Final | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jim Williams ok listing for press and corrections made 2/1/2005 12:42:12 PM
|
Electrical Rough-In | 1/31/2005 | 1/31/2005 | 1/31/2005 | A | PART |
Jack Frank
|
|
|
conference ok
|
Final | 1/28/2005 | 1/28/2005 | 1/28/2005 | P | FAIL |
Jack Frank
|
|
|
kim ; Phone #: ###-#### Internet Inspection
Request from: Marsha Smylie cor. posted called, 300.10 bond bushing for REwashers, 314.28, shall provide required distance between raceways, as code noted states, 250.148 tag equip grd to boxes, power for press red taged and turned off,
asked owner frist if press power could be turned off he said yes ETL testing did not follow Boise City process for field testing
1/28/2005 5:00:41 PM 1/28/2005 5:01:11 PM
|
Permanent Service | 12/19/2004 | 12/20/2004 | 12/20/2004 | A | PASS |
Jack Frank
|
|
|
Phone #: ###-#### Internet Inspection Request from: Jim Williams needs 2 grd rods size bonding to 250.66, remove sprinkler equip from below p/s
p/s u/g rec. ok 12/20/2004 8:28:52 AM
|