BLD-Final | 5/10/2000 | 5/10/2000 | 5/11/2000 | P | PASS |
Tom Arcoraci
|
|
|
Final reinspect - approved for occ.
|
Permanent Occupancy | | 5/10/2000 | 5/10/2000 | | DONE |
|
|
|
|
BLD-Final | 4/25/2000 | 4/26/2000 | 4/26/2000 | A | PART |
Tom Arcoraci
|
|
|
Tim Wilson ###-#### Ok for temp. 4/28/00 8:52:16 AM
|
FIRE-Final Inspection | 4/26/2000 | 4/26/2000 | 4/26/2000 | P | PASS |
Joe Tawney
|
|
|
###-#### call 1/2 hr prior Reinsp. ok for perm. occ. 4/28/00 8:45:24 AM
|
FIRE-Final Inspection | 4/25/2000 | 4/25/2000 | 4/25/2000 | P | FAIL |
Joe Tawney
|
|
|
1/2 hr prior to meet Tim Wilson ###-#### Reinsp. fail curb painting & access sign. 4/26/00 11:47:26 AM
|
FIRE-Final Inspection | 4/21/2000 | 4/24/2000 | 4/24/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### call 1/2 prior to inspection Inspection cancelled to be reschedule. 4/24/00 1:07:58 PM
|
BLD-Final | 4/20/2000 | 4/21/2000 | 4/21/2000 | P | FAIL |
Tom Arcoraci
|
|
|
###-#### 1/2 hour notice No fire final 4/24/00 8:59:24 AM
|
FIRE-Final Inspection | 4/20/2000 | 4/21/2000 | 4/21/2000 | A | FAIL |
Joe Tawney
|
|
|
###-#### 1/2 hour notice Final fail C/N issued. 4/21/00 1:53:47 PM
|
BLD-Conference | 4/6/2000 | 4/7/2000 | 4/7/2000 | A | PART |
Joe Tawney
|
|
|
###-#### 1/2 hr. notice Conf with contractor on fire code issues 4/7/00 2:50:38 PM
|
BLD-Framing/Rough-in | 3/29/2000 | 3/30/2000 | 3/30/2000 | A | PART |
Carl Dependahl
|
|
|
above grid ###-#### Grid ok, check some perimeter wires @ final. 3/30/00 2:25:33 PM
|
BLD-Framing/Rough-in | 2/25/2000 | 2/28/2000 | 2/28/2000 | A | PASS |
Tom Arcoraci
|
|
|
###-####
|
BLD-Framing/Rough-in | 2/24/2000 | 2/25/2000 | 2/25/2000 | A | PASS |
Tom Arcoraci
|
|
|
tim ###-#### fr
|
BLD-Conference | 2/17/2000 | 2/17/2000 | 2/17/2000 | P | PART |
Jim Sly
|
|
|
###-#### tim wilson call 1/2 hr before C/N.. architect to provide listed tested ul assembly & detail for 1hr ceiling. 2/18/00 9:42:46 AM
|