Permit NumberBLD99-03303
StatusFinaled
Name FIDELITY BUILDING (SHELL)
Site Address 242 N 8TH ST
Project NameFIDELITY BLDG
Customer Number 
ePlanReviewNo
Description
(FIDELITY BUILDING) This building is fully fire-sprinklered to substitute for 1-hr fire-resistive construction. To renovate the main lobby and reconfigure the 2nd floor lobby and office spaces within an existing building. Work is to include selective demolition, a reconfigured stairway, interior nonbearing walls, interior doors, interior windows, and suspended ceilings all per approved drawings and plan review conditions on file. Installation of a cooler for "Pollo Rey" will require a separate building permit. Fire sprinkler heads shall be relocated, if necessary, to comply with NFPA 13-1996 as regulated by the Fire Department. This permit shall not establish a Certificate of Occupancy for any tenant. PC-876-99 **CJW**
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/20/20016/20/20016/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/20/2001 5:43:28 PM need accurate plan for modifications/deletions; tenants may req. c/o's; arch states that t/i follow up will address these issues, regarding deletion of "fancy" lobby & simpler replacement.
BLD-Conference5/7/20015/8/20015/8/2001APASS
DetailsCarl Dependahl
###-####; met w/ arch,submit for changes/deletions; appears to be finalled, but reception area was left open. 5/8/2001 11:37:13 AM 5/8/2001 11:40:20 AM
BLD-Conference5/7/20015/7/20015/7/2001PCANC
DetailsCarl Dependahl
doug ###-####
BLD-Conference5/2/20015/2/20015/2/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/2/2001 10:28:28 AM need submittals for modification / completion deleting some features of job for review.
BLD-Final6/14/20006/15/20006/15/2000APASS
Details
ryan ###-#### please call first signed the perm col ok 6/15/00 3:53:07 PM
FIRE-Final Inspection6/13/20006/13/20006/13/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/13/2000 at 11:27:30. Contact: ###-####.
FIRE-Final Inspection6/12/20006/12/20006/12/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 06/12/2000 at 10:00:48. Contact: ###-####. Repair exit signs 6/13/00 2:38:05 PM
BLD-Conference3/6/20003/7/20003/7/2000APASS
Details
Scheduled by a contractor via Hello! on 03/06/2000 at 15:05:10. Contact: ###-####. with jack on the new shower, ok to have slope up to shower area in the 5' radius 3/8/00 8:52:33 AM
BLD-Framing/Rough-in2/21/20002/22/20002/22/2000APART
Details
Scheduled by a contractor via Hello! on 02/21/2000 at 08:56:19. Contact: ###-####. made ok to start covering the stair walls 2/22/00 5:28:39 PM
BLD-Framing/Rough-in2/14/20002/15/20002/15/2000PPASS
DetailsJim Storey
Scheduled by a contractor via Hello! on 02/14/2000 at 15:40:08. Contact: ###-####. Frame ok 2nd floor ramp/ 2 office space at hall ceiling at entry. 2/18/00 9:35:22 AM
FIRE-Conference2/10/20002/11/20002/11/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 02/10/2000 at 07:36:16. Contact: ###-####. Requested info on alarms; placement of exit signs. 2/14/00 12:04:48 PM
BLD-Conference1/27/20001/28/20001/28/2000APASS
Details
Scheduled by a contractor via Hello! on 01/27/2000 at 15:47:42. Contact: ###-####. with jack on the scheduling of the work not ot affect the exiting from the 2nd floor 2/1/00 8:54:22 AM