Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberBLD99-03555
StatusFinaled
Name LIKE-NU CAR WASH
Site Address 3003 W STATE ST
Project NameLIKE NU-ADDITION
Customer Number 
ePlanReviewNo
Description
LIKE - NU CAR WASH * REMODEL OF EXSISTING CAR WASH AND ADD APPROXIMATELY 3,509 SQ.FT. OF NEW AREA FOR CONSTRUCTION OF NEW WASH TUNNEL. PERMIT TO INCLUDE DEMOLITION OF 2 EXISTING CAR WASH BAYS AND CONSTRUCT OF A NEW 3,850 SQ.FT. FREE STANDING LIGHTED VACUUM ISLAND, GRADING AND DRAINAGE AS APPROVED BY PUBLIC WORKS . ALL CONSTRUCTION PER THE APPROVED PLANS, ATTACHED COMMENT LIST, CABO/ANSI A117.1 AND THE 1997 EDITION OF THE UBC. DRH99-00091 C#940-99 MJP *** PLANS MODIFIED AND APPROVED 3/16/00. REMOVED AN ADDITIONAL CAR WASH BAY AND MECHANICAL ROOM TO ADD ADDITIONAL AREA FOR DRYING. RELOCATED MECHANICAL ROOM AS PER APPROVED PLANS DATED 3/16/00.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final7/19/20007/20/20007/20/2000APASS
Details
harvey ###-#### fn occ signed the perm col 7/20/2000 2:30:10 PM
Permanent Occupancy 7/20/20007/20/2000 DONE
Details
BLD-Final7/13/20007/14/20007/14/2000PPART
Details
Scheduled by a contractor via Hello! on 07/13/2000 at 16:07:20. Contact: ###-####. temp occ ok for the wash tunnel and the vac bays only until compressor is taged by u.l. letter on file from owner that power will be terminated in 2-weeks if lable is not on compressor 7/14/2000 4:37:51 PM
FIRE-Final Inspection6/29/20006/30/20006/30/2000APASS
DetailsRick Jackson
steve ###-####
BLD-Framing/Rough-in5/24/20005/24/20005/24/2000PPART
Details
###-#### information on the truss brace changes ok 5/26/00 6:57:54 AM
BLD-Framing/Rough-in5/19/20005/22/20005/22/2000APART
Details
rod ###-#### fr need desgn chang 5/24/00 2:55:57 PM rod ###-#### fr need design changes from arch submitted sealed by arch and engneed desgn chang 5/24/00 2:55:57 PM 5/24/00 2:56:31 PM
FIRE-Supply Line Hydro4/12/20004/13/20004/13/2000AFAIL
DetailsRick Jackson
building not sprinklered - contractor to request plumbing inspection
BLD-Foundation4/4/20004/5/20004/5/2000PPASS
DetailsJim Storey
###-####
BLD-Foundation3/24/20003/27/20003/27/2000APASS
DetailsRuss Owen
###-#### Reinsp. at PM walls at mechanical room 3/28/00 9:14:57 AM
BLD-Footing3/22/20003/23/20003/23/2000APASS
Details
rod ###-#### r-bar placed in the footings 03/23/2000 12:57:14 PM
BLD-Footing3/21/20003/22/20003/22/2000ANR
DetailsRuss Owen
###-#### Need compaction report, need vent's tied up and need approved plans, notified person on site. 3/22/00 1:45:36 PM
BLD-Footing3/20/20003/21/20003/21/2000PCANC
DetailsRuss Owen
###-####
BLD-Foundation3/15/20003/16/20003/16/2000APASS
DetailsRuss Owen
rod ###-#### Walls (West) side 3/16/00 2:27:48 PM
BLD-Foundation3/13/20003/14/20003/14/2000APART
DetailsTom Arcoraci
Rod ###-#### Soils report ok for West footing. 3/14/00 2:01:40 PM
BLD-Foundation3/9/20003/13/20003/13/2000AFAIL
DetailsWes Worcester
Rejected MTI report, need scope of work letter & log in sheet, compaction report required- DO NOT POUR 3/24/00 1:57:13 PM
BLD-Concrete3/7/20003/7/20003/7/2000PPART
DetailsRuss Owen
early pm Rod ###-#### Walls. 3/8/00 10:36:55 AM
BLD-Foundation3/2/20003/3/20003/3/2000AFAIL
DetailsRuss Owen
###-#### rod\\Rebar Need ok for the center pit, not constructed per plan, as shown as Mono Pour. 3/6/00 1:44:58 PM
BLD-Concrete2/24/20002/25/20002/25/2000APART
DetailsRuss Owen
###-#### early am Footings, partial on west side. 2/25/00 3:05:24 PM
BLD-Footing2/16/20002/17/20002/17/2000APART
DetailsRuss Owen
###-#### Footings at carbays and fence on property line, soils ok by engineers compaction report. 2/18/00 3:24:54 PM
BLD-Footing2/15/20002/16/20002/16/2000ACANC
DetailsRuss Owen
rod ###-#### Will recall when ready. 2/16/00 2:34:17 PM
BLD-Conference2/8/20002/8/20002/8/2000PPART
DetailsRuss Owen
Rod ###-#### just need to submit for a permit addemdum to demolish existing mech room.