Permit Information
Permit NumberELE09-00694
StatusFinaled
Name L & K ELECTRIC
Site Address 2390 E FREIGHT ST
Project NameWinco Distribution Center T I
Customer Number 
ePlanReview 
Description
install outlets,lighting,floor boxes, all wiring for office per initial cert of value $2,220,000.00 ///DLD ( ALL FEES HAD BEEN PAID ON ELE08-03233)
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final9/11/20099/14/20099/14/2009APASS
DetailsBob Reichert
This is a final inspection please. Contact is Rey. Have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw corrections made, ok to final, signed occupancy card, no esc this project
Final9/11/20099/11/20099/11/2009PCANC
DetailsBob Reichert
This will be a final inspection please. Contact is Rey. Have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw 412 and 370 requested that morning inspection would be better due to amount of items to look at, they will recall
Final8/5/20098/5/20098/5/2009PPART
DetailsBob Reichert
This inspection will be for a final please. Contact is Rey. Thank you and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw working on corrections, need to change wiring at north light poles for green or bare grounds, repair connections- to be tight, add bell ends to u/g conduit in electrical rooms, strap emt, finish signs at panels for voltage identification, will schedule inspection for ammonia area later, told contractor owner can move in, have not signed t/o card yet, no esc this project,
Final8/5/20098/5/20098/5/2009APART
DetailsBob Reichert
look at dry goods for part final walked job with 412 and contractor, needs to add box support at outside fire valve,check listing for a/c in fire riser room, re-fuse disc for a/c, cover lb, bond piping system, in office, bond hw heater tighten all receptacles, strap mc, add fixture clip, add gfci by sink, ok to cover ceiling, add 8x8 box cover, fix dead receptacle, strap conduit, move bollards, provide work space about transformer disconnect, left correction notice NEC 110.26(A)(1),(2), (3) shall provide work space about electrical equipment- bollards and transformer disconnect
Electrical Rough-In7/29/20097/30/20097/31/2009ANR
DetailsMike Kinnear
This inspection wiil be a reinspection for the ceiling that was plenum. contact is Drew White. Thank you and have a great day! Phone #: ###-#### Internet Inspection Request from: Laura Longshaw t/w Drew mech. inspector will advise us when the return air plenum is corrected.
Electrical Rough-In7/31/20097/31/20097/31/2009APART
DetailsBob Reichert
This inspection is for over head ceiling. Rey in the contact. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok to cover ceilings in office area, no esc this project, went with 412, ceilings are changing to not being plenum depnding on structural concurrence
Electrical Rough-In7/23/20097/23/20097/23/2009PFAIL
DetailsMike Kinnear
This inspection will be for a ceiling inspection. Contact is Rey. Thank you and have a wonderful day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ceiling the low voltage wiring is not plenum rated. note the high voltage wiring in the main office area is ok.
Electrical Rough-In7/23/20097/23/20097/23/2009PPART
DetailsBob Reichert
hv only ok for main office ceilings, not to be covered, lv wiring not plenum rated, will call for later inspection, met and inspected with 412
Conference7/21/20097/21/20097/21/2009ADONE
DetailsBob Reichert
preview final-- met 412, walked part of job to pre-final, found strapping issues, open ko, noted that ceiling is air plenum, and that low voltage wiring shall be plenum rated, violations at gear for drip shield and front clearance due to bollards too close, will go up in lift to see high bay wiring later, discussed giving ok to cover ceilings, and plug checking to final areas as requested
Conference7/2/20097/2/20097/2/2009ADONE
DetailsBob Reichert
met with contractor and other electrcal inspectors to review switchgear that did not have good instructions for gounding transformer, no esc this project
Electrical Rough-In7/2/20097/2/20097/2/2009APART
DetailsJack Frank
ok met with 412,370, and Doug
Permanent Service6/4/20096/4/20096/4/2009PPASS
DetailsMike Kinnear
This inspection is for all 3 p/s. Rey is contact. Thank you and have a wonderful day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw p/s u/g n ok note correction NEC310.4(A)(B)(1)thru(5) a proper load bank test on these services shall be completed prior to final sign off.
Permanent Service6/3/20096/3/20096/3/2009PNR
DetailsJack Frank
This inspection will be a follow-up from yesterday for all 3 p/s. Contact is Rey. Thank you and please have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw
412 and myself met contr , not ready shall have all p/s conductors terminated at xformer, grding , bonding, ok at all 3 locations , still needs labels will check that at time of final
Permanent Service6/2/20096/2/20096/2/2009PNR
DetailsJack Frank
This permit is for Main Service/switch gear. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw will do p/s 06-03-09 when all 3 p/s are ready
Electrical Rough-In6/1/20096/1/20096/1/2009PPART
DetailsMike Kinnear
This inspection will be for a rough in, in wall and overhead. Contact is Rey. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover walls & hard lid ceilings only
Electrical Rough-In5/26/20095/26/20095/26/2009PPART
DetailsMike Kinnear
This inspection will be for an in wall rough-in. Contact is Rey. Thank you and have a great day Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover walls only anop
Electrical Rough-In5/20/20095/20/20095/20/2009PPART
DetailsMike Kinnear
This inspection will be for a partial in wall rough in. Contact is Rey. Thank you and have a wonderful day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover walls only anop note no esc permit in project
Electrical Rough-In5/11/20095/11/20095/12/2009PPART
DetailsMike Kinnear
This will be for a rough in wall inspection. Contact is Rey Torres. Thank you and have a great day. Phone #: ###-#### Internet Inspection Request from: Laura Longshaw ok cover walls & hard lid ceilings anop
Electrical Rough-In4/23/20094/24/20094/24/2009APART
DetailsMike Kinnear
Ray Phone #: ###-#### ok cover floor boxes main office & walls warehouse office anop