Permit NumberBLD99-03310
StatusFinaled
Name SUNDANCE CONSTRUCTION
Site Address 2450 N BOGUS BASIN RD
Project NameALBERTSONS
Customer Number 
ePlanReviewNo
Description
To remodel an existing 41,365 sq.ft. grocery store for new owner/tenant to reduce the building area to 26,259 sq.ft. per approved plans and engineering on file. Work inlcudes site improvements per DRH99-00226 and CUP99-00128. Building remodel includes, total renovation of the whole building, structural demolition to roof and walls, new exterior bearing cmu wall, new roof, new canopys on the exterior over drive through and entrance area , new interior nonbearing partitions, installation of new walk-in coolers and freezers, installation of a new type I hood and one hour rated shaft for grease duct, new power sliding doors and two swinging exit doors, installation of new suspended ceiling system, construction of accessible restrooms. Miscelaneous related finishes, Electrical, Mechanical and plumbing work. NOTE: This building is fully fire sprinklered for area increase. All fire sprinkler modifications and alterations must comply with NFPA #13 as regulated by the fire department. (P.C.#878-99)*RMH*
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Permanent Occupancy 8/18/20008/18/2000 DONE
Details
BLD-Final5/31/20006/1/20006/1/2000APART
Details
Scheduled by a contractor via Hello! on 05/31/2000 at 14:45:04. Contact: ###-####. signed the temp col 6/1/00 11:37:33 AM
FIRE-Final Inspection5/30/20005/31/20005/31/2000PPASS
DetailsRick Jackson
Scheduled by a contractor via Hello! on 05/30/2000 at 14:57:13. Contact: ###-####.
FIRE-Final Inspection5/19/20005/22/20005/22/2000AFAIL
DetailsRick Jackson
###-#### C/N issued 5/23/00 2:19:13 PM
BLD-Other5/9/20005/10/20005/10/2000APASS
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 05/09/2000 at 15:38:01. Contact: ###-####. Conf. on final. 5/11/00 11:54:25 AM
BLD-Conference4/17/20004/17/20004/17/2000PCANC
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/17/2000 at 09:33:28. Contact: ###-####. Mechanical inspector will be out of this. 4/18/00 10:50:46 AM
BLD-Other4/13/20004/14/20004/14/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 04/13/2000 at 10:03:58. Contact: ###-####. Grid ok west side 4/14/00 1:51:27 PM
FIRE-Sprinkler Rough-in4/13/20004/14/20004/14/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 04/13/2000 at 10:04:44. Contact: ###-####. Heads/drops missing by pharmacy; ok to cover sales area 4/17/00 1:51:41 PM
FIRE-Sprinkler Rough-in4/3/20004/4/20004/4/2000APART
DetailsRick Jackson
okay to cover main sales areaeast side
BLD-Other3/28/20003/29/20003/29/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/28/2000 at 08:19:43. Contact: ###-####. Went out could not find general contractor on site. 3/29/00 2:12:55 PM
FIRE-Conference3/22/20003/23/20003/23/2000APART
DetailsRick Jackson
Scheduled by a contractor via Hello! on 03/22/2000 at 11:59:40. Contact: ###-####. When to have sprinkler R/I 3/27/00 9:56:57 AM
BLD-Framing/Rough-in3/7/20003/7/20003/7/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 03/07/2000 at 08:52:33. Contact: ###-####. Right front areas ok to sheetrock. 3/8/00 10:36:51 AM
BLD-Framing/Rough-in2/23/20002/24/20002/24/2000PPART
DetailsRuss Owen
rear office space left side ok to cover. 2/28/00 9:01:58 AM
BLD-Framing/Rough-in2/3/20002/4/20002/4/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/03/2000 at 07:59:49. Contact: ###-####. Partial roof nailing inspection. 2/4/00 2:02:38 PM
BLD-Foundation2/3/20002/3/20002/3/2000PPART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 02/03/2000 at 07:58:15. Contact: ###-####. Special insp. req. 2/4/00 2:06:52 PM
BLD-Foundation1/26/20001/26/20001/26/2000PPASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 01/26/2000 at 08:24:41. Contact: ###-####. Pier's ok- special inspector on site. 2/7/00 8:35:14 AM
BLD-Foundation1/21/20001/24/20001/24/2000APART
DetailsWes Worcester
Scheduled by a contractor via Hello! on 01/21/2000 at 07:05:21. Contact: ###-####. Special inspectin on site. 1/25/00 1:31:01 PM
BLD-Footing1/21/20001/21/20001/21/2000APASS
DetailsWes Worcester
Scheduled by a contractor via Hello! on 01/21/2000 at 07:04:38. Contact: ###-####. Special inspector on site- placing dobbies for 3" clearance to earth. 1/25/00 12:10:53 PM
BLD-Footing1/19/20001/20/20001/20/2000APART
DetailsTom Arcoraci
Scheduled by a contractor via Hello! on 01/19/2000 at 15:18:37. Contact: ###-####. Foot ok spec. required. 1/20/00 4:17:13 PM