Final | 4/2/2009 | 4/3/2009 | 4/3/2009 | A | PASS |
Bob Reichert
|
|
|
Inspection on cylinder blasters with UL corrections. Phone #: ###-#### Internet Inspection Request from: Mark Sessionsn ok to final, signed occupancy card, esc finalled
|
Conference | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | DONE |
Mike Kinnear
|
|
|
meet bob 370 & norc people regard two sand blasting machines. bob felt that they should be field evaluated by an approved testing lab. the norco people said they were going to get this started.
|
Conference | 2/24/2009 | 2/24/2009 | 2/24/2009 | P | DONE |
Bob Reichert
|
|
|
met with 412 and building people, looked at bottle sandblasting machines, determined that they require an evaluation by recognized testing laboratory. One of the machines (north) does not have thermal overloads for the motors, south machine does have, neither have proper labelling, overcurrent protection is not per drawing located on one machine, each has two sources of incoming power, need to see motors to verify ampacity,some of the internal components do not have proper listings, there are not assembly listings on the machines. The plant people indicated they would contact a nationally recognized testing lab for a field evaluation.
|
Conference | 2/12/2009 | 2/20/2009 | 2/20/2009 | A | DONE |
Mike Kinnear
|
|
|
Conference inspection requested at 9:00 a.m. Contact Cornel Larson ###-####.; Phone #: ###-#### meeting with 324 & norco reps. regarding listings on equipment
|
Conference | 1/28/2009 | 1/28/2009 | 1/28/2009 | P | DONE |
Mike Kinnear
|
|
|
Please call 15 minutes prior to arrive so we can meet you there. Phone #: ###-#### Internet Inspection Request from: Mark Sessions t/w norco owner & elcctrian all machinery shall be listed & so labled. they need to find the lables & show me. note esc permit has been finaled.
|
Final | 1/26/2009 | 1/28/2009 | 1/28/2009 | P | CANC |
Mike Kinnear
|
|
|
Please call 15 minutes prior to arrive so we can meet you there. Phone #: ###-#### Internet Inspection Request from: Mark Sessions wrong type inspection
|
ELE-Aging Inspection | 12/2/2008 | 12/2/2008 | 12/2/2008 | | NR |
Mike Kinnear
|
|
|
t/w troy ###-#### norco just started moving equip. over
|
Electrical Rough-In | 10/2/2008 | 10/2/2008 | 10/2/2008 | P | PASS |
Mike Kinnear
|
|
|
Jared Phone #: ###-#### ok cover under ground conduit for explosion box & seal off
|
Final | 9/26/2008 | 9/26/2008 | 9/26/2008 | P | PART |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 9/26/2008 at 6:55:32 AM. Contact: ###-####. part final office area only
|
Electrical Rough-In | 9/17/2008 | 9/17/2008 | 9/17/2008 | A | PART |
Mike Kinnear
|
|
|
jared ###-#### ok class one area with switches & lights need to see at final
|
Electrical Rough-In | 9/15/2008 | 9/15/2008 | 9/15/2008 | P | PASS |
Mike Kinnear
|
|
|
jared - recessed can at main entrance Phone #: ###-#### ok cover rec lights in entry. ext.
|
Conference | 9/11/2008 | 9/11/2008 | 9/11/2008 | P | DONE |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 9/11/2008 at 7:06:42 AM. Contact: ###-####. conf sewer lift station
|
Final | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | CANC |
Mike Kinnear
|
|
|
Jared Phone #: ###-#### wrong type of inspection
|
Electrical Rough-In | 8/28/2008 | 8/28/2008 | 8/28/2008 | P | PASS |
Mike Kinnear
|
|
|
Jared Phone #: ###-#### ok cover ceiling anop
|
Conference | 8/8/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Mike Kinnear
|
|
|
9:00 a.m. on site conference meeting with all trades - for any questions contact Jim Storey ok conf for early production area
|
Conference | 8/8/2008 | 8/19/2008 | 8/19/2008 | A | PASS |
Jim Schmer
|
|
|
9:00 a.m. on site conference meeting with all trades - contact Jim Storey with any questions
|
Electrical Rough-In | 8/14/2008 | 8/14/2008 | 8/14/2008 | P | PASS |
Mike Kinnear
|
|
|
Jared Phone #: ###-#### ok cover hard lid ceiling anop
|
Rough-In Permanent Service | 8/14/2008 | 8/14/2008 | 8/14/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 8/14/2008 at 6:40:24 AM. Contact: ###-####. ri not ready p/s u/g n ok note no meter base to put the sticker. will put it on when IPCO installs the meter base
|
Electrical Rough-In | 8/4/2008 | 8/4/2008 | 8/4/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 8/4/2008 at 6:57:01 AM. Contact: ###-####. ok cover walls only anop
|
Electrical Rough-In | 7/25/2008 | 7/25/2008 | 7/25/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 7/25/2008 at 6:36:09 AM. Contact: ###-####. ok cover walls only anop
|
Electrical Rough-In | 7/22/2008 | 7/22/2008 | 7/22/2008 | A | PASS |
Mike Kinnear
|
|
|
Scheduled by a contractor via Hello! on 7/22/2008 at 6:26:43 AM. Contact: ###-####. ok cover walls only anop
|
Electrical Rough-In | 5/21/2008 | 5/22/2008 | 5/22/2008 | A | PASS |
Mike Kinnear
|
|
|
Jared; Phone #: ###-#### Internet Inspection Request from: Cathy Weisshaupt ok cover under slab conduit north side building
|
Electrical Rough-In | 5/16/2008 | 5/19/2008 | 5/19/2008 | A | PART |
Mike Kinnear
|
|
|
jared - underground Phone #: ###-#### ok cover under slab condit south side
|
Electrical Rough-In | 5/12/2008 | 5/13/2008 | 5/13/2008 | A | PASS |
Mike Kinnear
|
|
|
sean Phone #: ###-#### ok cover under slab conduit under slab equip pad s. e. corner
|
Electrical Rough-In | 5/6/2008 | 5/7/2008 | 5/7/2008 | A | PASS |
Mike Kinnear
|
|
|
shawn - underground Phone #: ###-#### ok cover under slab conduit s.e. corner of blding & ext pole lights & power for fuel power
|
Electrical Rough-In | 4/30/2008 | 4/30/2008 | 4/30/2008 | P | PASS |
Mike Kinnear
|
|
|
sean - late afternoon please Phone #: ###-#### ok cover boxes & conduit in stem walls
|
Electrical Rough-In | 4/23/2008 | 4/24/2008 | 4/24/2008 | A | PART |
Jack Frank
|
|
|
sean - uffer Phone #: ###-#### electrode ok
|
Conference | 2/12/2009 | 2/20/2009 | | A | |
Jim Schmer
|
|
|
Conference inspection at 9:00 a.m. Contact Cornel Larson ###-####; Phone #: ###-####
|