Final | 7/7/2009 | 7/8/2009 | 7/8/2009 | A | PASS |
Doug A Poedy
|
|
|
mark Phone #: ###-#### ok final
|
Electrical Rough-In | 4/29/2009 | 4/29/2009 | 4/29/2009 | P | PASS |
Bob Reichert
|
|
|
Mark Phone #: ###-#### called contractor, ric ok, no esc this project
|
Electrical Rough-In | 4/27/2009 | 4/28/2009 | 4/28/2009 | A | PART |
Pat Lass
|
|
|
mark Phone #: ###-#### ok to cover all but cold air returns
|
Electrical Rough-In | 4/23/2009 | 4/24/2009 | 4/24/2009 | P | FAIL |
Pat Lass
|
|
|
Mark Phone #: ###-#### Posted partial correction walls to be opened up for full inspection after corrections are made.
|