Final | 8/8/2005 | 8/8/2005 | 8/8/2005 | P | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 8/8/2005 at 9:57:40 AM. Contact: ###-####. ok final
|
Rough-In Permanent Service | 6/13/2005 | 6/14/2005 | 6/14/2005 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 6/13/2005 at 5:52:06 PM. Contact: ###-####. corrections made, ric ok , p/s u/g n ok
|
Rough-In Permanent Service | 6/9/2005 | 6/10/2005 | 6/10/2005 | A | FAIL |
Bob Reichert
|
|
|
shawn ###-#### called, left message, left corr notice, 300.4(A)(1) edge of hole shall be 1 1/4" from edge of framing member, 300.4(B) (D) nm cable shall be 1 1/4" from edge of framing member, 312.5 gec shall have abrasion protection, 110.12(A) box shall have un-used openings closed,210.52(C)(10 kitchen outlets shall be max 24", 210.52(H) hall shall have recpt if over 10',210.52(A)(2) 2' wall shall have recpt by utility, dining room, 334.80 shall derate bundled cable over panel, 110.14(A) terms for more than 1 conductor shall be identified,BCC job id sticker shall be posted, approved set of plans shall be on job
|