Final | 2/20/2006 | 2/21/2006 | 2/21/2006 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 2/20/2006 at 9:47:33 AM. Contact: ###-####. ok
|
Permanent Service | 11/1/2005 | 11/2/2005 | 11/2/2005 | A | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 11/1/2005 at 1:29:33 PM. Contact: ###-####. p/s u/g new ok
|
Rough-In Permanent Service | 10/27/2005 | 10/28/2005 | 10/28/2005 | P | PART |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/27/2005 at 2:47:43 PM. Contact: ###-####. r/i only ok see added fee due inspection for p/s
|
Rough-In Permanent Service | 10/21/2005 | 10/27/2005 | 10/27/2005 | P | FAIL |
Jack Frank
|
|
|
steve-- ###-#### cor ,do not cover called let message, 250.64 (C)&(E) shall not splice GEC, and use conn. for GEC at panels,314.43 no nails or screws in plastic boxes,210.52(B) remove range hood from kit circuit, complete all makeup outside boxes
|