Permit Information
Permit NumberELE14-03447
StatusFinaled
Name KUBIK ELECTRIC
Site Address 1607 N 6TH ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Electrical Permit - New: wire new house - rough in
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/25/20153/26/20153/26/2015PPASS
DetailsDaryl DeGrange
Any questions please call Darrel Kubik ###-#### Phone #: ###-#### Inspection requested via web by Charmel Kubik final ok
Electrical Rough-In2/17/20152/18/20152/18/2015APASS
DetailsCevyn Recla
Rough in inspection for floor heat - You can call Darrel Kubik @ ###-#### Phone #: ###-#### Inspection requested via web by Charmel Kubik
Floor heat cable, upstairs master bath OK to cover
Rough-In Permanent Service12/17/201412/17/201412/17/2014APASS
DetailsCevyn Recla
Please call Darrel Kubik ###-#### - the contractor scheduled to have the cement delivered this morning at 10:00 am and would like to have the inspection done before it arrives.
Thank you Phone #: ###-#### Inspection requested via web by Charmel Kubik
Corrections made, RI OK
poured ground wire in concrete, ok to cover,
PS, UG, N, OK
Electrical Rough-In12/16/201412/17/201412/17/2014ACANC
DetailsCevyn Recla
Please call Darrel Kubik ###-####(ASAP). The contractor has scheduled to have the concrete poured at 10:00am and the inspection will need to be done before the concrete is poured.. Thank you Phone #: ###-####
Inspection requested via web by Charmel Kubik
Called for 2 inspections, cancelled this one, see rough in permanent service
Electrical Rough-In12/15/201412/16/201412/16/2014AFAIL
DetailsCevyn Recla
Any questions, please call Darrel Kubik ###-#### Phone #: ###-#### Inspection requested via web by Charmel Kubik
Phone number listed is non-working
300.4A1 Nm through bored holes shall have protection where edge of hole is less than 1 1/4 inch from edge of framing member

BCC all work shall be finished and ready for inspection, wire and box hanging directly from ceilning and not made up