Permit Information
Permit NumberBLD99-03639
StatusFinaled
Name SCP GLOBAL TECHNOLOGIES
Site Address 255 N STEELHEAD WAY
Project NameSCP - SUBSTRUCTURE
Customer Number 
ePlanReviewNo
Description
To construct new interior substructure for future tenant improvement for proposed R& D Cleanroom. Work to include new structural concrete pads for columns; new steel columns & beams; steel deck & designed connections. SPECIAL INSPECTION REQUIRED for Welding, Concrete, High Strength Bolting, Epoxy Anchors, Special Grading/ Excavation / & Filling, per structural engineers notes on Sheet S1.1.0 & Chapter 17 UBC. NOTE: This building is fully sprinkled. A "LETTER OF COMPLETION" REQUIRED AS CONDITION OF THIS PERMIT. PC#99-968/drs
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
BLD-Final11/29/200011/30/200011/30/2000APASS
DetailsRuss Owen
Jerry ###-####
BLD-Conference11/24/200011/24/200011/24/2000APASS
DetailsCarl Dependahl
Added by Inspector: 340 On 11/24/2000 9:42:56 AM w/ Ben Hill SCP arch...ER-HDR won't stamp letters...consult w/ 305???
BLD-Final11/14/200011/16/200011/16/2000PCANC
DetailsSteven Webb
JERRY ###-#### FN: Transfer to Carl 11/16/2000 1:40:41 PM
BLD-Final11/15/200011/16/200011/16/2000PCANC
DetailsSteven Webb
###-####: To Carl 11/16/2000 1:41:43 PM
BLD-Final11/16/200011/16/200011/16/2000PPART
DetailsCarl Dependahl
Added by Inspector: 340 On 11/16/2000 5:46:53 PM need stamped eng's letter, review discrepancies. ok for t/o
FIRE-Final Inspection11/15/200011/16/200011/16/2000APASS
DetailsJoe Tawney
###-#### Final OK for certificate of completion 11/16/2000 12:55:28 PM
FIRE-Final Inspection11/14/200011/16/200011/16/2000ACANC
DetailsJoe Tawney
JERRY ###-#### FIRE FN Cancel To be resched to 11/16/00 11/15/2000 12:18:07 PM
BLD-Framing/Rough-in10/25/200010/26/200010/26/2000AFAIL
DetailsCarl Dependahl
FR JERRY ###-#### c/n, stairs,, dampe 10/26/2000 6:05:43 PM s, etc 10/26/2000 6:05:57 PM
BLD-Footing4/18/20004/18/20004/18/2000PPART
DetailsCarl Dependahl
###-#### "Pad & ftg's". 4/19/00 9:18:30 AM
BLD-Footing4/13/20004/14/20004/14/2000AFAIL
DetailsCarl Dependahl
###-####-jerry ft
BLD-Footing4/12/20004/13/20004/13/2000APART
DetailsTom Arcoraci
###-#### Spec. insp. 4/13/00 1:04:32 PM
BLD-Conference2/14/20002/14/20002/14/2000PPASS
DetailsCarl Dependahl
REVIIEWED SPEC INSP AGREEMENT & REPORTS; PARTIAL PERMIT ONLY FOR PROJECT AT THIS TIME
BLD-Other2/3/20002/4/20002/4/2000APASS
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 02/03/2000 at 09:20:49. Contact: ###-####. Met w/ eng'r & spec insp onsite (MTI) Agreement letter forthcoming. WIP ok
BLD-Footing1/24/20001/25/20001/25/2000APART
Details
Scheduled by a contractor via Hello! on 01/24/2000 at 11:37:38. Contact: ###-####. per 340 made ok to pour pending sp insp documents 1/26/00 8:06:31 AM
BLD-Footing1/20/20001/24/20001/24/2000APART
DetailsCarl Dependahl
Scheduled by a contractor via Hello! on 01/20/2000 at 16:43:22. Contact: ###-####. c\n seal corrodor walls ok to infill need lites wired and grid 1/31/00 8:59:46 AM