Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE15-03769
StatusFinaled
Name PRIMARY ELECTRIC
Site Address 1716 N ALLUMBAUGH ST
Project Name 
Customer Number8942
ePlanReviewNo
Description
Alteration: Service Change; Add circuit for AC. Run a sub feed for a new sub panel in house. Meter main with breaker space on the outside. Run a circuit for a future hot tub.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/25/20164/26/20164/26/2016APASS
DetailsRock A. Hudson
Please call Todd Sellman prior to inspection Phone #: ###-#### Inspection requested via web by Todd Sellman Final ok
Final12/8/201512/9/201512/9/2015AFAIL
DetailsRex Boyles
Phone #: ###-#### Inspection requested via web by Todd Sellman as per manufacturer- 50 amp maximum on top position of all in one. Relocate 80 amp breaker and turn on 200 amp main. 250 .94- intersystem bus bar required
Rough-In Permanent Service12/7/201512/8/201512/8/2015APASS
DetailsRock A. Hudson
Tim Phone #: ###-#### Service change ready at time of inspection. #2 SER shall be fused down to 80 amp as per 310.15(B)(7). p/s o/h rec ok