Final | 12/9/2008 | 12/10/2008 | 12/10/2008 | A | PASS |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS met contractor, ok to final, signed occupancy card
|
Electrical Rough-In | 10/30/2008 | 10/30/2008 | 10/30/2008 | P | PART |
Jack Frank
|
|
|
Please inspect trench and conduit on north side of building. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC ok
|
Rough-In Permanent Service | 10/21/2008 | 10/21/2008 | 10/21/2008 | P | PASS |
Bob Reichert
|
|
|
eric Phone #: ###-#### p/s u/g n ok, one response only to esc
|
Electrical Rough-In | 10/10/2008 | 10/10/2008 | 10/10/2008 | P | PASS |
Bob Reichert
|
|
|
Please inspect underground conduit from building to parking lot lights. Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS ok to cover u/g across parking lot
|
Rough-In Permanent Service | 9/9/2008 | 9/10/2008 | 9/10/2008 | A | PART |
Mike Kinnear
|
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS ok cover walls & hard lid ceilings service not ready t/w eric regarding grounding electrode
|
Rough-In Permanent Service | 9/8/2008 | 9/8/2008 | 9/8/2008 | P | FAIL |
Bob Reichert
|
|
|
Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS called, left correction notice, NEC 250.94 shall provide intersystem bonding termination, 110.12(A) unused openings shall be closed in panel, 348.26 there shall not be over 360 degree bends in fmc, 330.30(B) mc shall be secured within 12" of termination, 300.14 there shall be at least 6" free conductor left in each box (mezzanine), 300.4(D) shall provide 1 1/4" to raceway from edge of framing member, 110.26(F)(1) ducts shall not be in dedicated space above panel, BCC shall have approved set of plans on job, separate permit shall be provided for each meter location, shall post job id sticker, shall post job address
|