Final | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Rock A. Hudson
|
|
|
Contact Tom for final walkdown of the basement garage. Phone #: ###-#### Inspection requested via web by Tom Betty Below grade parking garage final ok
|
Final | 12/8/2016 | 12/8/2016 | 12/8/2016 | P | PASS |
Rock A. Hudson
|
|
|
Below grade parking garage no damage to electrical from flood. Final ok
|
Electrical Rough-In | 11/22/2016 | 11/22/2016 | 11/22/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Garbage compactors and Container winch motors Disconnect Locations and Use of Cords in lieu of fixed wiring Article 400 EM stops Phone #: ###-#### Inspection requested via web by Tom Betty 400.8(2)- Flexible cord for the hydraulic control shall not be run thru floor of platform. Shall be protected from physical damage. Rest of winches, disconnecting means, wiring methods ok
|
Conference | 11/16/2016 | 11/16/2016 | 11/16/2016 | P | DONE |
Rock A. Hudson
|
|
|
RE-INSPECTION late AM if possible Thanks Rock Phone #: ###-#### Inspection requested via web by Tom Betty Discussed Annex building outdoor lighting. Wanted to know if temp occupancy ok with lights hung on unfinished walls and columns. All egress lighting once installed shall remain in place for an emergency situation. If lights can remain in place YES, if lights are removed for finish NO. Need Fence or barrier to keep public away from heat trace for grease tank
|
Final | 11/16/2016 | 11/16/2016 | 11/16/2016 | A | PART |
Rock A. Hudson
|
|
|
RE-INSPECTION late AM if possible Thanks Rock Phone #: ###-#### Inspection requested via web by Tom Betty Must have a barrier, fence or enclosure around 277 volt heat tape for grease tank. Jump parking garage temp final ok
|
Final | 11/15/2016 | 11/15/2016 | 11/15/2016 | P | FAIL |
Rock A. Hudson
|
|
|
Call Tom for final walk down of Garage. Phone #: ###-#### Inspection requested via web by Tom Betty 110.3- Some general purpose receptacle outlets not working due to damage from construction. 1 circuit showed open neutral. 300.4- Flex connector cover on transformer T-DPAMPH missing. Exposed wiring subfect to physical damage. 300.15(A)- LB covers shall remain accessible after installation. Main level LB fitting 1/2 covered in concrete. 426.11- Grease tank in parking garage wrapped with heat trace cable shall have a barrier to protect from physical damage.
|
ELE-Aging Inspection | 10/27/2016 | 10/27/2016 | 11/2/2016 | | PASS |
Rock A. Hudson
|
|
|
Still under construction
|
ELE-Aging Inspection | 7/28/2016 | 7/28/2016 | 7/28/2016 | | PASS |
Rock A. Hudson
|
|
|
Still under construction
|
Electrical Rough-In | 4/28/2016 | 4/29/2016 | 4/29/2016 | A | PASS |
Rex Boyles
|
|
|
Call Brandon Robinson for basement restroom rough in. Phone #: ###-#### Inspection requested via web by Tony Keen r/i ok valet bathroom will install access panels for j boxes
|
ELE-Aging Inspection | 4/6/2016 | 4/6/2016 | 4/7/2016 | | DONE |
Rex Boyles
|
|
|
still under construction
|
ELE-Aging Inspection | 1/6/2016 | 1/6/2016 | 1/6/2016 | | DONE |
Rex Boyles
|
|
|
still under construction
|
ELE-Aging Inspection | 10/7/2015 | 10/7/2015 | 10/8/2015 | | DONE |
Rex Boyles
|
|
|
Still in progress
|
Final | 7/8/2015 | 7/10/2015 | 7/10/2015 | P | PART |
Rex Boyles
|
|
|
Contact Mark Preston for generator vault inspection. Phone #: ###-#### Inspection requested via web by Tom Betty final ok on generator vault. Heat tape and battery chargers still need to be seen.
|
ELE-Aging Inspection | 4/17/2015 | 4/17/2015 | 4/17/2015 | | DONE |
Daryl DeGrange
|
|
|
still under construction
|
ELE-Aging Inspection | 1/16/2015 | 1/16/2015 | 1/20/2015 | | DONE |
Rex Boyles
|
|
|
still under const.
|
Permanent Service | 10/17/2014 | 10/17/2014 | 10/17/2014 | P | PASS |
Rex Boyles
|
|
|
Come to Lea Electric job trailer for breaker testing documentation. Phone #: ###-#### Inspection requested via web by Tom Betty p/s u/g n ok received performance test docs from switchgear manufacturer as per 230.95(C)
|
Permanent Service | 10/15/2014 | 10/15/2014 | 10/15/2014 | A | FAIL |
Rex Boyles
|
|
|
Call Jon. This inspection is in conjunction with inspection for permit # ELE13-01291 Phone #: ###-#### Inspection requested via web by Tom Betty performance testing documents needed as per 230.95C prior to energizing
|
ELE-Aging Inspection | 8/25/2014 | 8/25/2014 | 8/28/2014 | | DONE |
Rex Boyles
|
|
|
still under construction
|
Electrical Rough-In | 10/22/2013 | 10/22/2013 | 10/22/2013 | P | PASS |
Rock A. Hudson
|
|
|
Basement electrical room conduit under raised floors. Phone #: ###-#### >> Inspection requested via web by Tony Keen Garage basement 3 raised floor pours rough in ok cover
|
Electrical Rough-In | 8/21/2013 | 8/22/2013 | 8/22/2013 | A | PASS |
Rock A. Hudson
|
|
|
john Phone #: ###-#### Helix 3rd floor pour and garage north central as marked on print. Rough in ok cover
|
Electrical Rough-In | 8/8/2013 | 8/8/2013 | 8/8/2013 | P | PASS |
Rock A. Hudson
|
|
|
tony Phone #: ###-#### Pour 14-B as noted on print. Rough in ok cover
|
Electrical Rough-In | 7/11/2013 | 7/12/2013 | 7/11/2013 | A | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Basement ceiling pour north east of helix as noted on print rough in ok cover
|
Conference | 6/25/2013 | 6/25/2013 | 6/25/2013 | P | DONE |
Rock A. Hudson
|
|
|
tony Phone #: ###-#### Discussed fire pump feeders and circuit conduits and fire protection and seperation from normal power conduits.
|
Electrical Rough-In | 6/21/2013 | 6/21/2013 | 6/21/2013 | P | PASS |
Rock A. Hudson
|
|
|
John Phone #: ###-#### As noted on print 3rd floor, area B, PT deck Rough in ok cover
|
Electrical Rough-In | 6/17/2013 | 6/18/2013 | 6/18/2013 | P | PASS |
Rock A. Hudson
|
|
|
John Novak Phone #: ###-#### Basement floor ceiling pour as noted on print rough in ok cover
|
Conference | 6/12/2013 | 6/13/2013 | 6/13/2013 | A | DONE |
Rock A. Hudson
|
|
|
tony Phone #: ###-#### Discussed electrical for fire pumps that have moved from basement to 1st floor
|
Electrical Rough-In | 6/5/2013 | 6/5/2013 | 6/5/2013 | P | PASS |
Rock A. Hudson
|
|
|
John Phone #: ###-#### Parking garage ceiling pour as noted on print rough in ok cover
|
Electrical Rough-In | 5/29/2013 | 5/30/2013 | 5/30/2013 | A | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Ceiling pour noted on print rough in ok cover
|
Electrical Rough-In | 5/20/2013 | 5/20/2013 | 5/20/2013 | P | PART |
Doug A Poedy
|
|
|
John Phone #: ###-####. Underground section north of elevator 1 ok to cover.
|
Electrical Rough-In | 5/14/2013 | 5/14/2013 | 5/14/2013 | P | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Furthest south west ceiling pour rough in ok cover
|
Electrical Rough-In | 5/2/2013 | 5/2/2013 | 5/2/2013 | P | PASS |
Rock A. Hudson
|
|
|
tony Phone #: ###-#### Parking garage ceiling pour as noted on print. Rough in ok cover
|
Electrical Rough-In | 4/23/2013 | 4/24/2013 | 4/24/2013 | P | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Parking garage ceiling pour as noted on print. Rough in ok cover
|
Electrical Rough-In | 4/11/2013 | 4/12/2013 | 4/12/2013 | P | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Parking garage ceiling pour marked on print. rough in ok cover
|
Electrical Rough-In | 4/3/2013 | 4/4/2013 | 4/4/2013 | P | PASS |
Rock A. Hudson
|
|
|
tony Phone #: ###-#### Parking garage ceiling pour marked on print. Rough in ok cover
|
Conference | 4/1/2013 | 4/2/2013 | 4/2/2013 | A | DONE |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Discussed different manufactures service gear being intergrated together and the UL listing required showing products were tested as compatible.
|
Electrical Rough-In | 3/28/2013 | 3/29/2013 | 3/29/2013 | P | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### South central parking garage ceiling pour. Rough in ok cover
|
Electrical Rough-In | 3/21/2013 | 3/22/2013 | 3/22/2013 | P | PASS |
Rock A. Hudson
|
|
|
tony Phone #: ###-#### South central parking garage ceiling pour rough in ok cover
|
Electrical Rough-In | 2/19/2013 | 2/20/2013 | 2/20/2013 | A | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Parking garage east central pour rough in ok cover
|
Electrical Rough-In | 2/8/2013 | 2/8/2013 | 2/8/2013 | P | PASS |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Parking garage N.E. corner ceiling marked on print rough in ok cover
|
Conference | 2/5/2013 | 2/6/2013 | 2/7/2013 | A | DONE |
Rock A. Hudson
|
|
|
Tony King Phone #: ###-#### Discussed fire protection of generator feed to fire pump and how conduits are prerun. To be installed separate from normal power conduits and identified in red and signage as per code.
|
Conference | 1/29/2013 | 1/30/2013 | 1/30/2013 | A | DONE |
Rock A. Hudson
|
|
|
Tony Phone #: ###-#### Discussed code requirements for fire pump feeds.
|
Conference | 12/17/2012 | 12/18/2012 | 12/18/2012 | A | DONE |
Rock A. Hudson
|
|
|
LONNY Phone #: ###-#### Discussed additional ground rods to be added to ensure adequate true ground because of moisture barrier under entire project. sources of ground are ground rods, ground ring as drawn, concrete encased, metal water supply, fire sprinkler supply, building steel.
|