Information based on query as of Monday, July 1, 2024.
Permit Information
Permit NumberELE04-03064
StatusFinaled
Name PEAK ELECTRIC
Site Address 107 N CASTELLO PL
Project Name 
Customer NumberMARSOLER POOL
ePlanReview 
Description
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final10/25/200410/26/200410/26/2004APASS
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 10/25/2004 at 1:32:25 PM. Contact: ###-####.
Final10/15/200410/15/200410/15/2004PFAIL
DetailsWilliam E Thomas
Scheduled by a contractor via Hello! on 10/15/2004 at 8:01:31 AM. Contact: ###-####.
680.23F3-no gfci protected conductors to occupy conduit space with non gfci protected conductors
680.12-disconnect for all utilization equipment to be installed within sight of equipment
680.26-pool equipment bonding conductor shall not be connected to equipment grounding conductors
680.26B3-all metal components shall be bonded
* the water level needs to be lowered so that the potting compound can be inspected. 10/15/2004 4:21:19 PM 10/15/2004 4:21:33 PM
Electrical Rough-In10/6/200410/6/200410/6/2004PPASS
DetailsPat Lass
###-#### - todd Note: Pool Bonding