Final | 7/30/2014 | 8/1/2014 | 8/1/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ran a dedicated 20 amp 120 volt circuit for the existing ceiling heater in the bathroom. Phone #: ###-#### Inspection requested via web by Dan Mitchell final ok
|
Electrical Rough-In | 7/30/2014 | 8/1/2014 | 8/1/2014 | A | PASS |
Daryl DeGrange
|
|
|
Ran a dedicated 20 amp 120 volt circuit for the existing ceiling heater in the bathroom. Phone #: ###-#### Inspection requested via web by Dan Mitchell rough-in ok
|