Information based on query as of Wednesday, July 17, 2024.
Permit Information
Permit NumberELE16-01965
StatusExpired
Name MARCO LOPEZ
Site Address 606 E LOGAN ST
Project Name 
Customer Number 
ePlanReviewNo
Description
Electrical permit to relocate existing outlets and lighting. Also adding radiant floor heating.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
DOC - Permit Expired2/14/20192/14/20192/14/2019APASS
DetailsDaryl DeGrange
No activity within 180 days. This permit is EXPIRED. A new permit is required to complete this job.
Extend Permit 180 days 6/27/20186/27/2018 DONE
DetailsAdele J Schaffeld-Griffin
ELE-Request for Extension12/15/201712/15/201712/15/2017ADONE
DetailsAdele J Schaffeld-Griffin
permit extension granted per applicant request 180 days
Extend Permit 180 days 12/15/201712/15/2017 DONE
DetailsAdele J Schaffeld-Griffin
permit extention granted 180 days
Electrical Rough-In7/28/20177/28/20177/28/2017PPASS
DetailsRock A. Hudson
Marco-radiant floors Phone #: ###-####-please call when your on your way
Listing and class A GFCI protection at thermostat confirmed. Rough in ok cover
Extend Permit 180 days 6/19/20176/19/2017 DONE
DetailsJason Blais
ELE-Aging Inspection11/23/201611/25/201611/25/2016ADONE
DetailsMark Moncarr
Marco Phone #: ###-#### Partial sheetrock cover
Electrical Rough-In9/23/20169/23/20169/23/2016PPASS
DetailsMark Moncarr
Marco Phone #: ###-#### ok cover
Electrical Rough-In9/20/20169/20/20169/20/2016PFAIL
DetailsMark Moncarr
would like call ahead; Marco Phone #: ###-#### boxes need changed out due to box fill, need connectors for wires entering cans, wires need stapled every 4-1/2', boxes need made up to ensure ground wire connection
Electrical Rough-In9/19/20169/19/20169/19/2016PNH
DetailsMark Moncarr
Marco Phone #: ###-####
Conference8/8/20168/8/20168/8/2016PDONE
DetailsJames Ady
call Marco 1/2 hour prior to going out. Phone #: ###-#### Talked about 6 and 12 rule for outlet spaceing, need for GFCI protection in bathroom AFCI Prtection in bedroom, GFCI protection on floor heat, Tamper resistant receps, and inspection on floor heat before covering