Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberBLD99-03383
StatusFinaled
Name ADA COUNTY
Site Address 200 W FRONT ST
Project NameCOURTHOUSE-SHELL/CORE
Customer Number 
ePlanReviewNo
Description
ADA COUNTY COURTHOUSE COMPLEX (PHASE I) - TO CONSTRUCT A NEW 322,825 SQ. FT. FIVE STORY WITH 39,870 SQ. FT. BASEMENT, GOVERNMENT ADMINISTRATION OFFICES AND COURTHOUSE SHELL AND CORE BUILDING AND RELATED SITE IMPROVEMENTS. THIS BUILDING IS CONSTRUCTED OF STRUCTURAL STEEL FRAME WITH EXTERIOR MASONRY AND METAL STUD EXTERIOR WALL. THIS BUILDING IS FULLY FIRE SPRINKLED. ALL CONSTRUCTION PER THE APPROVED PLANS AND ATTACHED REQUIREMENT LIST. THIS IS A SHELL AND CORE PERMIT ONLY. THERE IS NO OCCUPANCY ALLOWED UNDER THIS PERMIT. A SEPARATE TENANT IMPROVEMENT PERMIT IS REQUIRED TO FINISH EACH TENANT SPACE. DRH99-00060/PC#896-99/JCM
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference3/21/20023/21/20023/21/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/21/2002 9:49:49 AM rec'd Final Mti report verifying proper adhesion of fireproofing, c/n ok. 3/21/2002 10:14:03 AM
BLD-Final3/21/20023/21/20023/21/2002APASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/21/2002 10:06:49 AM c/n ok...ok for perm l/c only. 3/21/2002 11:18:23 AM
BLD-Final3/21/20023/21/20023/21/2002PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 3/21/2002 10:15:08 AM ok for l/c 3/21/2002 2:09:07 PM
FIRE-Final Inspection3/21/20023/21/20023/21/2002PPASS
DetailsRick Jackson
Added by Inspector: 409 On 3/21/2002 3:03:08 PM
BLD-Final3/8/20023/11/20023/11/2002AFAIL
DetailsCarl Dependahl
mel ###-#### fn occ ; verify fireproofing approval re MTI affidavit, reports 375 &386. rec'd statement of repair from ISI (Kip Frawley, spray-on mgr.) but no approval or acknowledgement from arch.3/11/2002 4:03:12 PM 3/11/2002 4:06:22 PM
BLD-Final1/2/20021/2/20021/2/2002PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 1/2/2002 3:20:31 PM c/n, need eng'rs complete response to spec insp items, permanent oks from all agencys, previous corrections completed, etc . ok for t/o only per P&Z (Tempra)
BLD-Final12/28/200112/31/200112/31/2001ANR
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 12/28/2001 at 17:41:37. Contact: ###-####...keep c/n. 12/31/2001 5:49:23 PM
FIRE-Final Inspection12/27/200112/28/200112/28/2001PFAIL
DetailsRick Jackson
###-#### door hardware; closures; with Carl D and Lee 12/28/2001 4:52:50 PM
BLD-Conference12/12/200112/12/200112/12/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 12/12/2001 6:04:02 PM need eng's, arch's, & spec insp reports
BLD-Conference11/29/200111/29/200111/29/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/29/2001 2:27:21 PM ok to delete 1hr const at north wall except at & above sally port closer than 39' to P.L. per waiver request approved by T. Hogland.
BLD-Energy code compliance11/26/200111/27/200111/27/2001ANR
DetailsCarl Dependahl
LORA ###-####; need arch's approval /letter to delete 1hr const at north wall. will submit 11/27/2001 1:48:52 PM
BLD-Framing/Rough-in11/27/200111/27/200111/27/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 11/27/2001 1:47:41 PM bsmt: c/n re corridor penetrations, lg. panel box at elec. rm... grid wires, pods;labels at rated doors & glass. repair spray-on F.P. at beams, pan over garage, etc. Verify fire-smoke dampers at hvac at elev lobbies/corridor. ok to tile 2hr exit pass. at 1st fl, grid ok.
BLD-Conference11/26/200111/26/200111/26/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/26/2001 11:23:41 AM w/ George Eidam, Eidam eng's...need standby power for one elevator to 5th floor per UBC 1104; 4th floor ok per exception.
BLD-Conference11/16/200111/16/200111/16/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2001 11:08:44 AM w/ 409 re ADA req't for standby power to 1 elevator, per UBC1104.1.3...will advise bldr.
BLD-Conference11/8/200111/8/200111/8/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/8/2001 10:11:26 AM rec'd, reviewed insp reports...soils at west side entry retest ok per mti
BLD-Conference9/20/20019/20/20019/20/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 9/20/2001 6:01:57 PM need repair fireproofing at" new" add'l beams...verbal c/n.
BLD-Framing/Rough-in9/5/20019/5/20019/5/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 9/5/2001 3:42:07 PM need recheck spray on fire proofing removed at col's /spandrels & secondary floor supports attached after-the-fact...MTI report req'd.
BLD-Conference8/21/20018/21/20018/21/2001PPASS
DetailsCarl Dependahl
Scheduled by Inspector: 340 On 8/21/2001 9:48:11 AM mel ###-#### shell...need all reports 8/21/2001 4:38:23 PM
BLD-Conference6/14/20016/14/20016/14/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/14/2001 3:21:02 PM data boxes at floor, wip ok
BLD-Framing/Rough-in6/7/20016/7/20016/7/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 6/7/2001 4:39:19 PM ext gfrc panels
BLD-Framing/Rough-in5/31/20015/31/20015/31/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/31/2001 3:33:20 PM with Mel P... keep c/n, install shaft for hvac at NE corner area, fl 3-5...
BLD-Framing/Rough-in5/16/20015/16/20015/16/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 5/16/2001 5:12:55 PM keep c/n re shafts, 4hr & 2hr occ separations.
BLD-Framing/Rough-in5/11/20015/11/20015/11/2001PFAIL
DetailsCarl Dependahl
Added by Inspector: 340 On 5/11/2001 4:17:01 PM need shafts at hvac exhaust thru floors 3,4; clarify masonry const for 4hr wall at bsmt...cl. B-4 blocks req'd?
BLD-Framing/Rough-in5/3/20015/3/20015/3/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 5/3/2001 4:52:54 PM curtain wall firestops at fls.2,3,4,5 appear ok...mti also inspecting
BLD-Framing/Rough-in4/30/20014/30/20014/30/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/30/2001 5:00:36 PM firestops at 3rd fl curtain wall/floor...ok; has mti insp. too.
BLD-Framing/Rough-in4/13/20014/13/20014/13/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/13/2001 2:01:03 PM 2nd fl curtain wall firestops...wip
BLD-Framing/Rough-in4/12/20014/12/20014/12/2001APART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/12/2001 10:50:31 AM continuing insp...firestops 2nd fl east side...rework gaps, holes. wip
BLD-Framing/Rough-in4/11/20014/11/20014/11/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 4/11/2001 5:44:30 PM 2nd fl curtain wall firestops at north & east sides ok per detail; wip for shafts, & corridor walls
BLD-Conference4/9/20014/9/20014/9/2001APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 4/9/2001 10:02:48 AM w/ Mel Perez, supt. re floor/curtainwall firestop assy 4/9/2001 10:03:20 AM
BLD-Conference2/27/20012/27/20012/27/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/27/2001 5:58:11 PM faxed floor detail for penetrations
BLD-Conference2/21/20012/21/20012/21/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/21/2001 4:07:37 PM w/ Laura Patten re 2hr fl assy...eng'd judgement to be provided for protection of boxes
BLD-Conference2/8/20012/8/20012/8/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/8/2001 4:25:07 PM gave list of questions for clarification to proj. eng'r re floor penetrations
BLD-Conference2/5/20012/5/20012/5/2001PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 2/5/2001 12:04:55 PM w/ proj engr; resub. re boxes
BLD-Conference2/1/20012/1/20012/1/2001PPASS
DetailsCarl Dependahl
Laura Patton ###-####; rec'd resub for floor boxes, will advise..discussed handrails w/ supt. 2/2/2001 12:01:02 PM
BLD-Conference2/1/20012/1/20012/1/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 2/1/2001 4:53:27 PM w/Laura re fl boxes
BLD-Conference1/11/20011/11/20011/11/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/11/2001 5:13:50 PM walk thru
BLD-Conference1/9/20011/9/20011/9/2001PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 1/9/2001 6:10:07 PM w/ super, proj engr at sitr. need submittal for floor boxes