Electrical Rough-In | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Eric Story
|
|
|
Solar array inspection Scope of work and materials all listed
|
Final | 3/7/2017 | 3/7/2017 | 3/7/2017 | P | PASS |
Eric Story
|
|
|
Solar array inspection Solar array final ok
|
Electrical Rough-In | 3/6/2017 | 3/7/2017 | 3/7/2017 | A | CANC |
Eric Story
|
|
|
Rough-in for solar install No one on site reschedule for pm
|
Final | 2/28/2017 | 3/6/2017 | 3/6/2017 | P | CANC |
Eric Story
|
|
|
Jen-ext 123 Phone #: ###-#### Need inspection for 3/7/17...
|
Electrical Rough-In | 3/6/2017 | 3/7/2017 | 3/6/2017 | A | CANC |
Eric Story
|
|
|
Jen-ext 123 Phone #: ###-####
|