BLD-Final | 5/8/2001 | 5/9/2001 | 5/9/2001 | A | PASS |
Tony Young
|
|
|
fn occ-- ###-#### terry
|
BLD-Final | 5/9/2001 | 5/9/2001 | 5/9/2001 | P | PASS |
Tony Young
|
|
|
###-####
ok for permanent occupancy 5/9/2001 1:51:51 PM
|
BLD-Final | 12/27/2000 | 12/28/2000 | 12/28/2000 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 12/27/2000 at 09:01:48. Contact: ###-####. or ###-####
conference only on accessible counter, door hardware etc. 12/28/2000 2:08:06 PM
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 16:40:34. Contact: ###-####. Will call in Wed No access.... 12/22/2000 2:06:56 PM
|
BLD-Final | 12/21/2000 | 12/22/2000 | 12/22/2000 | A | CANC |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 12/21/2000 at 16:40:34. Contact: ###-####.
|
FIRE-Final Inspection | 12/19/2000 | 12/21/2000 | 12/21/2000 | A | PASS |
Rick Jackson
|
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 14:58:40. Contact: ###-####.
|
BLD-Final | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | FAIL |
Tony Young
|
|
|
fire is also going out ###-####
need trade signoffs 9/12/2000 10:12:17 AM
|
FIRE-Final Inspection | 9/11/2000 | 9/12/2000 | 9/12/2000 | A | FAIL |
Rick Jackson
|
|
|
structural is also going out Ron ###-#### rated doors in bathroom; exit signs; detectors for doors on hold opens 9/12/2000 10:04:56 AM
|
BLD-Final | 9/7/2000 | 9/7/2000 | 9/7/2000 | P | FAIL |
Tony Young
|
|
|
Ron ###-####
need plans and trades signed off 9/7/2000 3:06:40 PM
|
BLD-Framing/Rough-in | 7/25/2000 | 7/26/2000 | 7/26/2000 | A | PASS |
Tony Young
|
|
|
ceiling grid ###-####
done by 301 ok 8/1/2000 4:57:23 PM
|
BLD-Framing/Rough-in | 7/20/2000 | 7/21/2000 | 7/21/2000 | A | FAIL |
Tony Young
|
|
|
ceiling grid in front lobby ###-#### C/N left 7/21/00 1:00:20 PM
|
BLD-Framing/Rough-in | 7/14/2000 | 7/14/2000 | 7/14/2000 | P | CANC |
|
|
|
###-#### out of time 7/17/2000 11:36:31 AM
|
BLD-Framing/Rough-in | 7/11/2000 | 7/12/2000 | 7/12/2000 | P | FAIL |
Tony Young
|
|
|
Jerry ###-#### Elec. not signed off- front entry area 7/13/00 11:29:27 AM
|
BLD-Framing/Rough-in | 7/6/2000 | 7/6/2000 | 7/6/2000 | P | PASS |
Tony Young
|
|
|
Mike ###-#### ceiling insp please call when you go out Lunch room/ team space NE corner 7/7/00 1:33:55 PM
|
BLD-Framing/Rough-in | 7/3/2000 | 7/3/2000 | 7/3/2000 | P | FAIL |
Tony Young
|
|
|
ceiling grid ###-#### call first items not finished on 1st c/n 7/5/00 8:37:17 AM
|
BLD-Framing/Rough-in | 6/29/2000 | 6/30/2000 | 6/30/2000 | P | FAIL |
Tony Young
|
|
|
Terry ###-#### ceiling grid the team space northeast corner from 135 -148 and then the lunch meeting room and kitchen c/n left on ceiling pods 7/3/00 8:28:54 AM
|
BLD-Framing/Rough-in | 6/23/2000 | 6/23/2000 | 6/23/2000 | P | PASS |
Jim Storey
|
|
|
ceiling grid insp-- terry ###-#### rm#161 &134 6/23/00 4:07:06 PM
|
BLD-Framing/Rough-in | 6/20/2000 | 6/20/2000 | 6/20/2000 | P | PASS |
Tony Young
|
|
|
###-#### Ok to cover conference room only/need more grid tie wires. 6/21/00 11:35:31 AM
|
BLD-Framing/Rough-in | 6/12/2000 | 6/13/2000 | 6/13/2000 | P | PART |
Russ Owen
|
|
|
ceiling rid terry ###-#### Right side lower & floor. 6/14/00 3:32:38 PM
|
BLD-Framing/Rough-in | 6/5/2000 | 6/5/2000 | 6/5/2000 | P | PART |
Tom Arcoraci
|
|
|
ceiling insp Terry Anderson ###-#### Grid North 1/2 upper ok, trans dept. part framing non struc. ok at door. 6/6/00 11:36:34 AM
|
BLD-Framing/Rough-in | 5/16/2000 | 5/16/2000 | 5/16/2000 | P | PART |
Russ Owen
|
|
|
terry-- ###-#### r/i--call 1st before insp--ceiling grid Lower floor ok, also 1/2 of upper floor. 5/17/00 1:54:50 PM
|
BLD-Framing/Rough-in | 5/12/2000 | 5/15/2000 | 5/15/2000 | P | PART |
Jim Storey
|
|
|
terry---###-#### ceiling grid----call 1st before insp===1 pod and spreader bars in library. 5/15/00 3:26:52 PM
|
BLD-Framing/Rough-in | 5/10/2000 | 5/11/2000 | 5/11/2000 | A | CANC |
Tom Arcoraci
|
|
|
grid ceiling Terry Anderson ###-#### Unable to find called left message on phone. 5/12/00 8:46:49 AM
|
BLD-Framing/Rough-in | 5/4/2000 | 5/4/2000 | 5/4/2000 | P | FAIL |
Russ Owen
|
|
|
ceiling grid Jerry Anderson ###-#### C/n posted 5/5/00 10:15:41 AM
|
BLD-Other | 5/1/2000 | 5/1/2000 | 5/1/2000 | A | NH |
Russ Owen
|
|
|
No one there, left C/N to recall.
|
BLD-Framing/Rough-in | 4/19/2000 | 4/20/2000 | 4/20/2000 | A | FAIL |
|
|
|
Scheduled by a contractor via Hello! on 04/19/2000 at 11:19:55. Contact: . done by 407 04/24/2000 7:24:41 AM
|
BLD-Framing/Rough-in | 4/20/2000 | 4/20/2000 | 4/20/2000 | P | PART |
Russ Owen
|
|
|
###-#### 1-A and 1-B areas on first floor ok to sheetrock. 4/21/00 9:28:14 AM
|
BLD-Framing/Rough-in | 4/18/2000 | 4/19/2000 | 4/19/2000 | A | CANC |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 04/18/2000 at 13:12:16. Contact: .
|