Final | 10/29/2007 | 10/30/2007 | 10/30/2007 | A | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 10/29/2007 at 3:47:57 PM. Contact: ###-####. ok to final, called contractor
|
Electrical Rough-In | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | PASS |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 10:20:33 AM. Contact: ###-####. u/g house to garage ok
|
Permanent Service | 10/4/2007 | 10/4/2007 | 10/4/2007 | P | CANC |
Jack Frank
|
|
|
Scheduled by a contractor via Hello! on 10/4/2007 at 10:20:33 AM. Contact: ###-####. see added r/i
|
Electrical Rough-In | 9/7/2007 | 9/7/2007 | 9/7/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/7/2007 at 8:46:30 AM. Contact: ###-####. corrections made, ric ok, Note: no inspection made from house to garage for u/g
|
Electrical Rough-In | 9/6/2007 | 9/6/2007 | 9/6/2007 | P | FAIL |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 10:36:34 AM. Contact: ###-####. called contr, corrections not all made, crossed off what was fixed on corr notice, fee due
|
Permanent Service | 9/6/2007 | 9/6/2007 | 9/6/2007 | P | PASS |
Bob Reichert
|
|
|
Scheduled by a contractor via Hello! on 9/6/2007 at 10:36:34 AM. Contact: ###-####. p/s u/g n ok
|
Rough-In Permanent Service | 9/5/2007 | 9/5/2007 | 9/5/2007 | P | FAIL |
Bob Reichert
|
|
|
Tom; Phone #: ###-#### Internet Inspection Request from: Hattie James called ,NEC 110.26(a) work space shall be provided about equipment- no low voltage below panel, 312.5 shall provide abrasion protection for all conductors entering enclosures, 300.4(A)&(D) edge of bored holes and nm cable shall be 1 1/4" from edge of framing members, 314.20 boxes shall be flush with finished surface in walls of combustible materials, 210.52(A)(2) shall provide recpts in 2' walls, 334.30 flat nm cable shall not be stapled on edge, 314.17(C) nm cable shall be stapled within 8" of box, BCC all underground shall be inspected before cover, address shall be posted
|