Information based on query as of Thursday, July 18, 2024.
Permit Information
Permit NumberELE08-02432
StatusFinaled
Name A M E ELECTRIC
Site Address 1165 E BRAEMERE RD
Project Name 
Customer Number459-8959
ePlanReview 
Description
Electrical Permit - New: Provide and install electrical for new pump house
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/24/20094/27/20094/27/2009APASS
DetailsPat Lass
Need to schedule in order to have pump house unlocked Pat Lass and I had discussed 8:15am as a meeting time if that changes please call Mike at ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
Final4/16/20094/20/20094/20/2009AFAIL
DetailsPat Lass
WE NEED TO SCHEDULE A TIME TO GAIN ACCESS TO THE FACILITY PLEASE CALL MIKE AT ###-#### ON MONDAY MORNING TO CONFIRM MEETING TIME. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
bond electrodes together and install guy kit
ELE-Aging Inspection3/17/20093/17/20093/17/2009 NR
DetailsPat Lass
suc
Rough-In Permanent Service11/13/200811/13/200811/13/2008PPASS
DetailsPat Lass
Mark is at job site and the service corrections have been made. Mark can be reached at ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
P/S U//G N Ok
Rough-In Permanent Service11/11/200811/12/200811/12/2008PFAIL
DetailsJack Frank
Mark is at the job site and can be reached at ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
all violations not corrected, also needs listed choke main water bond in rigid inside of building, and shall bond CT can with both paralled conductors or a 1/0 copper
Electrical Rough-In10/29/200810/29/200810/29/2008PPASS
DetailsMike Kinnear
Would like to have a rough cover inspection for the ceiling portion of the project. Dean is at the job ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen ok cover ceiling only
Conference10/27/200810/28/200810/28/2008APART
DetailsPat Lass
Would like to meet at job site at around 9:00a.m. to go over some clearance isses, if there is a problem please Mike at ###-####. Dean will be the job site contact ###-####. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
talked about clearances
Rough-In Permanent Service10/9/200810/9/200810/9/2008PFAIL
DetailsPat Lass
If possible we would like the inspection as early as possible in the afternoon. This inspection is to energize the service disconnect only please call Mike any questions. ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
Main bonding jumper is not installed with screw to neutral bus and screw hole has damaged threads. Electrode connection is ok for concrete to be poured. working clearance will be checked on final per conversation with mike.
Conference10/7/200810/8/200810/8/2008ADONE
DetailsMike Kinnear
Need phone confrence to discuss power swing to facility with only service disconnect and ATS installed at this juncture. Mike ###-#### Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen phone conf. with wayne it should be ok for service & ats on the ext. of building. if grounding & if service is ready.
Electrical Rough-In9/2/20089/3/20089/3/2008PPASS
DetailsPat Lass
U/G INSPECTION FOR LATE A.M. IF YOU HAVE TIEM OR EARLY AFTERNOON WOULD WORK TALK WIHT LUKE OR MARK AT JOB SITE. PLEASE CALL MIKE @###-#### WITH ANY QUESTIONS. Phone #: ###-#### Internet Inspection Request from: Mike TenHulzen
Ok for underground