Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberELE04-01830
StatusFinaled
Name RELIABLE ELECTRIC INC
Site Address 6122 W LUBKIN ST
Project Name 
Customer Number 
ePlanReview 
Description
Change from 3 room to 5 room per Mike Ramsey///12/27/04 BAS
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/19/20069/20/20069/20/2006PPASS
DetailsJack Frank
Scheduled by a contractor via Hello! on 9/19/2006 at 4:07:05 PM. Contact: ###-####. ok
Final9/14/20069/15/20069/15/2006AFAIL
DetailsJack Frank
mike - call for access; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley corr. fee due see notes fee due
Electrical Rough-In8/22/20068/23/20068/23/2006PPASS
DetailsJack Frank
mike; Phone #: ###-#### Internet Inspection Request from: Barbara Buckley
storage basement ok
Final8/2/20068/3/20068/3/2006PNR
DetailsJack Frank
please call prior to inspection so it can be opened ###-#### Mike see added r/i
Electrical Rough-In8/3/20068/3/20068/3/2006PPART
DetailsJack Frank
please call prior to inspection so it can be opened ###-#### Mike ok corr. made, bath rm ok, island in kit needs too meet requirements of 210.52 (C)(1) 2ft 4ft rule gave cover contractor will corr. I will check it at time of final
Rough-In Permanent Service1/20/20051/21/20051/21/2005PPASS
DetailsBob Reichert
mike; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie--re-insp Met with contractor and he has done the corrections, except he is going to put a ground bushing in the service panel for the recpt since he used reducing washers. ok to cover closet walls and I put a sticker on the panel, even though it has a working meter. 1/21/2005 12:48:50 PM
Rough-In Permanent Service12/27/200412/28/200412/28/2004AFAIL
DetailsJack Frank
please call for access mike ###-#### cor. posted met contractor 250.52(A)(1) grd to water, 110.26(F)(2) clearence for service,,250.8 no SMS, shall not ID 6 or smaller grds and neutrals , bond bushing for RE washers, use manufactures equip grd bus, job not ready 12/28/2004 9:19:37 AM