Information based on query as of Saturday, June 29, 2024.
Permit Information
Permit NumberELE17-03756
StatusIssued
Name L & K ELECTRIC
Site Address 8329 W GODDARD RD
Project Name 
Customer Number9062
ePlanReviewNo
Description
Addition: New panel from 200 to 200
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
ELE-Aging Inspection8/5/20208/5/20208/5/2020 PEND
DetailsDaryl DeGrange
This permit is still open with the City of Boise. please call 208 ###-#### with a progress report or any questions. If your job is complete, or schedule an final inspection online. Thank you!
Final5/6/20205/6/20205/6/2020PNR
DetailsMark Moncarr
Corbin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg Will need to change out 2in flex and 2-2in 90's to weather rated components
Final4/2/20204/6/20204/6/2020AFAIL
DetailsTom Saunders
Justin Metcalf ###-####
The panel outside. Permission to walk through the gate. Phone #: ###-#### Inspection requested via web by Samatha Solberg....

1) every circuit and circuit modification shall be legibly identified as to its clear, evident, and specific purpose or use...408.4
2) PVC shall be strapped..300
3) LB cover needs installed correctly..110.3
4) Boise City ordinance...no code violation shall be retained...work done out of scope but also done without permits need addressed at service
Permanent Service2/12/20202/18/20202/18/2020AFAIL
DetailsTom Saunders
Justin Metcalf ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...no access
Permanent Service2/13/20202/14/20202/14/2020ACANC
DetailsTom Saunders
Justin Metcalf ###-####
Final permanent service Phone #: ###-#### Inspection requested via web by Samatha Solberg...
scheduled twice...moving to 2nd day scheduled for 2/18
ELE-Aging Inspection2/6/20202/6/20202/7/2020 FAIL
DetailsTom Saunders
contractor required to schedule final inspection
access needed to verify service completion
ELE-Aging Inspection11/7/201911/7/201911/7/2019 FAIL
DetailsTom Saunders
contractor required to schedule final inspection
access needed to verify service completion
Permanent Service11/7/201711/7/201711/7/2017PPASS
DetailsTom Saunders
David Joseph ###-#### Phone #: ###-#### Inspection requested via web by Samatha Solberg...p/s u/g rec ok