Final | 5/2/2016 | 5/3/2016 | 5/3/2016 | A | PASS |
Rex Boyles
|
|
|
Contact: Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden final ok
|
Permanent Service | 5/3/2016 | 5/3/2016 | 5/3/2016 | P | PASS |
Rex Boyles
|
|
|
Contact: Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden p/s u/g n ok existing service, add 1 phase meter to 3 phase system. available fault current for existing service exceeds AIC rating.
|
Final | 4/29/2016 | 4/29/2016 | 4/29/2016 | P | CANC |
Rex Boyles
|
|
|
Contact: Derrick Kamper Phone #: ###-#### >> Inspection requested via web by Deb Gooden Inspection cancelled from web by: Deb Gooden
|
Final | 4/12/2016 | 4/13/2016 | 4/13/2016 | A | CANC |
Rex Boyles
|
|
|
final for permanent service. Your contact name will be Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden needed r/i p/s
|
Electrical Rough-In | 4/13/2016 | 4/13/2016 | 4/13/2016 | P | PASS |
Rex Boyles
|
|
|
final for permanent service. Your contact name will be Derrick Kamper Phone #: ###-#### Inspection requested via web by Deb Gooden new 100amp service ,feeder and loadcenter ok NOTE:need available fault current label on new main disconnect as per NEC 110.24 and re label all services with addresses service 1 of 5,service 2 of 5 and so on for fire dept. prior to energizing new service.
|