BLD-Final | 8/31/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
|
|
|
skip ###-#### fn signed by 409 ok by me 9/1/2000 4:09:29 PM
|
FIRE-Final Inspection | 8/31/2000 | 9/1/2000 | 9/1/2000 | P | PASS |
Rick Jackson
|
|
|
skip ###-#### fire fn signed for structural inspector also per Perry 9/1/2000 2:05:01 PM
|
Permanent Occupancy | | 9/1/2000 | 9/1/2000 | | DONE |
|
|
|
|
FIRE-Final Inspection | 8/29/2000 | 8/30/2000 | 8/30/2000 | P | NR |
Rick Jackson
|
|
|
Scheduled by Inspector: 409 On 8/29/2000 will reschedule 8/31/2000 7:59:11 AM
|
BLD-Final | 8/28/2000 | 8/29/2000 | 8/29/2000 | P | PASS |
|
|
|
Skip Jones ###-#### signed for me by 409 9/1/2000 4:08:53 PM
|
FIRE-Final Inspection | 8/28/2000 | 8/29/2000 | 8/29/2000 | P | NR |
Rick Jackson
|
|
|
Skip Jones ###-#### rescheduled for 8/30 8/29/2000 12:10:42 PM
|
BLD-Final | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | CANC |
|
|
|
###-#### nr 8/4/2000 4:04:55 PM
|
FIRE-Final Inspection | 8/3/2000 | 8/4/2000 | 8/4/2000 | A | NR |
Rick Jackson
|
|
|
###-#### talked to Skip via telephone and he said he wouldn't be ready to test the alarms until next week. 8/4/2000 10:47:26 AM
|
BLD-Conference | 7/19/2000 | 7/20/2000 | 7/20/2000 | A | PART |
|
|
|
Skip ###-#### walked through for pre signoff 7/21/2000 9:07:03 AM
|
BLD-Conference | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | FAIL |
|
|
|
skip ###-#### no response from contr. 7/14/2000 4:41:56 PM
|
BLD-Framing/Rough-in | 4/17/2000 | 4/17/2000 | 4/17/2000 | P | PART |
|
|
|
###-#### ok to cover hall ceiling 04/17/2000
|
BLD-Conference | 3/27/2000 | 3/28/2000 | 3/30/2000 | A | PART |
|
|
|
Skip ###-#### on the basement corridor level landing not required on inside of storage units 03/30/2000
|
FIRE-Conference | 3/27/2000 | 3/28/2000 | 3/28/2000 | A | PART |
Rick Jackson
|
|
|
Skip ###-#### Reviewed project with contractor (skip). 3/30/00 10:47:12 AM
|