Final | 6/22/2015 | 6/23/2015 | 6/23/2015 | A | PASS |
Rex Boyles
|
|
|
call ###-#### before going to site to unlock the room or call me ###-#### Phone #: ###-#### Inspection requested via web by Karl Paige corrections made final ok
|
Final | 6/16/2015 | 6/16/2015 | 6/16/2015 | P | FAIL |
Daryl DeGrange
|
|
|
Phone #: ###-#### Inspection requested via web by Karl Paige Not all luminaires have support wires at opposing corners. NEC 300.11 Fixture whips shall be supported off ceiling grid. NEC 348.30 FMC metal raceways shall be supported NE 800.25 Shall remove all abandoned cables and conduit
|
Electrical Rough-In | 5/27/2015 | 5/27/2015 | 5/27/2015 | P | PASS |
Daryl DeGrange
|
|
|
project located on 9th floor south out of elevator take a left to the east at the end of hallway turn north through door room on your right Phone #: ###-#### Inspection requested via web by Karl Paige rough-in ok cover walls
|