Final | 3/16/2018 | 3/16/2018 | 3/16/2018 | P | PASS |
Eric Story
|
|
|
Final sign off Correction fixed, both cards have been signed and finaled electric permit
|
Final | 3/14/2018 | 3/15/2018 | 3/15/2018 | A | FAIL |
Eric Story
|
|
|
Kenny is the site contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker AFCI protection for guest bedroom
|
Final | 12/29/2017 | 12/29/2017 | 12/29/2017 | P | PART |
Eric Story
|
|
|
We need final inspections for the following units: 208, 301, 304. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Rooms as noted on request ok to occupy
|
Final | 12/7/2017 | 12/7/2017 | 12/7/2017 | P | PART |
Eric Story
|
|
|
We need a final for Units 303, 101, 102, 107,201, 202, 207,. Kenny is the site contact Phone #: ###-#### Inspection requested via web by Stacie Tasker temp occ for rooms as needed in inspection request temp occ ok
|
Final | 10/24/2017 | 10/25/2017 | 10/25/2017 | A | PART |
Eric Story
|
|
|
Core and shll temp occ inspection Core and shell temp occ ok Signed all necessary cards for this inspection
|
Final | 10/19/2017 | 10/20/2017 | 10/20/2017 | P | CANC |
Eric Story
|
|
|
We need a temp occupancy final on the core ; shell. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Core and shell not ready
|
Final | 10/16/2017 | 10/17/2017 | 10/17/2017 | A | PART |
Eric Story
|
|
|
PArtial final for north units North corridors and unit 302,203,206,205,204,106,105,104,103 in north end onlyok to occupy. South end to be inspected on another date...
|
Final | 10/13/2017 | 10/16/2017 | 10/16/2017 | P | FAIL |
Eric Story
|
|
|
We need a final for All corridors and the Units on the North Side. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker GFCI protection with receptacles within 6' of a sink misc areas Lockouts for hard wired applainces misc thru out
|
Electrical Rough-In | 10/10/2017 | 10/11/2017 | 10/11/2017 | A | PASS |
Rock A. Hudson
|
|
|
We need a ceiling cover for the entire 3rd floor. Phone #: ###-#### Inspection requested via web by Stacie Tasker Area noted grid rough in ok cover
|
Electrical Rough-In | 10/10/2017 | 10/10/2017 | 10/10/2017 | P | PASS |
Rock A. Hudson
|
|
|
We need an fire alarm inspection for the electrical part of the fire alarm. On site Contact is Greg. Phone #: ###-#### Inspection requested via web by Stacie Tasker Area noted rough in ok
|
Electrical Rough-In | 10/6/2017 | 10/6/2017 | 10/6/2017 | P | PASS |
Eric Story
|
|
|
Ceiling cover for 2nd floor corridor. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 2nd floor corridor drop ceilings ok to cover
|
Electrical Rough-In | 10/3/2017 | 10/4/2017 | 10/4/2017 | P | PASS |
Eric Story
|
|
|
We need a ceiling cover for 1st floor corridor. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 1st floor corridor ok to cover
|
Electrical Rough-In | 7/27/2017 | 7/28/2017 | 7/28/2017 | A | PASS |
Eric Story
|
|
|
Inspect floor heat in master bath Master bath floor heat ok cover
|
Electrical Rough-In | 7/26/2017 | 7/27/2017 | 7/27/2017 | P | PASS |
Eric Story
|
|
|
We need an inspection in Unit #302 for floor heat. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Main bath only ok cover, will look at master on another date...
|
Electrical Rough-In | 7/12/2017 | 7/13/2017 | 7/13/2017 | P | PASS |
Eric Story
|
|
|
We need a softitt inspection for 1st floor corridor. Phone #: ###-#### Inspection requested via web by Stacie Tasker 1st floor corridor hard lids ok cover
|
Electrical Rough-In | 6/26/2017 | 6/27/2017 | 6/27/2017 | A | PASS |
Eric Story
|
|
|
We need a inspection for 2nd floor corridor. Thank you Phone #: ###-#### Inspection requested via web by Stacie Tasker 2nd floor corridor hard lid soffits ok cover
|
Permanent Service | 5/31/2017 | 6/1/2017 | 6/1/2017 | A | PASS |
Eric Story
|
|
|
Kenny is site contact. We need service inspection for the following units: 103, 104, 105, 106, 203, 204, 205, 206 Phone #: ###-#### Inspection requested via web by Stacie Tasker Service ok to energize, p/s u/g rec ok 19 meters needed
|
Electrical Rough-In | 5/11/2017 | 5/12/2017 | 5/12/2017 | A | PASS |
Eric Story
|
|
|
We need a 3rd floor corridor soffit, please! Phone #: ###-#### Inspection requested via web by Stacie Tasker 3rd floor soffits in hallways and lobby ok cover
|
Electrical Rough-In | 4/13/2017 | 4/13/2017 | 4/13/2017 | P | PASS |
Eric Story
|
|
|
We need a soffit inspection for Units 101 ; 107.Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker units 101,107 soffits ok cover
|
Electrical Rough-In | 4/5/2017 | 4/5/2017 | 4/5/2017 | P | PASS |
Eric Story
|
|
|
We need a soffit inspection for Units 304 ; 201. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Soffits in units 201,and 304 only ok cover
|
Electrical Rough-In | 3/30/2017 | 3/30/2017 | 3/30/2017 | P | PASS |
Eric Story
|
|
|
We need a soffit inspection for Units 301 ;208. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker units 301,208 siffits ok cover
|
Electrical Rough-In | 3/21/2017 | 3/21/2017 | 3/21/2017 | P | PASS |
Eric Story
|
|
|
we need a inspection for the 2nd floor utility closet and stairwell. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 2nd foor closet/storage and south stair ok cover
|
Electrical Rough-In | 3/17/2017 | 3/17/2017 | 3/17/2017 | P | PASS |
Eric Story
|
|
|
We need a soffit inspection for Units 202 ; 207, please. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Units as requested hard lids ok cover
|
Electrical Rough-In | 3/9/2017 | 3/10/2017 | 3/10/2017 | P | PASS |
Eric Story
|
|
|
We need a soffit inspection. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Unit 301 hard lid ok cover
|
Electrical Rough-In | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | PASS |
Eric Story
|
|
|
Corridor inspection Unit 302 hard lids and elevator corridor hard lid ok cover
|
Electrical Rough-In | 3/6/2017 | 3/6/2017 | 3/6/2017 | P | CANC |
Eric Story
|
|
|
We need an inspection for 3rd floor corridor and Unit 302 soffit. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker cancelling for tuesday
|
Electrical Rough-In | 3/6/2017 | 3/7/2017 | 3/6/2017 | A | CANC |
Eric Story
|
|
|
We need an inspection for 3rd floor corridor and Unit 302 soffit. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Kenny ###-#### early morning if possible
|
Electrical Rough-In | 3/1/2017 | 3/1/2017 | 3/1/2017 | P | PASS |
Rock A. Hudson
|
|
|
We need a wall cover on 1st ; 2nd floor corridor and a soffit inspection for Unit 102. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Area noted rough in ok cover
|
Electrical Rough-In | 2/17/2017 | 2/21/2017 | 2/21/2017 | A | PASS |
Eric Story
|
|
|
We need a soffit inspection for Units 203 ; 206. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Units as requested soffits ok cover
|
Electrical Rough-In | 2/15/2017 | 2/15/2017 | 2/15/2017 | P | PASS |
Rock A. Hudson
|
|
|
We need a soffit inspection for Unit 204. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Area noted 204 soffits rough in ok cover
|
Electrical Rough-In | 1/25/2017 | 1/26/2017 | 1/26/2017 | A | PASS |
Eric Story
|
|
|
We need a soffit inspection for Unit 103. Contact is Kenny. Phone #: ###-#### Inspection requested via web by Stacie Tasker Unit 103 soffits only ok cover
|
Electrical Rough-In | 1/20/2017 | 1/20/2017 | 1/20/2017 | P | PASS |
Eric Story
|
|
|
We need a rough for the following units, 105, 107, 301. Site contact is Kenny Long. Phone #: ###-#### Inspection requested via web by Stacie Tasker unit 105 hard lid @ units 101, 107 rough-in ok cover
|
Electrical Rough-In | 1/11/2017 | 1/11/2017 | 1/11/2017 | A | PASS |
Eric Story
|
|
|
We need soffits inspection for Units 104 ; 105 and s wall ; partial ceiling for Unit 304. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker unit304 ok cover units 101,104 and 106 hard lids ok cover
|
Electrical Rough-In | 1/3/2017 | 1/3/2017 | 1/3/2017 | P | PASS |
Eric Story
|
|
|
We need a wall inspection for the following units: 101, 102, guest suite, ; 303. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Units as requested on inspection walls and hard lids ok cover
|
Electrical Rough-In | 12/22/2016 | 12/22/2016 | 12/22/2016 | P | PASS |
James Ady
|
|
|
We need a wall rough for all of the 2nd floor on the South Side units. Kenny is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 2nd floor Apartments South side only rough in ok
|
Final | 12/1/2016 | 12/2/2016 | 12/2/2016 | A | CANC |
Eric Story
|
|
|
Unit 302 walls only Needed rough-in
|
Electrical Rough-In | 12/2/2016 | 12/2/2016 | 12/2/2016 | P | PASS |
Eric Story
|
|
|
Unit 302 walls only Unit 302 walls and hard lids ok cover
|
Electrical Rough-In | 12/1/2016 | 12/1/2016 | 12/1/2016 | A | CANC |
Eric Story
|
|
|
Unit 302 walls only Scheduled wrong day
|
Electrical Rough-In | 12/1/2016 | 12/2/2016 | 12/1/2016 | A | CANC |
Eric Story
|
|
|
Unit 302 walls only
|
Electrical Rough-In | 12/1/2016 | 12/1/2016 | 12/1/2016 | P | NR |
Eric Story
|
|
|
WE need a wall rough for Unit 302 only. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Scheduled for wrong day, will create inspection for 12-2-2016
|
Electrical Rough-In | 11/18/2016 | 11/18/2016 | 11/18/2016 | P | PASS |
Eric Story
|
|
|
We need a partial wall cover for all 3 floors on the north side. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker North rooms on floors 1st and 2nd floor panel walls only ok cover
|
Electrical Rough-In | 11/9/2016 | 11/10/2016 | 11/10/2016 | P | PASS |
Eric Story
|
|
|
We need a ceiling inspection for the North side 1st ; 2nd floor. Kenny is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker rooms 130,106,203,206 walls and ceilings ok cover. Rooms inspected on the 11/9/16 ceilings ok cover
|
Electrical Rough-In | 11/8/2016 | 11/9/2016 | 11/9/2016 | P | PASS |
Eric Story
|
|
|
We need a partial wall rough for North side for 1st, 2nd ; 3rd floors. Site contact is Kenny. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 1st and 2nd floor north rooms walls only ok cover
|
Electrical Rough-In | 9/27/2016 | 9/27/2016 | 9/27/2016 | P | PASS |
Daryl DeGrange
|
|
|
We need a ceiling inspection for the South Corridor. Site contact is Kenny. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker rough-in ok cover hard lid South Corridor ceiling
|
Electrical Rough-In | 9/20/2016 | 9/21/2016 | 9/21/2016 | P | PASS |
Eric Story
|
|
|
We need a partial ceiling inspection for the North Half, 1st, 2nd, ; 3rd floor. Site contact is Kenny, ###-#### Phone #: ###-#### Inspection requested via web by Stacie Tasker 1st 2nd 3rd floor north side corridor hard lids only ok cover
|
Electrical Rough-In | 9/20/2016 | 9/20/2016 | 9/20/2016 | P | CANC |
Eric Story
|
|
|
We need a partial ceiling on the 1st, 2nd, 3rd floor at the North Half. Site contact is Kenny, ###-####. Thank you! Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Inspection cancelled from web by: Stacie Tasker
|
Conference | 6/13/2016 | 6/14/2016 | 6/14/2016 | P | DONE |
Rock A. Hudson
|
|
|
Please contact Greg 30 min prior to arrival. This is for a consultation. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker Discussed the ampacity of feeders from basement to each unit. Quoted NEC 310.15(A)(2)exeption, if less than 10' or 10% of circuit length is enclosed by thermal insulation adjustment factor of using 60 degree column shall not apply. General contractor to assist with uninsulated path to help with costs of wiring.
|