Final | 3/20/2013 | 3/21/2013 | 3/21/2013 | P | PASS |
Bob Reichert
|
|
|
Bill Phone #: ###-#### ok final
|
Permanent Service | 2/13/2013 | 2/15/2013 | 2/15/2013 | A | PASS |
Bob Reichert
|
|
|
Main service, multi meter pack. The AIC calcs from IPCO Are: Line to Line= 9,653. The Line to neutral calc is 6,840. Myers hubs have been installed, water in building is poly pipe, 2 ground rods to service. Bill Litzebauer can meet on site. Phone #: ###-#### >> Inspection requested via web by Kurt Carlson p/s u/g n ok (meter pak)
|
Rough-In Permanent Service | 2/12/2013 | 2/12/2013 | 2/12/2013 | A | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### >> Inspection requested via web by Kurt Carlson Service entrance conduits entering from top of service grear shall enter through listed meyers hub
|