Permit Information
Permit NumberELE17-03918
StatusFinaled
Name LOTT ELECTRIC INC
Site Address 13681 W CHINDEN BLVD
Project Name 
Customer NumberStrbucksB
ePlanReviewNo
Description
New: Provide conduits/branch circuitry for full complete electrical system. Install light fixtures.
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final3/6/20183/7/20183/7/2018APASS
DetailsTom Saunders
Final electrical inspection please Phone #: ###-#### Inspection requested via web by Kyle Lott..job complete...ok to final
Final2/21/20182/21/20182/21/2018PPART
DetailsMark Moncarr
Final please Phone #: ###-#### Inspection requested via web by Kyle Lott Partial final. Reader board needs to be set in place. All other corrections made. Electrician is going to make new panel schedules upon final.
Final2/14/20182/15/20182/15/2018AFAIL
DetailsTom Saunders
Final inspection please. Phone #: ###-#### Inspection requested via web by Kyle Lott...

1) outside GFI needs outdoor rated
2) open junction box in ceiling above panels
3) double GFI protection on kitchen circuits
4) GFIs need to be readily accessible
5) finishe exterior reader/order/menu boards
Final2/11/20182/12/20182/12/2018PNR
DetailsTom Saunders
Final please. Have a bless week! Phone #: ###-#### Inspection requested via web by Kyle Lott...requested by mistake...need ceiling cover..checked some GFI protection while there
Electrical Rough-In2/12/20182/12/20182/12/2018PPASS
DetailsTom Saunders
Final please. Have a bless week! Phone #: ###-#### Inspection requested via web by Kyle Lott...full ceiling ok to cover
Electrical Rough-In1/25/20181/26/20181/26/2018APASS
DetailsTom Saunders
Partial ceiling inspection please. Also, contractor is requesting to do border where ceiling grid is installed. Thank you. Phone #: ###-#### Inspection requested via web by Kyle Lott...ok to cover grid area excluding panel area and back room
Conference1/18/20181/18/20181/18/2018PDONE
DetailsRock A. Hudson
Discussed with general foreman what needed for temp occupancy so store could be stocked. Informed general foreman and electrical wireman on site will not grant TCO with out electrical contractors request and areas wanting to stock must be called in and checked prior to stocking with materials. Inspector shall have access to all electrical boxes, equipment, and connections prior to stocking.
Electrical Rough-In12/20/201712/21/201712/21/2017PPASS
DetailsTom Saunders
Rough in please. Have a bless Christmas!!! Phone #: ###-#### Inspection requested via web by Kyle Lott...exterior walls drive thru area, bathrooms, back employee area, other areas discussed with contractor
Electrical Rough-In11/29/201711/29/201711/29/2017APASS
DetailsTom Saunders
Underground inspection please. Phone #: ###-#### Inspection requested via web by Kyle Lott...TI underground, floor boxes and feeds..ok to cover