealed spaces to be rocked or filled with insulation 6/15/2001 9:50:32 AM
BLD-Framing/Rough-in6/8/20016/11/20016/11/2001AFAIL
DetailsCarl Dependahl
###-####; see c/n...firstops, dropped 1hr lid, dampers? 6/11/2001 4:16:18 PM
BLD-Framing/Rough-in6/7/20016/8/20016/8/2001ANR
DetailsCarl Dependahl
brett ###-####- r/i ,complete fireblocking at annex ,recall 6/8/2001 2:29:02 PM
BLD-Conference6/6/20016/6/20016/6/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 6/6/2001 8:39:15 AM w/ en Howell re c/n...need canopies at ext. hdwe at ext doors, etc. for final
BLD-Framing/Rough-in6/5/20016/5/20016/5/2001PPART
DetailsCarl Dependahl
OK TO COVER ON 2ND FL BRETT- ###-####; 2nd fl west side ok to cover, c/n issued re as builts, struct mods, etc. 6/5/2001 4:17:14 PM
BLD-Framing/Rough-in6/1/20016/4/20016/4/2001AFAIL
DetailsCarl Dependahl
cover on the third floor ###-#### Brett; need complete firestopping above ceiling lines, remove face paper & fill cavities w/ insul or sprinkler. show header sizes 6/4/2001 5:10:35 PM
BLD-Final5/31/20016/1/20016/1/2001AFAIL
DetailsCarl Dependahl
###-####; nr for final...2nd fl walk thru...need fire, etc. recall 6/4/2001 10:00:21 AM
FIRE-Final Inspection5/31/20016/1/20016/1/2001AFAIL
DetailsRick Jackson
###-#### cover inspection for second floor; need coverage in bathroom; concelaed space not sprinklered 6/4/2001 5:43:28 AM
BLD-Framing/Rough-in5/31/20015/31/20015/31/2001PFAIL
DetailsCarl Dependahl
cover Brett ###-####...complete firestops & 1hr floors, recall 5/31/2001 6:08:33 PM 5/31/2001 6:09:29 PM
BLD-Framing/Rough-in5/1/20015/2/20015/2/2001APART
DetailsCarl Dependahl
###-####, rec'd submittal for mod. at ADA rest rm at bsmt...& alternate 1hr lid assy. (UL) 5/2/2001 12:00:59 PM
BLD-Framing/Rough-in4/16/20014/17/20014/17/2001APART
DetailsCarl Dependahl
###-####; 3rd fl. annex ok 4/17/2001 12:19:21 PM
BLD-Framing/Rough-in4/11/20014/12/20014/12/2001PPART
DetailsCarl Dependahl
3RD FLOOR BRETT ###-####, seal/ firestop walls above lids...ok to begin cover 4/12/2001 5:13:52 PM
BLD-Framing/Rough-in4/2/20014/3/20014/3/2001APART
DetailsCarl Dependahl
###-#### 3rd fl lids & corr. walls ok to cover; need reinsp firestops at shaft above bsmt laundry; restaurant office lid ok 4/3/2001 4:50:46 PM
BLD-Framing/Rough-in4/2/20014/2/20014/2/2001PNR
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in3/29/20013/29/20013/29/2001PPART
DetailsTom Arcoraci
Added by Inspector: 408 On 3/29/2001 2:27:06 PM ok to cover lid of north corr 3rd floor
BLD-Other  3/29/2001 PART
Letter of Compliance #21382 issued 3-29-01 to the Idanha for the 4th floor apartments per George Slane.
BLD-Final3/27/20013/28/20013/28/2001APART
DetailsRuss Owen
on the fourth floor Brett ###-#### Signed temp oc on fourth floor appears ok, subject to reinspection from assigned inspector for permenant oc . As I went over with contractor . 3/28/2001 12:47:30 PM
FIRE-Final Inspection3/27/20013/27/20013/27/2001APART
DetailsRick Jackson
Added by Inspector: 409 On 3/27/2001 11:05:12 AM 4th floor okay
BLD-Framing/Rough-in3/19/20013/20/20013/20/2001APART
DetailsCarl Dependahl
###-####; 3rd fl, west area & annex. Need detail for spans of 15/8" 20ga. clg joists at corridor; eng'r to approve 16" cored holes for ducts at seismic frame (new const.)Ok to cover exc. as noted.. 3/20/2001 10:46:57 AM
BLD-Framing/Rough-in3/16/20013/16/20013/16/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 3/16/2001 10:46:49 AM west 1/2 3rd fl lids ok, patch elec penetrations, keep c/n
BLD-Framing/Rough-in3/14/20013/14/20013/14/2001PFAIL
DetailsCarl Dependahl
###-####..keep c/n...need recall for Peter Schott bar permit 3/15/2001 9:54:05 AM
BLD-Framing/Rough-in3/13/20013/13/20013/13/2001PPART
DetailsCarl Dependahl
Brett ###-#### main bar area suspended lid ok 3/14/2001 9:29:41 AM
BLD-Framing/Rough-in3/7/20013/7/20013/7/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 3/7/2001 4:30:38 PM keep c/n: patch/seal lids for 1hr rating...new holes at 3rd fl. lid for elec; recall
BLD-Conference3/1/20013/1/20013/1/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 3/1/2001 11:13:08 AM w/ supt & 301 re c/n...wip recall when complete
BLD-Other2/27/20012/27/20012/27/2001 PART
Letter of Compliance issued 2-27-01 for the 5th floor only and referenced as a temporary L.C. as per George Slane and Carl Dependahl.
BLD-Framing/Rough-in2/26/20012/26/20012/26/2001PPART
DetailsJim Storey
3rd floor wall cover--brett ###-#### west sde of bld. ok for walls only. 2/26/2001 4:11:46 PM
BLD-Final2/22/20012/23/20012/23/2001APART
DetailsCarl Dependahl
5th floor Brett ###-#### 5th fl ok for t/o, keep c/n 2/23/2001 12:47:58 PM
BLD-Framing/Rough-in2/22/20012/23/20012/23/2001AFAIL
DetailsCarl Dependahl
3rd floor Brett ###-####; 3rd fl: c/n re 1hr lids firestops, draftstops. need other oks. 1st fl: need firestop penetrations, obtain elec at suspended clg...add wires at 48" oc to joists thru-out 2/23/2001 12:55:56 PM
BLD-Final2/22/20012/22/20012/22/2001PNR
DetailsCarl Dependahl
for the 5th floor temp--fn brett ###-####
FIRE-Final Inspection2/21/20012/22/20012/21/2001APART
DetailsRick Jackson
###-#### fifth floor okay 2/21/2001 2:58:34 PM
BLD-Final2/21/20012/21/20012/21/2001PNR
DetailsCarl Dependahl
5th floor final only brent ###-####
BLD-Final2/16/20012/20/20012/20/2001AFAIL
DetailsRick Jackson
reinspection 6th floor brett ###-#### met with Ken Howell, Jim Storey, Carl Dependahl and Brett to determine requirements for occupying the fifth floor. Exits to be maintained and sprinklers to be complete on fourth floor 2/20/2001 3:14:48 PM
BLD-Framing/Rough-in2/15/20012/16/20012/16/2001AFAIL
DetailsCarl Dependahl
5th floor temp occ\###-####; c/n recall. 2/20/2001 4:40:16 PM
BLD-Conference2/15/20012/15/20012/15/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 2/15/2001 4:43:44 PM Notice & order delivered per GS...no approval to occupy 6th floor has been given: 6 apts. appear to be occupied; refer to corrections of 12-00 for items to be done regarding maintaining exits and obtaining other agcy approvals.
FIRE-Alarm Testing2/14/20012/15/20012/15/2001AFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 2/14/2001 1:49:04 PM 8:30 need lables for room detectors; stair tower debris and exit door blocked by dumpster; sprinkler head in electrical closet on 5th floor 2/15/2001 9:25:11 AM
FIRE-Final Inspection2/15/20012/15/20012/15/2001PPART
DetailsRick Jackson
Added by Inspector: 409 On 2/15/2001 2:47:58 PM 5th floor complete
FIRE-Final Inspection2/13/20012/14/20012/14/2001PNR
DetailsRick Jackson
Brett ###-####
BLD-Framing/Rough-in2/12/20012/12/20012/12/2001PFAIL
DetailsCarl Dependahl
###-####, c/n, chk fasteners, etc at 1hr const. 2/12/2001 3:31:03 PM
BLD-Final12/27/200012/28/200012/28/2000AFAIL
DetailsJim Storey
FN --BRETT ###-#### fire stop n/e stair encloser and need fire sign off. 12/28/2000 4:41:53 PM
BLD-Final12/26/200012/27/200012/27/2000PCANC
DetailsJim Storey
###-#### temp occ fire insp failled not ready for insp. until fire approved. 12/27/2000 4:22:07 PM
FIRE-Final Inspection12/27/200012/27/200012/27/2000PFAIL
DetailsRick Jackson
Scheduled by Inspector: 409 On 12/27/2000 4:19:06 PM //// alarms not ready; dampers not working; 12/27/2000 4:19:58 PM
BLD-Framing/Rough-in12/13/200012/14/200012/13/2000ANR
DetailsCarl Dependahl
OK TO COVER BRETT- ###-#### keep c/n, 2nd, 3rd fl framing...seal/ patch 1hr const. 12/13/2000 4:37:28 PM
BLD-Framing/Rough-in12/12/200012/12/200012/12/2000PFAIL
DetailsCarl Dependahl
###-####lobby lid, seal 1hr const. 12/12/2000 5:25:45 PM
BLD-Conference12/8/200012/11/200012/11/2000APASS
DetailsJim Storey
JIM-- ###-#### FOR CONF sch for profit meeting thur 9:00 am slane to email all involved. 12/11/2000 2:20:51 PM
BLD-Framing/Rough-in12/8/200012/11/200012/11/2000ACANC
DetailsJim Storey
###-####
BLD-Framing/Rough-in12/5/200012/6/200012/6/2000AFAIL
DetailsCarl Dependahl
###-####
BLD-Framing/Rough-in12/1/200012/4/200012/4/2000PFAIL
DetailsCarl Dependahl
Brett ###-####, need elec, seal penet rations 3d fl corr12/4/2000 5:19:29 PM 12/4/2000 5:20:03 PM
BLD-Framing/Rough-in11/16/200011/16/200011/16/2000AFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2000 1:36:51 PM c/n, still need framing mod's eng'd, shaft for ducts....need verify floor faming at 1st & 4th fl.
BLD-Framing/Rough-in11/15/200011/15/200011/15/2000PPART
DetailsCarl Dependahl
fr insp --brett ###-####; ok to begin cover 4th fl lids, need furr-down at hvac at closets 405, and as noted 11/15/2000 4:02:48 PM
BLD-Framing/Rough-in11/13/200011/14/200011/14/2000PNR
DetailsCarl Dependahl
Brett ###-####
BLD-Framing/Rough-in11/3/200011/6/200011/6/2000AFAIL
DetailsCarl Dependahl
fr brett ###-#### , c/n issued : 1hr lids, need eng;s report for beams/ col's, fireblocks, etc. 11/6/2000 12:17:23 PM
BLD-Framing/Rough-in10/31/200011/1/200011/1/2000ANR
DetailsJim Storey
###-#### reviewed engineered fire stopping of 6 inch hydronic piping assemblie must be reinstalled to meet. 11/1/2000 8:49:22 AM
FIRE-Final Inspection10/31/200010/31/200010/31/2000PFAIL
DetailsRick Jackson
###-#### general contractor requested a structural inspector and this is not a fire inspection 10/31/2000 3:41:07 PM
BLD-Framing/Rough-in10/10/200010/10/200010/10/2000PPART
DetailsJim Storey
brett ###-#### fr insp ceilling ok 5 th floor walls ok 4 th floor. 10/10/2000 4:47:16 PM
BLD-Framing/Rough-in10/4/200010/5/200010/5/2000AFAIL
DetailsJim Storey
Brett ###-#### corridor not ready/ pipe chase south of elavator / ele flex cable 10/5/2000 10:56:32 AM
BLD-Framing/Rough-in9/25/20009/25/20009/25/2000PPART
DetailsJim Storey
2 hr stair well ok for exterior cover ok to start interior gyp requirers inisp. in the progreation of attchment. 9/25/2000 5:23:01 PM
BLD-Framing/Rough-in9/15/20009/18/20009/18/2000APART
Details
Brett ###-#### ok to start patching on the third floor 9/18/2000 2:35:05 PM
BLD-Framing/Rough-in8/28/20008/28/20008/28/2000PPART
Details
kim ###-#### r/i ok to start cover on fifth floor 8/29/2000 10:14:03 AM
BLD-Framing/Rough-in8/24/20008/24/20008/24/2000PPART
Details
kim ###-#### fr ok to do the walls n the corridor and start rooms in the 5th floor 8/25/2000 6:00:55 PM
BLD-Framing/Rough-in7/13/20007/14/20007/14/2000APART
Details
kim --###-#### fr ok to start cover and insulation on the 6th floor 7/14/2000 4:41:35 PM
BLD-Framing/Rough-in7/6/20007/6/20007/6/2000PNR
Details
###-#### lots of work to do 7/6/00 1:36:13 PM
BLD-Framing/Rough-in6/7/20006/8/20006/8/2000APART
Details
seismic jim Campell ###-#### eng to address all seiz prior to cover 6/8/00 11:19:58 AM
BLD-Conference5/16/20005/16/20005/16/2000APART
Details
per perry for conf for am---jim-- ###-#### with super on the 5/16/00 12:36:10 PM fie stopping and fire blocking still need info from the fan mfg on the fan model # etc
5/16/00 1:47:21 PM
BLD-Framing/Rough-in5/2/20005/2/20005/2/2000PPART
Details
seismic insp Jim Campell ###-#### ok for the shear nailing in the front drag strut for thr 3rd 2nd floors 5/2/00 4:05:04 PM
BLD-Conference4/21/20004/21/20004/21/2000APART
Details
Scheduled by Inspector: 338 On 04/21/2000 on rated penetrations requested by Jim Cambell in progress 04/24/2000 7:29:05 AM
BLD-Conference4/20/20004/20/20004/20/2000PPART
Details
###-#### with supers of all trades on the placement and use of fire caulking for the penetrations inn floors and walls 04/24/2000 7:27:26 AM
BLD-Conference3/29/20004/5/20004/10/2000APART
Details
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### in progress 04/10/2000 in progress 04/10/2000
BLD-Conference3/29/20004/5/20004/5/2000ACANC
DetailsJim Storey
Scheduled by Inspector: 338 On 03/29/2000 jim ###-####
BLD-Conference3/29/20004/4/20004/4/2000APART
Details
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### in progress 04/04/2000
BLD-Conference3/29/20004/3/20004/3/2000APART
Details
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### in progress 04/03/2000
BLD-Concrete3/30/20003/31/20003/31/2000APART
Details
###-#### r-bar is placed imbed boltes placed 03/31/2000
BLD-Conference3/29/20003/31/20003/31/2000APART
Details
Scheduled by Inspector: 338 On 03/29/2000 jim ###-#### with jim cambell on the use of plastic piping for hydronics, said it may be a good idea to slow stuff down until proceedure is completed 03/31/2000
BLD-Framing/Rough-in3/29/20003/30/20003/30/2000APART
Details
jim 8614472Scheduled by Inspector: 338 On 03/29/2000 framing in progress, fire blocking etc 3/30/00 10:13:19 AM
BLD-Footing3/28/20003/29/20003/29/2000APART
Details
Jim Campell ###-#### for the new stairway footing need detail for the changes on the support inbeds, calls for 9" and 2-6" are welded together. 3/30/00 10:06:14 AM
FIRE-Conference3/24/20003/27/20003/27/2000APART
DetailsRick Jackson
Jim Campell ###-#### Sprinklers in concealed spaces (must be under 6"). 3/28/00 8:52:20 AM
BLD-Framing/Rough-in3/22/20003/23/20003/23/2000APART
Details
shear wall Jim ###-####
BLD-Conference3/14/20003/16/20003/16/2000APART
Details
jim --###-#### conf told Jim that no concrete was to be poured on this jobsite without my approvals, stoped the pour in progress: special insp letter not on jobsite and no sp insp was approved by me. discussed damper locations and installation with the mech cont. TML (Merle and Joe) 03/17/2000 9:10:48 AM