BLD-Final | 6/19/2000 | 6/19/2000 | 6/19/2000 | P | PASS |
Russ Owen
|
|
|
CN made ok LC issued.
|
BLD-Final | 6/15/2000 | 6/16/2000 | 6/16/2000 | P | FAIL |
Russ Owen
|
|
|
###-#### guardrail minimum 36" and 4" max on verticals 6/19/00 2:12:44 PM
|
BLD-Final | 6/14/2000 | 6/15/2000 | 6/15/2000 | P | FAIL |
Russ Owen
|
|
|
ron ###-#### C/N posted 6/16/00 9:09:14 AM
|
BLD-Grading Inspection | 6/15/2000 | 6/15/2000 | 6/15/2000 | | BOND |
Rita DeYoung
|
|
|
Grading is complete but revegetation is not. The engineer has recommended a $500.00 bond. This is acceptable and has been submitted. The contractor must place a silt fence along the bottom of the slope at the rear of the lot. When this is complete the grading and drainage is conditionally approved.
|
BLD-Conference | 4/12/2000 | 4/12/2000 | 4/12/2000 | P | PART |
|
|
|
Mark ###-#### c/n issued landings and enclosed usable space under stairs 04/12/2000
|
BLD-Framing/Rough-in | 4/4/2000 | 4/5/2000 | 4/5/2000 | A | PASS |
Russ Owen
|
|
|
NAILING INSP----RON ###-####
|
BLD-Framing/Rough-in | 4/3/2000 | 4/4/2000 | 4/4/2000 | A | FAIL |
Tom Arcoraci
|
|
|
###-#### See C/N 4/4/00 1:02:47 PM
|
BLD-Framing/Rough-in | 3/31/2000 | 4/3/2000 | 4/3/2000 | P | NR |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 3/31/2000 | 3/31/2000 | 3/31/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### See C/N 4/3/00 8:49:10 AM
|
BLD-Foundation | 2/25/2000 | 2/25/2000 | 2/25/2000 | A | PART |
Russ Owen
|
|
|
Recieved letter of complete foundation inspection from MTI, for rebar, footings and stems dated 1/17/00 and 1/21/00. As elected by contractor due to public holiday.
|
BLD-Footing | 1/14/2000 | 1/14/2000 | 1/14/2000 | P | NR |
Russ Owen
|
|
|
after 3:30 Dan ###-#### No steel in place, need to recall (Hillside). 1/18/00 8:51:53 AM
|