Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03170
StatusFinaled
Name MOORE WINSTON H
Site Address 8854 W EMERALD ST
Project NameW BOISE PROF COMPLEX
Customer Number 
ePlanReviewNo
Description
WEST BOISE PROFESSIONAL BUILDING * TO CONSTRUCT A NEW 33,495 SQ. FT., TWO STORY OFFICE SHELL AND CORE BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF CONCRETE FOUNDATION AND SLAB FLOOR, STEEL MOMENT FRAME, METAL STUD EXTERIOR WALLS, MASONRY CORE WALLS AND STEEL FRAME ROOF SYSTEM AND METAL ROOF DECK. THIS BUILDING IS FULLY FIRE SPRINKLED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THIS IS A SHELL AND CORE PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. SEPARATE TENANT IMPROVEMENT PERMITS ARE REQUIRED TO FINISH THIS BUILDING FOR OCCUPANCY. DRH99-00200/PC#845-99/JCM GRADING PERMIT BLD99-03181, AND FOUNDATION PERMIT BLD99-03168, ARE EACH ROUTING ON SEPARATE SETS OF PLANS. KMM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final9/26/20009/27/20009/27/2000APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 09/26/2000 at 14:45:56. Contact: ###-####.card to contractor, l/c only for shell 9/27/2000 1:08:19 PM
FIRE-Final Inspection9/25/20009/26/20009/26/2000PPASS
DetailsJoe Tawney
###-####. Reinsp OK for Certificate of completion 9/27/2000 8:08:47 AM
FIRE-Final Inspection9/13/20009/13/20009/13/2000PFAIL
DetailsJoe Tawney
###-####. Reinsp Fail C/N not completed 9/14/2000 7:49:59 AM
FIRE-Final Inspection8/28/20008/28/20008/28/2000PFAIL
DetailsJoe Tawney
###-#### Final Fail C/N issued 8/29/2000 1:47:03 PM
BLD-Final8/24/20008/25/20008/25/2000PFAIL
DetailsCarl Dependahl
jerry-- ###-#### fn...nr 8/25/2000 4:38:23 PM
FIRE-Final Inspection8/25/20008/25/20008/25/2000PCANC
DetailsJoe Tawney
jerry--###-#### fn fire---fire spr & fire life safety Cancel Resched for 8/28 or later 8/25/2000 4:38:06 PM
BLD-Conference8/24/20008/24/20008/24/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/24/2000 w/ supt...need fire & all other agcy oks on card for final
BLD-Conference8/17/20008/17/20008/17/2000APART
DetailsCarl Dependahl
Added by Inspector: 340 On 8/17/2000 w/ cont re finals
BLD-Conference8/4/20008/7/20008/7/2000APASS
DetailsCarl Dependahl
Jerry ###-####
BLD-Conference7/20/20007/20/20007/20/2000PFAIL
DetailsCarl Dependahl
###-####- JERRY CONF ; need detail for reglet at corr. 7/21/2000 8:38:37 AM
BLD-Framing/Rough-in7/17/20007/18/20007/18/2000APART
DetailsCarl Dependahl
###-#### Ext. walls ok to cover, "penthouse" ok. 7/18/00 2:47:11 PM
BLD-Framing/Rough-in7/13/20007/13/20007/13/2000PPART
DetailsCarl Dependahl
###-#### Pending all spec. insp. reports 7/14/00 9:27:54 AM
BLD-Framing/Rough-in7/10/20007/11/20007/11/2000AFAIL
DetailsCarl Dependahl
###-####--jerry fr C/N w/bld00-01084 7/12/00 10:29:54 AM
BLD-Framing/Rough-in7/6/20007/6/20007/6/2000PPART
DetailsCarl Dependahl
###-#### Stair enclosure lid(s) ok to cover (per plan). 7/7/00 1:36:45 PM
BLD-Framing/Rough-in6/27/20006/27/20006/27/2000PPART
DetailsCarl Dependahl
###-#### "core" area pend spec insp report 6/28/00 2:12:51 PM
BLD-Framing/Rough-in6/22/20006/22/20006/22/2000PFAIL
DetailsCarl Dependahl
###-#### Nobody home, left card 6/23/00 11:18:37 AM
BLD-Framing/Rough-in5/26/20005/26/20005/26/2000APART
DetailsCarl Dependahl
Elev. shaft: need eng's ok for 1/4 blocks, etc. ok to continue.
BLD-Framing/Rough-in5/25/20005/25/20005/25/2000PNR
DetailsCarl Dependahl
Jerry Wylie ###-####
BLD-Framing/Rough-in5/4/20005/4/20005/4/2000APART
DetailsCarl Dependahl
Professional complex- 1st floor curtain walls, EFIS & paper.
BLD-Framing/Rough-in5/1/20005/1/20005/1/2000PPART
DetailsCarl Dependahl
###-####
BLD-Conference4/17/20004/17/20004/17/2000APASS
DetailsCarl Dependahl
Reviewed use of PVC conduit & ent. ok
BLD-Conference4/7/20004/7/20004/7/2000PPASS
DetailsCarl Dependahl
Ok to use ENT or PVC
BLD-Concrete3/21/20003/21/20003/21/2000PPART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 03/21/2000 at 07:41:59. Contact: ###-####. Pending spec. insp./eng's report. 3/22/00 3:19:43 PM
BLD-Conference3/20/20003/20/20003/20/2000APASS
DetailsCarl Dependahl
W/bldr. re: special insp. reports.
BLD-Foundation2/8/20002/9/20002/9/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/08/2000 at 11:54:46. Contact: ###-####. Sp insp
BLD-Concrete1/27/20001/28/20001/28/2000APART
DetailsTom Arcoraci
Masonary insp. Bob- ###-####. spec insp on site stair tower 1/28/00 11:25:42 AM
BLD-Concrete1/24/20001/24/20001/24/2000PPART
DetailsCarl Dependahl
###-#### beginning masonary special insp1/31/00 9:01:34 AM
FIRE-Sprinkler Rough-in1/4/20001/4/20001/4/2000PPART
DetailsJoe Tawney
TERRY--- ###-#### R/I. Ok on supply line cover.