Permit Information
Permit NumberELE17-03834
StatusFinaled
Name KC ENTERPRISES
Site Address 5257 W FAIRVIEW AVE
Project Name 
Customer Number 
ePlanReviewNo
Description
New: Demo and remove all unused wiring in the throughout the building. Provide and install all new electrical in the remodeled areas, including walls and ceilings, corridors, entries, upgrade the power to the electric heat systems. Most work is on the 1st flo
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/20/20182/21/20182/21/2018APASS
DetailsRock A. Hudson
Requesting Final Inspection for 1st floor. Randy Fox will be on site to assist , if needed. Phone #: ###-#### Inspection requested via web by Kurt Carlson
Final ok
Final1/25/20181/25/20181/25/2018AFAIL
DetailsRock A. Hudson
Large office areas on the east and west ends (north side) are ready for final inspection. Randy Fox will be on site. Call with any questions ###-#### Kurt Carlson Phone #: ###-#### Inspection requested via web by Kurt Carlson
210.8- Receptacle located in vanilla space shall have GFCI protection for construction. 300.15- Several wires in misc rooms, bathroom open and wiring not terminated in a boxes in baths. Dishwashers in break rooms not terminated. Walked all office and few receptacle covers missing and 2 gang junction boxes open. Non electrical furniture in place unable to check all receptacles. Will recall when ready.
Electrical Rough-In1/8/20181/8/20181/8/2018APASS
DetailsRock A. Hudson
Requesting a ceiling overhead rough in , Northwest end of building. all seismic wires to boxes and lights are installed. I will be on site.
Thanks Kurt Phone #: ###-#### Inspection requested via web by Kurt Carlson
Area noted grid rough in ok cover
Electrical Rough-In1/3/20181/3/20181/3/2018PPASS
DetailsRock A. Hudson
Requesting a overhead ceiling rough in, for East end area. Lighting seismic wires for all fixtures are installed, existing raceways have been strapped and supported, new equipment installed. Phone #: ###-#### Inspection requested via web by Kurt Carlson
Area noted east grid rough in ok cover
Electrical Rough-In12/27/201712/27/201712/27/2017PPASS
DetailsRock A. Hudson
As per (316) structural inspector drywall accounts for 2.3 lbs per sq. in. of a 10 lbs per sq. in. rated ceiling system so the amount of MC cables on grid not a concern. As per 316 and 445 hard lid rough in ok cover. As noted on contractor print.
Electrical Rough-In12/25/201712/26/201712/26/2017AFAIL
DetailsRock A. Hudson
Requesting a ceiling / rough in inspection for the main corridor, new corridore will be hard rock lid. I will be on site, to show area for inspection. Phone #: ###-#### Inspection requested via web by Kurt Carlson
300.11- Suspended ceiling system shall not be used to support cables unless manufacturers instructions state ceiling system rated for support.
Electrical Rough-In12/20/201712/20/201712/20/2017APASS
DetailsDaryl DeGrange
I will meet you on site, need specific area walls and ceiling inspected.
thanks Kurt Phone #: ###-#### Inspection requested via web by Kurt Carlson Rough-in ok cover walls as marked and dated on plans
Electrical Rough-In11/22/201711/22/201711/22/2017APASS
DetailsDaryl DeGrange
Requesting partial inspection of walls. I will be on site to show areas requested. Thnak''s Kurt Carlson Phone #: ###-#### Inspection requested via web by Kurt Carlson Rough-in ok cover walls marked and dated on plans
Electrical Rough-In11/16/201711/16/201711/16/2017PPASS
DetailsRock A. Hudson
Requesting a partial rough in inspection, located on the east end of the building. I will meet on site, we will have a check off plan available for the inspector to show inspection locations. Thanks Kurt Phone #: ###-#### Inspection requested via web by Kurt Carlson
As noted on contractor print wall rough in east of lobby rough in ok cover.