Permit Information
Permit NumberELE16-00203
StatusFinaled
Name MOUNTAIN POWER ELECT
Site Address 2910 E AMITY RD
Project Name 
Customer Number16-003
ePlanReviewNo
Description
New: Phase I -
Provide wiring to new dock doors & levelers.
relocate existing high bay lighting. wiring for new fire pump and relocate parking lot lighting.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final4/6/20164/6/20164/6/2016PPASS
DetailsBob Reichert
Jose Phone #: ###-#### ok final, signed card
Final3/15/20163/15/20163/15/2016PPART
DetailsBob Reichert
Jose Phone #: ###-#### shall move east dock leveler panel for clearance per NEC 110.26, rest ok, will recall later, no card to sign
Electrical Rough-In3/2/20163/3/20163/3/2016ACANC
DetailsRock A. Hudson
Jose Phone #: ###-####
Needed conference
Conference3/3/20163/3/20163/3/2016PDONE
DetailsRock A. Hudson
Jose Phone #: ###-####
Discussed required grounding electrode system for new fire pump service. They poured and concrete encased in floor of new fire pump room. Shall use all available grounding electrodes. Fire pump underground metal piping system, concrete encased, contractor to ensure main service grounding electrode system bonds to fire sprinkler piping system to tie all together.
Electrical Rough-In2/22/20162/23/20162/23/2016PPASS
DetailsBob Reichert
Jose Phone #: ###-#### ok cover fire pump room
Electrical Rough-In2/4/20162/5/20162/5/2016APASS
DetailsBob Reichert
Underground r/i, please call ahead for access - Jose Phone #: ###-#### south side u/g for fire pump ok from west side to dock area east side ok cover
Electrical Rough-In1/25/20161/25/20161/25/2016PPASS
DetailsRock A. Hudson
underground // Jose Phone #: ###-####
Discussed the route for service entrance conductors for fire pump. Due to route outside of building will set a traffic rated concrete pull box in ground about center of south side near walkway. Conductors to be over sized for voltage drop. Path across ramp to be encased in concrete for traffic on ramp. Underground from south east corner to mid way on ramp only rough in ok cover