Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberELE17-02954
StatusFinaled
Name ENERGY ENTERPRISE GROUP LLC
Site Address 6360 S FEDERAL WAY
Project Name 
Customer Number655
ePlanReviewNo
Description
Alteration: Electrical for TI
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final12/11/201712/11/201712/11/2017PPASS
DetailsEric Story
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Card signed, Final ok..
Final12/7/201712/8/201712/8/2017APART
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Funiture on 1st floor only Temp final for furniture set only
Electrical Rough-In12/7/201712/8/201712/7/2017ACANC
DetailsJames Ady
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
Final11/3/201711/3/201711/3/2017PPART
DetailsJames Ady
2nd Floor Final Phone #: ###-#### Inspection requested via web by Kerri Hamilton 2nd floor only partial final furniture set only ok
Final11/2/201711/2/201711/2/2017PPART
DetailsJames Ady
First floor only Phone #: ###-#### Inspection requested via web by Kerri Hamilton TV recep S entry 2 recep under stairs dead, N closet lights dead, Locker room receps Need GFCI protected, Updated Panel schedules. Furniture set ONLY Partial final ok
Electrical Rough-In10/31/201710/31/201710/31/2017ACANC
DetailsJames Ady
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
Electrical Rough-In10/27/201710/27/201710/27/2017PPASS
DetailsJames Ady
Later in the afternoon if possible please Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceiling only as marked on print ok to cover
Electrical Rough-In10/27/201710/27/201710/27/2017PCANC
DetailsJames Ady
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
Electrical Rough-In10/26/201710/26/201710/26/2017PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Areas marked on print, ceiling only ok to cover
Electrical Rough-In10/25/201710/26/201710/26/2017APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Areas marked on print Ceiling only ok to cover
Electrical Rough-In10/25/201710/25/201710/25/2017PPASS
DetailsJames Ady
Later in the afternoon would be appreciated if possible. Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceiling only as marked on print ok to cover
Electrical Rough-In10/24/201710/24/201710/24/2017PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ceiling only as marked on print ok to cover
Electrical Rough-In10/23/201710/23/201710/23/2017PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Areas marked on print Ceiling only ok to cover
Electrical Rough-In10/19/201710/20/201710/20/2017APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Area marked on print. Ceiling only ok to cover
Electrical Rough-In10/17/201710/18/201710/18/2017APASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 1st floor ceiling as marked on print ok to cover
Electrical Rough-In10/12/201710/12/201710/12/2017PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Electrical Rough-In9/28/20179/28/20179/28/2017PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Underground for floor box and wall only
Electrical Rough-In9/22/20179/22/20179/22/2017PPASS
DetailsJames Ady
Phone #: ###-#### Inspection requested via web by Kerri Hamilton 5 offices 2nd floor only Walls only ok to cover.
Electrical Rough-In9/20/20179/21/20179/21/2017PPASS
DetailsJames Ady
or Dustin at ###-#### Phone #: ###-#### Inspection requested via web by Kerri Hamilton Floor boxes in 3 meeting rooms Ground floor only.
Electrical Rough-In9/14/20179/15/20179/15/2017PPASS
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
1st floor, 1 wall yet to fir out, rest of 1st floor wall rough in ok cover
Electrical Rough-In9/14/20179/15/20179/14/2017ACANC
DetailsJames Ady
Phone #: ###-#### >> Inspection requested via web by Kerri Hamilton Inspection cancelled from web by: Kerri Hamilton
Conference9/6/20179/7/20179/7/2017ADONE
DetailsRock A. Hudson
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
Discussed the protection of electrical equipment where water and sprinkler piping previously installed above, The reusing of TC cable system from 1992 installation, and meeting room requirements.
Drip pans shall be installed to protect electrical equipment.
#10 TC cable shall be reused if compliant with articles 336 and 392.80.
Collabrative rooms over 215 sq. ft. shall comply with 210.71 for floor receptacles and wall space requirements.