Final | 3/9/2017 | 3/10/2017 | 3/10/2017 | A | PASS |
Mark Moncarr
|
|
|
Please call 20 min before arrival. Thanks Phone #: ###-#### Inspection requested via web by Kevin Burke Ok final
|
Electrical Rough-In | 11/23/2016 | 11/23/2016 | 11/23/2016 | A | FAIL |
Mark Moncarr
|
|
|
Phone #: ###-#### Inspection requested via web by Kevin Burke Ok to cover roughed in rooms. Disconnect is needed outside under meter location for the panel inside. 230.70, also Boise City Ordinance 4-05-31(C) unfused conductors entering structure cannot be longer than 4'. Re-establish grounding at disconnect, and seperate grounds and neutrals in house panel along with pulling bond screw.
|