BLD-Final | 10/27/2000 | 10/27/2000 | 10/27/2000 | | PASS |
|
|
|
L/C #19975
|
BLD-Grading Inspection | 10/27/2000 | 10/27/2000 | 10/27/2000 | | BOND |
Rita DeYoung
|
|
|
Grading completed according to plan. Compaction test results for fill beneath garage floor and driveway must still be submitted. Contractor provided estimate of $4000.00 for replacement of driveway.
|
BLD-Final | 10/25/2000 | 10/26/2000 | 10/26/2000 | A | FAIL |
Tony Young
|
|
|
Scheduled by Inspector: 415 On 10/25/2000 by 9 am,mike ###-####
still need T. Records sign off 10/26/2000 12:42:42 PM
|
BLD-Final | 10/25/2000 | 10/25/2000 | 10/25/2000 | P | FAIL |
Tony Young
|
|
|
FN OCC-- MIKE ###-#### -CALL 1ST BEFORE INSP
need T.R signoff 10/25/2000 4:50:00 PM
|
BLD-Final | 10/24/2000 | 10/24/2000 | 10/24/2000 | P | FAIL |
Tony Young
|
|
|
MIKE- ###-#### FN OCC--
need plumbing, handrails x2, firewall, and T.Records sign off. 10/24/2000 3:46:48 PM
|
BLD-Energy code compliance | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PASS |
Tony Young
|
|
|
Pass
|
BLD-Framing/Rough-in | 7/20/2000 | 7/20/2000 | 7/20/2000 | P | PASS |
Tony Young
|
|
|
call 1st before insp mike-- ###-#### re-insp fr Ok to cover- shear ok- energy code ok 7/21/00 9:11:45 AM
|
BLD-Framing/Rough-in | 7/18/2000 | 7/19/2000 | 7/19/2000 | A | FAIL |
Tony Young
|
|
|
call 25 min. prior ###-#### to meet there Need mec. check- & finish shear nailing- waiting for letter from engineer. 7/19/00 3:27:12 PM
|
BLD-Framing/Rough-in | 7/12/2000 | 7/13/2000 | 7/13/2000 | A | FAIL |
Tony Young
|
|
|
MIKE ###-#### FR-CALL 1/2 HR BEFORE INSP PLEASE C/N left need to finish 1st C/N- need eng. on shear wall to plans. (eng. brace panels). 7/14/00 8:58:46 AM
|
BLD-Framing/Rough-in | 7/12/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Tony Young
|
|
|
###-#### C/N previous not done. 7/13/00 11:29:36 AM
|
BLD-Energy code compliance | 7/11/2000 | 7/11/2000 | 7/11/2000 | A | FAIL |
|
|
|
Scheduled by Inspector: 338 On 7/11/00 to meet with 415 and Mike..###-#### combustables in concealedspaces; stair bottom tread heght to be confirmed; seal floor to wall at the attic truss floor to the attic wall; remove vapor barrier from behind the green board on ext walls 7/11/00 11:15:43 AM
|
BLD-Framing/Rough-in | 7/10/2000 | 7/10/2000 | 7/10/2000 | P | FAIL |
|
|
|
Mike ###-#### need to meet 415 on site 7/10/00 5:56:11 PM
|
BLD-Framing/Rough-in | 7/6/2000 | 7/7/2000 | 7/7/2000 | A | NR |
Russ Owen
|
|
|
###-####
|
BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 | P | FAIL |
Tony Young
|
|
|
###-#### plans in truss engineering by fireplace c/n left 9 items 7/5/00 8:38:16 AM
|
BLD-Foundation | 5/9/2000 | 5/9/2000 | 5/9/2000 | P | PART |
|
|
|
Scheduled by a contractor via Hello! on 05/09/2000 at 08:37:15. Contact: ###-####. rear portion of te 5/9/00 7:55:41 PM Scheduled by a contractor via Hello! on 05/09/2000 at 08:37:15. Contact: ###-####. rear portion of the foundation and infill footings ok to pour 5/9/00 7:55:41 PM 5/9/00 7:56:26 PM
|
BLD-Footing | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | PASS |
Russ Owen
|
|
|
mike --###-#### ft---re-insp
|
BLD-Footing | 5/2/2000 | 5/3/2000 | 5/3/2000 | A | FAIL |
Russ Owen
|
|
|
###-#### C/N posted 5/4/00 11:31:11 AM
|