Final | 10/18/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Tom Saunders
|
|
|
Victor Phone #: ###-####...1 outlet served...ok to final
|
Permanent Service | 10/19/2017 | 10/19/2017 | 10/19/2017 | A | PASS |
Tom Saunders
|
|
|
Victor Phone #: ###-####...p/s o/h new ok
|
Permanent Service | 10/11/2017 | 10/11/2017 | 10/11/2017 | P | FAIL |
Tom Saunders
|
|
|
Please call ahead for access - Victor Phone #: ###-####...cover for outlet oprerating/upside down...k/o seals needed at service panel...breaker blank needed inside service panel...switch on pole upside down...continuos ground wire from first ground rod to second ground rod...all power to shops need removed/ removal of wires to shops required...3rd inspection with corrections not made...permit holder not competant in doing work
|
Permanent Service | 9/29/2017 | 10/2/2017 | 10/2/2017 | P | FAIL |
Tom Saunders
|
|
|
please call before to meet // Victoriano Phone #: ###-####...
cover for outlet oprerating/upside down...k/o seal needed at service panel...switch on pole upside down...continuos ground wire from first ground rod to second ground rod...all power to shops need removed
|
Permanent Service | 9/8/2017 | 9/11/2017 | 9/11/2017 | P | FAIL |
Rock A. Hudson
|
|
|
Please call ahead to meet on site - Victor Phone #: ###-#### Service Unsafe- 250.52- Permanent service shall have grounding electrode system containing 2 ground rods. 300.15- All terminations shall be in a box. Old feed to house still present and exposed to contact. 240.6- #12 conductors tap off 60 amp feed, 20 amp max required. Insulation has peeled off #12 conductors where exposed to sunlight. * Owner wants to use service on pole for power to build new house on lot. Told to remove all load wiring and install a GFCI protected receptacle outlet on pole for construction. Shop feeders also have illegal tap with bare expose wiring present.
|