Information based on query as of Tuesday, July 16, 2024.
Permit Information
Permit NumberELE14-02684
StatusFinaled
Name POWERHOUSE ELECTRIC
Site Address 6258 E PLAYWRIGHT ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Electrical Permit - New: new home
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final11/21/201411/21/201411/21/2014APASS
DetailsBob Reichert
Phone #: ###-#### Inspection requested via web by Darryn Coburn ok final
Rough-In Permanent Service9/29/20149/29/20149/29/2014PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Darryn Coburn Rough in ok cover p/s u/g n ok
Rough-In Permanent Service9/26/20149/26/20149/26/2014PFAIL
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Darryn Coburn
110.12(A) Unused Openings. Unused openings, other than those
intended for the operation of equipment, those intended for
mounting purposes, or those permitted as part of the design
for listed equipment, shall be closed to afford protection
substantially equivalent to the wall of the equipment.
Where metallic plugs or plates are used with nonmetallic
enclosures, they shall be recessed at least 6 mm (1/4 in.)
from the outer surface of the enclosure.
250.28 Main Bonding Jumper and System Bonding
Jumper. For a grounded system, main bonding jumpers
and system bonding jumpers shall be installed as follows:
(A) Material. Main bonding jumpers and system bonding
jumpers shall be of copper or other corrosion-resistant material.
A main bonding jumper and a system bonding jumper
shall be a wire, bus, screw, or similar suitable conductor. Screw missing.
590.6(B)- Dryer temp receptical shall have GFCI protection.