Final | 2/21/2011 | 2/22/2011 | 2/22/2011 | A | PASS |
Jack Frank
|
|
|
Final for Idaho Power easy upgrades job - replacing T12 lamps and ballasts with T8. Thank you! Phone #: ###-#### >> Inspection requested via web by Adam Staigle
|
Electrical Rough-In | 1/28/2011 | 1/28/2011 | 1/28/2011 | P | PASS |
Daryl DeGrange
|
|
|
Process inspection to confirm materials being installed. Phone #: ###-#### >> Inspection requested via web by Adam Staigle ri ok checkec UL listing
|