Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberBLD99-03630
StatusFinaled
Name ADAMS JEROME A LIVING TRUST
Site Address 255 N STEELHEAD WAY
Project NameSCP - TENANT IMPROVEMNT
Customer Number 
ePlanReviewNo
Description
To remodel an 18,357 sq. ft. area within an existing 45,000 sq.ft. Warehouse for use as an "H6 / H7" semiconductor facility with office and storage support areas per approved plans on file. Work to include construction of interior, non-bearing, noncombustible framing, fire code sheetrock cover, to create 1 & 2-hour occupancy separations around the "H6/H7" Fab Area from adjoining use areas and to create a 1-hour exit corridor system to serve as required exits from the areas. To install all electrical, mechanical, plumbing, fire supression & alarm support systems as required by the occupancy uses. To specifically comply with Article 51, 1997 UFC & Section 307.11, 1997 UBC, for the Clean Room & it's support areas.To provide compliant accessibility to all areas of this project per code and accessible restrooms in adjoining office building. NOTE: This building is fully fire sprinklered for allowable area increase. A "CERTIFICATE OF OCCUPANCY" IS REQUIRED AS A CONDITION OF THIS PERMIT. (P.C.#966-99)/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Conference6/30/20037/1/20037/1/2003APASS
DetailsCarl Dependahl
ok ...w/ Troy...was finalled 7/1/2003 9:39:56 AM
Permanent Occupancy 12/1/200012/1/2000 DONE
Details
BLD-Final11/29/200011/30/200011/30/2000APASS
DetailsRuss Owen
Jerry ###-####
BLD-Final11/15/200011/16/200011/16/2000PCANC
DetailsSteven Webb
###-####: To Carl 11/16/2000 1:41:01 PM
BLD-Final11/16/200011/16/200011/16/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2000 5:48:46 PM ok for t/o, complete fire insp, etc.
FIRE-Final Inspection11/15/200011/16/200011/16/2000APASS
DetailsJoe Tawney
###-#### Final OK for permanant occupancy 11/16/2000 12:56:36 PM
BLD-Framing/Rough-in9/20/20009/21/20009/21/2000APART
DetailsTom Arcoraci
###-####\\ceiling
BLD-Conference8/21/20008/21/20008/21/2000PPASS
DetailsCarl Dependahl
Added by Inspector: 340 On 8/21/2000 w/ Dan S re resubmittal & phase 2 permit
BLD-Framing/Rough-in8/7/20008/10/20008/10/2000APART
DetailsTom Arcoraci
jerry ###-#### wip conf on exit stairs and office walls 8/11/2000 8:15:23 AM
BLD-Framing/Rough-in7/13/20007/14/20007/14/2000APART
DetailsCarl Dependahl
jerry ###-#### fr insp Upper layer @ tunnel corridio. South end of to continue, keep C/N's. 7/18/00 1:29:54 PM
BLD-Conference7/7/20007/7/20007/7/2000PPART
DetailsCarl Dependahl
With builder & framer: need complete copy of "MBMA" details....will consult with plan check.
BLD-Framing/Rough-in7/5/20007/6/20007/6/2000APART
DetailsCarl Dependahl
jerry ###-#### WIP rec'd add'l detail for rated walls. 7/7/00 1:35:29 PM
BLD-Framing/Rough-in6/27/20006/28/20006/28/2000AFAIL
DetailsCarl Dependahl
jerry ###-#### Cn/N: complete firestopping, need phase I eng'rs report, etc. 6/28/00 2:30:55 PM
BLD-Framing/Rough-in6/21/20006/22/20006/22/2000PPART
DetailsCarl Dependahl
JERRY-- ###-#### FR Reviewing resub. for rm. 111, walls at new corridor ok. 6/23/00 11:18:11 AM
BLD-Framing/Rough-in6/22/20006/22/20006/21/2000AFAIL
DetailsCarl Dependahl
C/N: firestops - cuts @ exist 2 hr masonry previous corrections, ok to continue wall framing. discussed exit landings w/ bldr.
BLD-Framing/Rough-in6/19/20006/19/20006/19/2000PNR
DetailsCarl Dependahl
Jerry ###-####
BLD-Framing/Rough-in6/13/20006/13/20006/13/2000PPART
DetailsJim Storey
Jerry ###-#### observed mock up of top of wall detail of assembly appears to be ok. 6/14/00 9:26:26 AM
BLD-Conference6/6/20006/7/20006/7/2000APASS
DetailsCarl Dependahl
###-#### met w/ Jerry Timmons, stan of russell corp... Alan & Joe T. rec'd detail for T.O.W. wall closure ok per 104.2, but suggested continue look for alternate - ok to continue 6/19/00 11:39:22 AM
FIRE-Conference6/6/20006/7/20006/7/2000APART
DetailsJoe Tawney
###-#### Conf. with contractor 6/7/00 4:40:11 PM
BLD-Conference6/6/20006/6/20006/6/2000PFAIL
DetailsCarl Dependahl
Awaiting arch's detail; keep C/N.
BLD-Framing/Rough-in6/1/20006/1/20006/1/2000AFAIL
DetailsCarl Dependahl
C/N re: to wall details, 1hr wall framing- recall for conf. asap.
BLD-Framing/Rough-in5/31/20005/31/20005/31/2000AFAIL
DetailsCarl Dependahl
W/architect & supt. & framer: C/N need details for top-of-wall w/references & HVAC modifications.
BLD-Framing/Rough-in5/25/20005/30/20005/30/2000AFAIL
DetailsJim Storey
###-#### resubmitals need to be sent to carl for approval of redesign and occ. wall configurations. 5/31/00 11:30:50 AM
BLD-Framing/Rough-in5/22/20005/22/20005/22/2000PPART
DetailsCarl Dependahl
###-#### ok to "1 side" walls- firestop boxes, etc. on fire walls. 5/23/00 2:34:52 PM
BLD-Framing/Rough-in5/18/20005/19/20005/19/2000ANR
DetailsTom Arcoraci
###-#### Called no ans. on phone. 5/22/00 10:53:35 AM
BLD-Framing/Rough-in4/25/20004/26/20004/26/2000APART
DetailsCarl Dependahl
###-#### Struct. steel; pending spec. insp. reports. 4/28/00 8:40:47 AM