Final | 4/30/2002 | 5/1/2002 | 5/1/2002 | A | PASS |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/30/2002 at 15:34:21. Contact: ###-####. east-end apartments, (3-floors). 5/1/2002 8:59:47 AM
|
Final | 4/29/2002 | 4/30/2002 | 4/30/2002 | A | PART |
Marv Burrus
|
|
|
Scheduled by a contractor via Hello! on 04/29/2002 at 15:57:48. Contact: ###-####. 1st and 2nd floors ok; 3rd floor not completed. 4/30/2002 10:10:57 AM
|
Rough-In Permanent Service | 1/9/2002 | 1/9/2002 | 1/9/2002 | P | PASS |
Marv Burrus
|
|
|
###-####. eastend. 2nd and 3rd level apt. units (18 total), ele r/i. main service/ meters for 27 apartment units.
p/s ug n capitol ele #3965-ok. 1/9/2002 1:37:02 PM
|
Electrical Rough-In | 1/8/2002 | 1/8/2002 | 1/8/2002 | P | PART |
Marv Burrus
|
|
|
###-####. 1st level; apt. units (9 total), r/i. 1/8/2002 11:43:58 AM
|
Electrical Rough-In | 1/4/2002 | 1/4/2002 | 1/4/2002 | P | PASS |
Marv Burrus
|
|
|
###-####. 2nd and 3rd level westend apt units. 18 total. r/i ok 1/4/2002 10:41:26 AM
|