Final | 4/20/2003 | 4/21/2003 | 4/21/2003 | A | PASS |
Pat Lass
|
|
|
Pat,
Have made following corretions per your last inspection: (1) Box extenders on outlets that pentrated through flammable material - this was for the microwave and the hallway; (2) GFI rescepticle for jetted tub in master bathroom; (3) Adjusted outlets that had excessive gaps; (4) enclosed wires in dining nook in metal box until bench seat is built; (5) extended outlet in basement on pegboard through pegboard so cover was accessible. Think that was everything. I have a dental appointment at 8:00 am but should be available by 9:00 AM. Will leave door unlocked if you need to go earlier. Thanks.; Phone #: ###-#### Internet Inspection Request from: Richard Fritzley
|
Extend Permit 180 days | | 4/14/2003 | 4/14/2003 | | DONE |
Pat Lass
|
|
|
ok per Jim Schmer
|
Final | 4/14/2003 | 4/14/2003 | 4/14/2003 | P | FAIL |
Pat Lass
|
|
|
###-#### early pm call first
recep position in faceplates, GFCI hydromassage tub, metal box for open wires,
add recep for pump 4/14/2003 1:34:15 PM
|
Electrical Rough-In | 12/2/2002 | 12/2/2002 | 12/2/2002 | A | PASS |
Pat Lass
|
|
|
Pat,
Ready for rough-in. Please call the number listed at least 20 minutes in advance so I can be at the site for the inspection. Thanks.; Phone #: ###-#### Internet Inspection Request from: Richard Fritzley
|
Rough-In Permanent Service | 10/31/2002 | 10/31/2002 | 10/31/2002 | A | PASS |
Tim McCullough
|
|
|
Pat,
I have changed out the ground wire on the second 200 amp disconnect from #6 to #4 as you directed, so the service entrance is ready for inspection.; Phone #: ###-#### Internet Inspection Request from: Richard Fritzley
ps/ok/ug/new 10/31/2002 1:21:36 PM
|
Rough-In Permanent Service | 10/24/2002 | 10/25/2002 | 10/25/2002 | A | FAIL |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/24/2002 at 11:43:47. Contact: ###-####.Undersized GEC to 200a disconnect 10/25/2002 9:41:19 AM
|
Rough-In Permanent Service | 10/16/2002 | 10/17/2002 | 10/17/2002 | A | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 10/16/2002 at 15:05:48. Contact: ###-####. conf 10/17/2002 12:21:11 PM
|
Electrical Rough-In | 10/13/2002 | 10/14/2002 | 10/14/2002 | A | NR |
Pat Lass
|
|
|
Scheduled by a contractor via Hello! on 10/13/2002 at 22:10:42. Contact: ###-####.
conf only 10/14/2002 9:46:02 AM
|