Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 09:38:36. Contact: ###-####.--key in the spr control box by front door
|
Final | 8/30/2001 | 8/30/2001 | 8/30/2001 | P | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 08/30/2001 at 09:38:36. Contact: ###-####.--key in the spr control box by front door
|
Electrical Rough-In | 6/5/2001 | 6/6/2001 | 6/6/2001 | A | PASS |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 13:27:33. Contact: ###-####. KEY IN SPRINKLER CONTROL BOX BY FRONT PORCH survey for nail plates/ called contr 6/6/2001 9:51:19 AM
|
Electrical Rough-In | 6/5/2001 | 6/5/2001 | 6/5/2001 | P | FAIL |
Joe Ray
|
|
|
Scheduled by a contractor via Hello! on 06/05/2001 at 08:18:30. Contact: ###-####. no access 6/5/2001 3:46:38 PM
|