Information based on query as of Thursday, July 4, 2024.
Permit Information
Permit NumberELE16-01483
StatusFinaled
Name TASKER ELECTRICAL CONSTRUCTION INC
Site Address 2967 W CRESCENT RIM DR
Project NameCRESCENT RIM BUILDING # 4
Customer Number 
ePlanReviewNo
Description
Addition: feeders and branch circuits for 19 condos and fire alarm system.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/16/20183/16/20183/16/2018PPASS
DetailsEric Story
Final sign off
Correction fixed, both cards have been signed and finaled electric permit
Final3/14/20183/15/20183/15/2018AFAIL
DetailsEric Story
Kenny is the site contact. Phone #: ###-#### Inspection requested via web by Stacie Tasker
AFCI protection for guest bedroom
Final12/29/201712/29/201712/29/2017PPART
DetailsEric Story
We need final inspections for the following units: 208, 301, 304.
Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Rooms as noted on request ok to occupy
Final12/7/201712/7/201712/7/2017PPART
DetailsEric Story
We need a final for Units 303, 101, 102, 107,201, 202, 207,. Kenny is the site contact Phone #: ###-#### Inspection requested via web by Stacie Tasker
temp occ for rooms as needed in inspection request temp occ ok
Final10/24/201710/25/201710/25/2017APART
DetailsEric Story
Core and shll temp occ inspection
Core and shell temp occ ok
Signed all necessary cards for this inspection
Final10/19/201710/20/201710/20/2017PCANC
DetailsEric Story
We need a temp occupancy final on the core ; shell. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Core and shell not ready
Final10/16/201710/17/201710/17/2017APART
DetailsEric Story
PArtial final for north units
North corridors and unit 302,203,206,205,204,106,105,104,103 in north end onlyok to occupy. South end to be inspected on another date...
Final10/13/201710/16/201710/16/2017PFAIL
DetailsEric Story
We need a final for All corridors and the Units on the North Side.
Thank you!
Phone #: ###-#### Inspection requested via web by Stacie Tasker
GFCI protection with receptacles within 6' of a sink misc areas
Lockouts for hard wired applainces misc thru out
Electrical Rough-In10/10/201710/11/201710/11/2017APASS
DetailsRock A. Hudson
We need a ceiling cover for the entire 3rd floor. Phone #: ###-#### Inspection requested via web by Stacie Tasker
Area noted grid rough in ok cover
Electrical Rough-In10/10/201710/10/201710/10/2017PPASS
DetailsRock A. Hudson
We need an fire alarm inspection for the electrical part of the fire alarm. On site Contact is Greg. Phone #: ###-#### Inspection requested via web by Stacie Tasker
Area noted rough in ok
Electrical Rough-In10/6/201710/6/201710/6/2017PPASS
DetailsEric Story
Ceiling cover for 2nd floor corridor. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
2nd floor corridor drop ceilings ok to cover
Electrical Rough-In10/3/201710/4/201710/4/2017PPASS
DetailsEric Story
We need a ceiling cover for 1st floor corridor. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
1st floor corridor ok to cover
Electrical Rough-In7/27/20177/28/20177/28/2017APASS
DetailsEric Story
Inspect floor heat in master bath
Master bath floor heat ok cover
Electrical Rough-In7/26/20177/27/20177/27/2017PPASS
DetailsEric Story
We need an inspection in Unit #302 for floor heat. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Main bath only ok cover, will look at master on another date...
Electrical Rough-In7/12/20177/13/20177/13/2017PPASS
DetailsEric Story
We need a softitt inspection for 1st floor corridor. Phone #: ###-#### Inspection requested via web by Stacie Tasker
1st floor corridor hard lids ok cover
Electrical Rough-In6/26/20176/27/20176/27/2017APASS
DetailsEric Story
We need a inspection for 2nd floor corridor. Thank you Phone #: ###-#### Inspection requested via web by Stacie Tasker
2nd floor corridor hard lid soffits ok cover
Permanent Service5/31/20176/1/20176/1/2017APASS
DetailsEric Story
Kenny is site contact. We need service inspection for the following units:
103, 104, 105, 106, 203, 204, 205, 206 Phone #: ###-#### Inspection requested via web by Stacie Tasker
Service ok to energize, p/s u/g rec ok 19 meters needed
Electrical Rough-In5/11/20175/12/20175/12/2017APASS
DetailsEric Story
We need a 3rd floor corridor soffit, please! Phone #: ###-#### Inspection requested via web by Stacie Tasker
3rd floor soffits in hallways and lobby ok cover
Electrical Rough-In4/13/20174/13/20174/13/2017PPASS
DetailsEric Story
We need a soffit inspection for Units 101 ; 107.Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
units 101,107 soffits ok cover
Electrical Rough-In4/5/20174/5/20174/5/2017PPASS
DetailsEric Story
We need a soffit inspection for Units 304 ; 201. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Soffits in units 201,and 304 only ok cover
Electrical Rough-In3/30/20173/30/20173/30/2017PPASS
DetailsEric Story
We need a soffit inspection for Units 301 ;208. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
units 301,208 siffits ok cover
Electrical Rough-In3/21/20173/21/20173/21/2017PPASS
DetailsEric Story
we need a inspection for the 2nd floor utility closet and stairwell. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
2nd foor closet/storage and south stair ok cover
Electrical Rough-In3/17/20173/17/20173/17/2017PPASS
DetailsEric Story
We need a soffit inspection for Units 202 ; 207, please.
Thank you! Phone #: ###-#### Inspection requested via web by Stacie Units as requested hard lids ok cover
Electrical Rough-In3/9/20173/10/20173/10/2017PPASS
DetailsEric Story
We need a soffit inspection. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Unit 301 hard lid ok cover
Electrical Rough-In3/6/20173/7/20173/7/2017APASS
DetailsEric Story
Corridor inspection
Unit 302 hard lids and elevator corridor hard lid ok cover
Electrical Rough-In3/6/20173/6/20173/6/2017PCANC
DetailsEric Story
We need an inspection for 3rd floor corridor and Unit 302 soffit. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
cancelling for tuesday
Electrical Rough-In3/6/20173/7/20173/6/2017ACANC
DetailsEric Story
We need an inspection for 3rd floor corridor and Unit 302 soffit. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Kenny ###-#### early morning if possible
Electrical Rough-In3/1/20173/1/20173/1/2017PPASS
DetailsRock A. Hudson
We need a wall cover on 1st ; 2nd floor corridor and a soffit inspection for Unit 102. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Area noted rough in ok cover
Electrical Rough-In2/17/20172/21/20172/21/2017APASS
DetailsEric Story
We need a soffit inspection for Units 203 ; 206. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Units as requested soffits ok cover
Electrical Rough-In2/15/20172/15/20172/15/2017PPASS
DetailsRock A. Hudson
We need a soffit inspection for Unit 204. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Area noted 204 soffits rough in ok cover
Electrical Rough-In1/25/20171/26/20171/26/2017APASS
DetailsEric Story
We need a soffit inspection for Unit 103. Contact is Kenny. Phone #: ###-#### Inspection requested via web by Stacie Tasker
Unit 103 soffits only ok cover
Electrical Rough-In1/20/20171/20/20171/20/2017PPASS
DetailsEric Story
We need a rough for the following units, 105, 107, 301. Site contact is Kenny Long. Phone #: ###-#### Inspection requested via web by Stacie Tasker
unit 105 hard lid @ units 101, 107 rough-in ok cover
Electrical Rough-In1/11/20171/11/20171/11/2017APASS
DetailsEric Story
We need soffits inspection for Units 104 ; 105 and s wall ; partial ceiling for Unit 304. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
unit304 ok cover units 101,104 and 106 hard lids ok cover
Electrical Rough-In1/3/20171/3/20171/3/2017PPASS
DetailsEric Story
We need a wall inspection for the following units: 101, 102, guest suite, ; 303. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Units as requested on inspection walls and hard lids ok cover
Electrical Rough-In12/22/201612/22/201612/22/2016PPASS
DetailsJames Ady
We need a wall rough for all of the 2nd floor on the South Side units. Kenny is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker 2nd floor Apartments South side only rough in ok
Final12/1/201612/2/201612/2/2016ACANC
DetailsEric Story
Unit 302 walls only
Needed rough-in
Electrical Rough-In12/2/201612/2/201612/2/2016PPASS
DetailsEric Story
Unit 302 walls only
Unit 302 walls and hard lids ok cover
Electrical Rough-In12/1/201612/1/201612/1/2016ACANC
DetailsEric Story
Unit 302 walls only
Scheduled wrong day
Electrical Rough-In12/1/201612/2/201612/1/2016ACANC
DetailsEric Story
Unit 302 walls only
Electrical Rough-In12/1/201612/1/201612/1/2016PNR
DetailsEric Story
WE need a wall rough for Unit 302 only. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Scheduled for wrong day, will create inspection for 12-2-2016
Electrical Rough-In11/18/201611/18/201611/18/2016PPASS
DetailsEric Story
We need a partial wall cover for all 3 floors on the north side. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
North rooms on floors 1st and 2nd floor panel walls only ok cover
Electrical Rough-In11/9/201611/10/201611/10/2016PPASS
DetailsEric Story
We need a ceiling inspection for the North side 1st ; 2nd floor. Kenny is the site contact. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
rooms 130,106,203,206 walls and ceilings ok cover. Rooms inspected on the 11/9/16 ceilings ok cover
Electrical Rough-In11/8/201611/9/201611/9/2016PPASS
DetailsEric Story
We need a partial wall rough for North side for 1st, 2nd ; 3rd floors. Site contact is Kenny. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
1st and 2nd floor north rooms walls only ok cover
Electrical Rough-In9/27/20169/27/20169/27/2016PPASS
DetailsDaryl DeGrange
We need a ceiling inspection for the South Corridor. Site contact is Kenny.
Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker rough-in ok cover hard lid South Corridor ceiling
Electrical Rough-In9/20/20169/21/20169/21/2016PPASS
DetailsEric Story
We need a partial ceiling inspection for the North Half, 1st, 2nd, ; 3rd floor. Site contact is Kenny, ###-#### Phone #: ###-#### Inspection requested via web by Stacie Tasker
1st 2nd 3rd floor north side corridor hard lids only ok cover
Electrical Rough-In9/20/20169/20/20169/20/2016PCANC
DetailsEric Story
We need a partial ceiling on the 1st, 2nd, 3rd floor at the North Half. Site contact is Kenny, ###-####. Thank you! Phone #: ###-#### >> Inspection requested via web by Stacie Tasker Inspection cancelled from web by: Stacie Tasker
Conference6/13/20166/14/20166/14/2016PDONE
DetailsRock A. Hudson
Please contact Greg 30 min prior to arrival. This is for a consultation. Thank you! Phone #: ###-#### Inspection requested via web by Stacie Tasker
Discussed the ampacity of feeders from basement to each unit. Quoted NEC 310.15(A)(2)exeption, if less than 10' or 10% of circuit length is enclosed by thermal insulation adjustment factor of using 60 degree column shall not apply. General contractor to assist with uninsulated path to help with costs of wiring.