Final | 7/13/2010 | 7/14/2010 | 7/14/2010 | A | PASS |
Bob Reichert
|
|
|
Key under mat Phone #: ###-#### >> Inspection requested via web by Dan Rohl ok to final
|
Final | 7/13/2010 | 7/13/2010 | 7/13/2010 | P | NR |
Bob Reichert
|
|
|
Key under mat Phone #: ###-#### >> Inspection requested via web by Dan Rohl missing receptacles, plates, loose receptacles, panel schedule
|
Electrical Rough-In | 3/9/2010 | 3/10/2010 | 3/10/2010 | A | PASS |
Bob Reichert
|
|
|
Key under mat Inspection requested from web by: Dan Rohl Phone #: ###-#### corrections made, ric ok, no esc this project
|
Electrical Rough-In | 3/1/2010 | 3/2/2010 | 3/2/2010 | A | FAIL |
Bob Reichert
|
|
|
Key under mat Inspection requested from web by: Dan Rohl Phone #: ###-#### called, left correction notice, NEC 300.4A&D edge of bored holes and nm cable and raceways shall be 1 1/4" from edge of framing members, 334.30 nm cable shall be stapled within 8" of box and not be stapled on edge, 110.26(F)(1) there shall be no piping in dedicated space over panel, BCC shall install fixtures and boxes for ri- down stairs and outside recpt, NOTE corrections shall be made within 5 working days or further action will be taken
|