Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-03557
StatusFinaled
Name MTN COVE HIGH SCHOOL
Site Address 911 N MOUNTAIN COVE RD
Project NameMTN COVE HIGH SCHOOL
Customer Number 
ePlanReviewNo
Description
MOUNTAIN COVE SCHOOL * TO ADD A 6,950 SQ. FT. ONE STORY TYPE II-1HR FULLY FIRE SPRINKLERED GYMNASIUM WITH LOCKER ROOMS WITH AREA SEPARATION WALL AND 125 SQ. FT. CAREER CENTER UNDER THE EXISTING OVERHANG OF THE EXISTING TYPE VN BUILDING. OTHER WORK TO INCLUDE INTERIOR PARTITIONS TO CREATE A 1036 SQ. FT. LIBRARY AND ADJOINING HALLWAY AND ALL RELATED SITE WORK PER APPROVED PLANS AND ATTACHMENTS. CUP99-00105 PC#941-99 KMM FIRE SPRINKLERS ON THE NEW GYM USED FOR SUBSTITUTION OF 1HR AND AREA ON THE EXISTING BUILDING.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final12/21/200012/21/200012/21/2000APASS
DetailsTony Young
Rec'd special inspection letter and ok for perm. occ. cert.
Permanent Occupancy 12/21/200012/21/2000 DONE
Details
BLD-Final12/7/200012/8/200012/8/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 12/07/2000 at 14:48:49. Contact: ###-####.
temp. c of o signed, pending final letter of compliance from special inspection co.,, letter from arch. on fire damper in mech. room,, and threshholds on area seperation wall doors. 12/8/2000 12:56:14 PM
FIRE-Final Inspection12/5/200012/7/200012/7/2000PPASS
DetailsRick Jackson
###-####
FIRE-Final Inspection12/4/200012/5/200012/5/2000PFAIL
DetailsRick Jackson
Scheduled by a contractor via Hello! on 12/04/2000 at 09:19:28. Contact: ###-####.////// c/n issued - alarm and sprinkler issues; fire lane painting; exit sign 12/5/2000 3:54:29 PM
BLD-Framing/Rough-in10/20/200010/23/200010/23/2000APART
DetailsTony Young
###-####
ceiling grid in gym locker rooms 10/23/2000 9:02:55 AM
BLD-Framing/Rough-in9/18/20009/19/20009/19/2000APART
DetailsTony Young
Kelly ###-####
ROUGH FRAME OK IN LIBERARY CAREER CENTER S.E. CORNER... W/ # 338 9/19/2000 11:10:25 AM
BLD-Framing/Rough-in8/17/20008/18/20008/18/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/17/2000 at 15:38:55. Contact: ###-####.
firewall where 2 rooflines meet on south-east side, perpandicular of gym wall 8/18/2000 3:14:09 PM
BLD-Framing/Rough-in8/16/20008/17/20008/17/2000PFAIL
DetailsTom Arcoraci
KELLY ###-#### FR needs detail for occ sep wall jamb has been fire chalked 8/17/2000 4:54:58 PM
BLD-Conference8/14/20008/14/20008/14/2000PPART
Details
Added by Inspector: 338 On 8/14/2000 with 415 and the super on a revision of the construction of the 1-hour occ sep wall

BLD-Framing/Rough-in8/14/20008/14/20008/14/2000PPART
DetailsTony Young
Scheduled by a contractor via Hello! on 08/14/2000 at 07:45:51. Contact: ###-####. conference on 1 hr. wall 8/14/2000 2:06:51 PM
BLD-Framing/Rough-in7/6/20007/7/20007/7/2000APART
DetailsTony Young
Scheduled by a contractor via Hello! on 07/06/2000 at 07:04:56. Contact: ###-####. Need approved plans- roof framing from gym to existing roof. 7/10/00 9:49:30 AM
BLD-Framing/Rough-in6/29/20007/3/20007/3/2000ACANC
DetailsJim Storey
Scheduled by a contractor via Hello! on 06/29/2000 at 14:03:08. Contact: ###-####. forgot to call and cancle insp. n/r 7/3/00 10:22:45 AM
BLD-Foundation5/30/20006/1/20006/1/2000APART
Details
Scheduled by a contractor via Hello! on 05/30/2000 at 14:00:39. Contact: ###-####. with sp insp aprovals 6/5/00 6:55:07 AM
BLD-Footing5/4/20005/5/20005/5/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 05/04/2000 at 10:18:39. Contact: ###-####. Subject to special inspection, footing at area east wall, was access. 5/8/00 9:17:16 AM
BLD-Footing4/28/20005/2/20005/2/2000APART
DetailsRuss Owen
Scheduled by a contractor via Hello! on 04/28/2000 at 12:32:02. Contact: ###-####. Need engineers clarification for verticals, called him and he is calling job foreman. 5/3/00 3:27:53 PM
BLD-Foundation4/25/20004/27/20004/27/2000APART
DetailsJim Storey
Scheduled by a contractor via Hello! on 04/25/2000 at 12:36:19. Contact: ###-####. 4 hr wall line west and north rebar ok pending special insp. report. 4/27/00 11:42:25 AM
BLD-Footing4/21/20004/24/20004/24/2000APASS
Details
Scheduled by a contractor via Hello! on 04/21/2000 at 16:10:32. Contact: ###-####. made ok 4/27/00 11:03:54 AM