DOC - Permit Finaled | | | 10/19/2015 | | DONE |
|
|
|
|
Final | 4/30/2015 | 4/30/2015 | 4/30/2015 | P | PASS |
Rex Boyles
|
|
|
Final not temp closing out permit pulling new one for the rest of the job Phone #: ###-#### Inspection requested via web by matt miller corrections made final ok
|
Final | 4/15/2015 | 4/15/2015 | 4/15/2015 | P | PART |
Rock A. Hudson
|
|
|
Final the thk bldg Phone #: ###-#### Inspection requested via web by matt miller Some valuation on this permit covers work in other areas. New permit to be pulled for other work. Temp final ok
|
Electrical Rough-In | 4/9/2015 | 4/10/2015 | 4/10/2015 | A | PASS |
Rock A. Hudson
|
|
|
Entry and restroom ceiling cover Phone #: ###-#### Inspection requested via web by matt miller Did prelimary walk through building, disconnecting means for misc equipment above 6'7" will relocate. Grid rough in ok cover
|
Electrical Rough-In | 4/3/2015 | 4/6/2015 | 4/6/2015 | A | PASS |
Rock A. Hudson
|
|
|
basin 5,ras bldg, wsr tank, daft building. Phone #: ###-#### Inspection requested via web by matt miller Areas noted conuits bonds needed in bldg #5 rough in ok
|
Permanent Service | 2/3/2015 | 2/3/2015 | 2/3/2015 | A | PASS |
Rock A. Hudson
|
|
|
Ras service Phone #: ###-#### Inspection requested via web by matt miller p/s u/g n ok
|
Permanent Service | 1/30/2015 | 1/30/2015 | 1/30/2015 | P | FAIL |
Rock A. Hudson
|
|
|
Ras bldg service Phone #: ###-#### Inspection requested via web by matt miller 110.26(C)(3)- Where equiptment rated 1200A or more that contain overcurrent devices personnel door shall have panic hardware.
|
Permanent Service | 1/29/2015 | 1/30/2015 | 1/30/2015 | A | NH |
Rock A. Hudson
|
|
|
Ras service Phone #: ###-#### Inspection requested via web by matt miller No return phone call. Not sure where service is located on premisis
|
Electrical Rough-In | 1/23/2015 | 1/26/2015 | 1/26/2015 | A | PART |
Rock A. Hudson
|
|
|
Wsr tank under ground Phone #: ###-#### Inspection requested via web by matt miller Under ground rough in ok as noted. Check grounding electode system and panic hardware on door of vault.
|
Electrical Rough-In | 1/14/2015 | 1/15/2015 | 1/15/2015 | A | PASS |
Rock A. Hudson
|
|
|
Underground Ras secondary, wall the bldg bathroom lids Phone #: ###-#### Inspection requested via web by matt miller RAS underground, Bathroom hardlids, and upstairs dividing wall rough in ok cover
|
Permanent Service | 12/30/2014 | 12/31/2014 | 12/31/2014 | A | PASS |
Rock A. Hudson
|
|
|
The best service Phone #: ###-#### Inspection requested via web by matt miller Performance test complete. p/s u/g n ok
|
Electrical Rough-In | 12/31/2014 | 12/31/2014 | 12/31/2014 | P | PASS |
Rock A. Hudson
|
|
|
The best service Phone #: ###-#### Inspection requested via web by matt miller WSR underground rough in ok cover
|
Electrical Rough-In | 12/16/2014 | 12/17/2014 | 12/17/2014 | A | PASS |
Rock A. Hudson
|
|
|
Entry bathroom walls Phone #: ###-#### Inspection requested via web by matt miller Rough in ok cover
|
Electrical Rough-In | 12/16/2014 | 12/16/2014 | 12/16/2014 | A | PASS |
Rock A. Hudson
|
|
|
Electrical room ceiling Phone #: ###-#### Inspection requested via web by matt miller Electrical room hard lid rough in ok cover
|
Electrical Rough-In | 12/4/2014 | 12/5/2014 | 12/5/2014 | A | PASS |
Rock A. Hudson
|
|
|
Transformer secondary underground Phone #: ###-#### Inspection requested via web by matt miller Secondaries south west corner rough in ok cover
|
Electrical Rough-In | 12/2/2014 | 12/2/2014 | 12/2/2014 | P | PASS |
Rock A. Hudson
|
|
|
Underground wsr tank and thk primarys Phone #: ###-#### Inspection requested via web by matt miller underground listed rough in ok cover
|
Electrical Rough-In | 10/28/2014 | 10/29/2014 | 10/29/2014 | A | PASS |
Rock A. Hudson
|
|
|
Bathroom underground Phone #: ###-#### Inspection requested via web by matt miller Bathroom and small pad N.E. corner underground rough in ok cover
|
Electrical Rough-In | 10/16/2014 | 10/17/2014 | 10/17/2014 | A | PASS |
Rock A. Hudson
|
|
|
Wall 14 Phone #: ###-#### Inspection requested via web by matt miller Wall 14 rough in ok cover
|
Electrical Rough-In | 10/2/2014 | 10/3/2014 | 10/3/2014 | A | PASS |
Daryl DeGrange
|
|
|
Under ground east side thickener building Phone #: ###-#### Inspection requested via web by matt miller Rough-in ok cover from building to vault
|
Electrical Rough-In | 9/27/2014 | 9/29/2014 | 9/29/2014 | A | PASS |
Daryl DeGrange
|
|
|
last wall on wsr tank Phone #: ###-#### Inspection requested via web by matt miller rough-in ok cover wall #8
|
Electrical Rough-In | 9/9/2014 | 9/10/2014 | 9/10/2014 | A | PASS |
Daryl DeGrange
|
|
|
wsr tank wall 7 Phone #: ###-#### Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 9/8/2014 | 9/9/2014 | 9/9/2014 | A | PASS |
Daryl DeGrange
|
|
|
wsr tank wall 6 Phone #: ###-#### Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 8/27/2014 | 8/27/2014 | 8/27/2014 | P | PASS |
Daryl DeGrange
|
|
|
WSR Tank Southeast and Northeast wall pours. Onsite - Joe Davis @ ###-#### Phone #: ###-#### Inspection requested via web by Todd Alder rough-in ok cover two conduits in those walls
|
Electrical Rough-In | 7/23/2014 | 7/23/2014 | 7/23/2014 | P | PASS |
Daryl DeGrange
|
|
|
pipe in boxes in wall 31 and 32 Phone #: ###-#### >> Inspection requested via web by matt miller Rough-in ok cover walls 31 and 32
|
Electrical Rough-In | 7/15/2014 | 7/16/2014 | 7/16/2014 | A | PASS |
Daryl DeGrange
|
|
|
two walls on upper deck Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover walls 24 and 28
|
Final | 7/9/2014 | 7/10/2014 | 7/10/2014 | A | PASS |
Daryl DeGrange
|
|
|
thickener tank slab southeast corner Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok pour
|
Electrical Rough-In | 7/2/2014 | 7/3/2014 | 7/3/2014 | A | PASS |
Daryl DeGrange
|
|
|
conduit in wall 29 Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 6/25/2014 | 6/26/2014 | 6/26/2014 | A | PASS |
Daryl DeGrange
|
|
|
pipe in wall 30 Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 6/23/2014 | 6/24/2014 | 6/24/2014 | A | PASS |
Rock A. Hudson
|
|
|
pipe and boxes in wall 27 Phone #: ###-#### >> Inspection requested via web by matt miller North 3rd of wall 27 pour rough in ok cover
|
Electrical Rough-In | 6/16/2014 | 6/16/2014 | 6/16/2014 | P | PASS |
Daryl DeGrange
|
|
|
wall 25 pipe and boxes Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 6/11/2014 | 6/11/2014 | 6/11/2014 | P | PASS |
Daryl DeGrange
|
|
|
wall 29 outlets and switches Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok pour
|
Electrical Rough-In | 5/28/2014 | 5/29/2014 | 5/29/2014 | A | PASS |
Daryl DeGrange
|
|
|
polymer room underground Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 5/19/2014 | 5/20/2014 | 5/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
thickener bldg. electrical room underground Phone #: ###-#### >> Inspection requested via web by matt miller Rough-in ok cover/pour underground electrical room
|
Electrical Rough-In | 4/7/2014 | 4/7/2014 | 4/7/2014 | P | PASS |
Daryl DeGrange
|
|
|
under ground pump room Phone #: ###-#### >> Inspection requested via web by matt miller Rough-in ok cover/pour
|
Electrical Rough-In | 4/3/2014 | 4/3/2014 | 4/3/2014 | A | PASS |
Rex Boyles
|
|
|
Electrical and polymer room walls
Phone #: ###-#### >> Inspection requested via web by matt miller rough in ok in electrical room and polymer room walls ok to pour
|
Electrical Rough-In | 3/27/2014 | 3/27/2014 | 3/27/2014 | P | PASS |
Daryl DeGrange
|
|
|
fermentation tank deck pour #2 Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 3/19/2014 | 3/20/2014 | 3/20/2014 | A | PASS |
Daryl DeGrange
|
|
|
duct bank to utilidor. Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover duct bank
|
Electrical Rough-In | 3/11/2014 | 3/12/2014 | 3/12/2014 | A | PASS |
Daryl DeGrange
|
|
|
wall 9 pipe and fermentation tank conduit in deck Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 3/6/2014 | 3/6/2014 | 3/6/2014 | P | PASS |
Daryl DeGrange
|
|
|
pipes and boxes and sleeves in wall 16 Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 2/27/2014 | 2/27/2014 | 2/27/2014 | P | CANC |
Daryl DeGrange
|
|
|
wall 12 conduit and box Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 2/20/2014 | 2/20/2014 | 2/20/2014 | P | PASS |
Daryl DeGrange
|
|
|
wall 20 outlets and blockouts Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Electrical Rough-In | 2/13/2014 | 2/13/2014 | 2/13/2014 | P | PASS |
Daryl DeGrange
|
|
|
duct bank from thickener bldg to transformer flt-tx-1 Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok cover
|
Final | 2/11/2014 | 2/12/2014 | 2/12/2014 | A | PASS |
Daryl DeGrange
|
|
|
wall 18 Phone #: ###-#### >> Inspection requested via web by matt miller rough-in ok pour wall #18
|
Electrical Rough-In | 2/11/2014 | 2/11/2014 | 2/11/2014 | P | PASS |
Daryl DeGrange
|
|
|
wall on north side with form on it Phone #: ###-#### >> Inspection requested via web by matt miller Rough-in ok cover north wall # 10
|
Electrical Rough-In | 1/28/2014 | 1/30/2014 | 1/30/2014 | P | PASS |
Daryl DeGrange
|
|
|
Cover inspection for next wall pour at new Thickener Building. Phone #: ###-#### >> Inspection requested via web by Todd Alder rough-in ok cover
|
Electrical Rough-In | 1/27/2014 | 1/27/2014 | 1/27/2014 | P | PASS |
Rock A. Hudson
|
|
|
Inspection of conduits in wall pour of new Thickener Building Phone #: ###-#### >> Inspection requested via web by Todd Alder Interior entry wall pour marked on contractors print rough in ok cover
|
Electrical Rough-In | 12/13/2013 | 12/16/2013 | 12/16/2013 | P | PASS |
Daryl DeGrange
|
|
|
Inspection of underground conduits. Matt Miller is onsite superintendent. Phone #: ###-#### >> Inspection requested via web by Todd Alder rough-in ok cover underground electrical room under footings
|
Electrical Rough-In | 11/19/2013 | 11/20/2013 | 11/20/2013 | A | PASS |
Daryl DeGrange
|
|
|
Ufer ground inspection Phone #: ###-#### >> Inspection requested via web by Neil Adams rough-in ok cover Ufer grounding conductor
|
Electrical Rough-In | 11/6/2013 | 11/7/2013 | 11/7/2013 | A | PASS |
Rock A. Hudson
|
|
|
underground inspection needed under new building on south west corner of WWTP Phone #: ###-#### >> Inspection requested via web by Neil Adams 5" conduits as marked in office rough in ok cover
|